DAFTAR HARGA SATUAN UPAH DAN BAHAN CADANGAN ARSIP SURVEY NO
URAIAN
SATUAN
HARGA DASAR (Rp)
HG. PASAR/ AKTUAL (Rp) 2012 SMT I
A 1 2 3 4 5 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
UPAH Kepala Tukang Tukang Mandor Pekerja Tidak Terlatih Pekerja Terlatih BAHAN/MATERIAL Aluminium Foil Alcubond Amplas Biasa Amplas Niken Atap Aluminium Zink Coated (seng) tebal 0,25 mm Atap Aluminium Zink Coated (seng) tebal 0,3 mm Atap Aluminium Zink Coated (seng) tebal 0,4 mm Atap Aluminium Zincalume, tebal 0,25 mm Atap Aluminium Zincalume, tebal 0,3 mm Atap Aluminium Zincalume, tebal 0,4 mm Atap Aluminium Gelombang tebal 0,5 mm Atap Fiber warna"Polycarbonat" tbl. 4-5 mm Atap Genteng Beton Lokal Atap Genteng Beton Atap Genteng Beton Cisangkan Atap Genteng Buleleng Atap Genteng Keramik biasa berglazur Atap Genteng Keramik Berglazur Natural Atap Genteng Keramik sejenis Berglazur warna Atap Genteng Metal Biasa (88 cm X 77 cm) Atap Genteng Metal Warna (120 cm X 76 cm) Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) Atap Genteng Metal Zincalume berpasir (77cmX100cm) Atap Genteng Metal Zincalume berpasir biasa Atap Genteng Kodok Atap Onduline Asbes polos 100 x 100 tbl = 4 mm Asbes Gelombang Kecil, lebar 80 cm Asbes Gelombang Kecil, lebar 105 cm Asbes Gelombang Besar, lebar 105 cm Asbes Gelombang motif genteng Aquaproof Bak Cuci Stainless Steel Bak Cuci Teraso Bak Fibreglass Bak Teraso Bambu dia. 6-8 cm/6m Batako Batu Andesit hitam kecoklatan Batu alam kecoklatan (Sangarong) Batu Bata lobang Batu Bata Kecil Batu Bata Lobang Batu Candi hitam Batu Kali Batu Kali tempel Batu Karang Pilang Batu Kerikil Batu Koral beton Batu Koral Jagung
Oh Oh Oh Oh Oh
m2 m2 Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr m2 buah buah buah buah buah buah buah m2 m2 m2 m2 m2 buah m2 Lbr m2 m2 m2 m2 kg buah buah buah buah Btg buah m2 m2 m3 buah buah m2 m3 m2 m2 m3 m3 m3
90,000.00 75,000.00 90,000.00 50,000.00 60,000.00
15,000.00 500,000.00 3,500.00 5,000.00 40,000.00 50,000.00 76,000.00 56,000.00 78,000.00 88,000.00 105,000.00 65,000.00 3,000.00 3,900.00 6,000.00 1,700.00 7,300.00 9,000.00 13,500.00 30,000.00 72,000.00 138,000.00 78,000.00 67,000.00 700.00 80,000.00 18,500.00 29,500.00 30,500.00 33,500.00 24,250.00 43,000.00 180,000.00 100,000.00 310,000.00 180,000.00 45,000.00 2,500.00 250,000.00 185,000.00 441,830.00 700.00 600.00 200,000.00 360,000.00 62,500.00 500,000.00 350,000.00 310,000.00 350,000.00
90000-100000/ Oh 75000-75000/ Oh 90000-100000/ Oh 45000-50000/ Oh 50000-60000/ Oh
15.000/M2 500.000-525.000/M2 3.500 / Lbr 5.000-5.500 / Lbr 40.000/Lbr 50.000/Lbr 76.000/Lbr 56.000/Lbr 78.000/Lbr 88.000/Lbr 105.000/Lbr 65.000-65.500/M2 3000/ buah 3900-4000/ buah 5500-6500/ buah 1700/ buah 7300/ buah 9000-9250/ buah 12000-15000/ buah 27.000-32.000/M2 72.000/M2 138.000/M2 78.000/M2 67.000/M2 700-750/ Buah 80.000/ M2 18.000-19.000 / Lbr 29.500/M2 30.500/M2 33.500/M2 24.250/M2 42.000-47.000/ Kg 180.000-270.000/ Buah 100.000/ Buah 310.000-325.00/ Buah 180.000/ Buah 45.000/ Btg 2200-2500/ Buah 250.000/ M2 180.000-190.000/ M2 430.100-453.560/M3 600-800/ Buah 560-600/ Buah 200.000-250.000/ M2 360.000/ M3 60.000-65.000/ M2 500.000/ M2 350.000/ M3 300.000-350.000/ M3 260.000-320.000/ M3
NO 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112
URAIAN Batu Krokos Batu Palimanan kuning/hijau Batu Palimanan kuning/hijau + bevel Batu Pecah 0.5 - 1 (screen) Batu Abu 0.00 - 0.5 (filler) Batu Pecah 1.3 - 1.9 (spilt) Batu Pecah 2/3 Batu Pecah 3/5 Batu Pecah 5/7 Batu Marmer Batu Roster / Terawang biasa Besi dia. 5 mm Besi dia. 6 mm KS Besi dia. 8 mm KS TI Besi dia. 10 mm KS TI Besi dia. 12 mm KS TI Besi dia. 14 mm KS TI Besi dia. 16 mm KS TI Besi dia. 19 mm KS TI Besi Beton Polos Besi Baja Profil WF, I dan H Besi Baja Konstruksi ( CNP, INP,dan besi L) Besi Beam Clamp dan Plat Siku Besi Hollow baja 20 X 40, tb. 2mm Besi Hollow baja 40 X 40, tb. 2mm Besi Hollow baja 30 X 60, tb. 2mm Besi Hollow Plafond 2 X 4 Besi Strip Besi Strip 2 X 3 Beton Ready Mix K - 125 Beton Ready Mix K - 175 Beton Ready Mix K - 225 Beton Ready Mix K - 250 Beton Ready Mix K - 275 Beton Ready Mix K - 300 Beton Ready Mix K - 350 Beton Ready Mix K - 400 Bubungan Asbes Gelombang Besar Bubungan Asbes Gelombang Kecil Bubungan/Nok Genteng Beton Bubungan Genteng Buleleng Bubungan/ Nok genteng Keramik biasa berglazur Bubungan/Nok genteng Keramik sejenis berglazur Bubungan gtg Keramik sejenis warna berglazur Bubungan/Nok Genteng Metal/aluminium Bubungan Genteng Kodok Cat Dasar Cat Antara Cat Kayu dan Besi Anti Rayap Cat Khusus Glossy dan Quick Drying Cat Minyak warna (biasa) mutu C Cat Minyak mutu B Cat Minyak Semprot Cat Meni Besi Cat Meni Besi /kayu/ Flincote Cat Penutup Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) Cat Tembok mutu B (Catylax,vinilex, dan sejenis) Cat Tembok mutu B, Anti Lumut dan Jamur Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) Closed Duduk Setara (sejenis standar KIA) Closed Duduk Standar (sejenis Ex.TOTOC721FV1)
SATUAN m3 m2 m2 m3 m3 m3 m3 m3 m3 m2 buah Batang Batang Batang Batang Batang Batang Batang Batang kg kg kg m2 Batang Batang Batang Batang kg M' m3 m3 m3 m3 m3 m3 m3 m3 m' m' Buah Buah Buah Buah Buah M' Buah kg kg kg kg kg kg kg kg kg kg kg kg kg kg unit unit
HARGA HG. PASAR/ DASAR (Rp) AKTUAL (Rp) 350,000.00 350.000/ M3 130,000.00 130.000-150.000/ M2 150,000.00 150.000/ M2 275,000.00 265.000-285.000/ M3 275,000.00 265.000-285.000/ M3 380,000.00 380.000-400.000/ M3 400,000.00 400.000-415.000/ M3 390,000.00 390.000/ M3 390,000.00 390.000/ M3 258,000.00 258.000/ M2 2,500.00 2.500/ Buah 14,000.00 14.000-16.500/ Batan 18,000.00 18.000-25.000/ Batang 41,000.00 41.000-42.000/ Batang 63,000.00 61.000-64.000/ Batang 91,000.00 90.000-94.000/ Batang 100,000.00 100.000/ Batang 162,000.00 162.000/ Batang 228,000.00 228.000/ Batang 11,200.00 11.200/ kg 12,000.00 12.000/ kg 12,500.00 12.000-13.000/ kg 22,500.00 21.000-24.000/ kg 107,000.00 94.000-107.000/ Btg 138,000.00 125.000-138.000/ Btg 195,000.00 160.000-200.000/ Btg 22,000.00 21.000-22.500/ Btg 7,500.00 7.000-8.000/ kg 3,250.00 3.250/ M' 650,000.00 640.000-660.000/ M3 690,000.00 680.000-700.000/ M3 705,000.00 700.000-710.000/ M3 745,000.00 740.000-750.000/ M3 770,000.00 770.000-780.000/ M3 785,000.00 780.000-790.000/ M3 810,000.00 800.000-810.000/ M3 855,000.00 850.000-860.000/ M4 22,750.00 22.750/M2 21,000.00 21.000/M2 5,500.00 5.500/Buah 2,500.00 2500-2500/ buah 6,500.00 6.000-7.000/Buah 12,500.00 12.000-13.000/Buah 17,500.00 17.000-18.000/Buah 23,500.00 21.000-26.000/M' 1,875.00 1.750-2.000/Buah 24,000.00 24.000/ Kg 19,000.00 18.000-20.000/ Kg 23,000.00 22.000-24.000/ Kg 20,500.00 20.000-21.000/ Kg 29,000.00 29.000/ Kg 40,000.00 56.000/ Kg 50,000.00 50.000/ Kg 37,000.00 37.000/ Kg 32,250.00 40.000/ Kg 72,500.00 70.000-75.000/ Kg 9,500.00 9.500/ Kg 15,000.00 15.280-16.000/ Kg 17,500.00 17.000/ Kg 70,000.00 70.000/ Kg 1,250,000.00 1250.000-1250.000/ Unit 2,100,000.00 2.100.000/ Unit
NO 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174
URAIAN Closed Duduk Halmar Closed Duduk mutu C Closed Duduk mutu A Closed Duduk mutu B Closed Duduk standar Closet Duduk / Monoblok Closet Jongkok Porselen / biasa Closet Jongkok Teraso Closed Jongkok Standart / sejenis (mutu B) Closed Jongkok sejenis ( mutu A) Shower Spray TX 403 SV 3 Coneblock biasa tebal 6 cm Coneblock warna tebal 6 cm Coneblock biasa tebal 8 cm Coneblock warna tebal 8 cm Cornice (bubuk Semen putih utk gypsum) Dempul Jadi Dempul Ross Polac Dempul Isamu Dolken Kayu dia. 8 - 10/400 cm Door Closer Door Holder Door Stoper Door Stop Ember hitam Engsel Biasa Engsel Kuningan 4" Engsel Pintu Epoxi Eternit 100 x 100 tebal 2,7 mm Eternit 100 x 100 tebal 3,5 mm Filler Fitting plafond listrik Glass Block Grendel/Slot Tanam 4" Grendel biasa Gypsum Board ( 120 x 240 x 9 ) mm Hordeng Horizontal Blind (aluminium) Hordeng Vertikal Blind Ijuk Jendela Aluminium + Kaca Reyband 5 mm Jendela Besi Jendela Bingkai Nako 100 cm X 70 cm Jendela Bingkai Nako Kabel NYA 1,5 mm Kabel NYA 2,5 mm Kabel NYA 4.0 mm Kabel NYM 2 X 1,5 mm Kabel NYM 2 X 2,5 mm Kabel NYM 2 X 4,0 mm Kaca Cermin 3 mm Kaca Cermin 5 mm Kaca Patri Kaca Bening 3 mm Kaca Bening 4 mm Kaca Bening 5 mm Kaca Bening 8 mm Kaca Bening 10 mm Kaca Buram 12 mm Kaca Rayband 5 mm Kaca Buram/Es 5 mm Bingkai Kaca Nako
SATUAN unit unit unit unit unit bh buah buah unit Unit buah buah buah buah buah kg kg kg kg m3 buah buah buah buah buah buah buah buah kg Lbr Lbr m3 buah buah buah buah lbr m2 m3 Kg m2 m2 Unit m2 m' m' m' m' m' m' m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Set
HARGA HG. PASAR/ DASAR (Rp) AKTUAL (Rp) 3,062,000.00 3.062.000/ Unit 1,715,000.00 1.715.000/Unit 4,270,000.00 4.270.000/ Unit 2,593,000.00 2.593.000/ Unit 2,151,000.00 2.151.000/ Unit 400,000.00 400.000/ Buah 80,000.00 75.000-85.000/ Buah 25,000.00 25.000/ Buah 145,000.00 145.000/ Unit 200,000.00 200.000/ Unit 325,000.00 325.000/ Buah 1,300.00 1.300/ Buah 1,500.00 1.500/ Buah 1,800.00 1.800/ Buah 2,000.00 2.000/ Buah 5,000.00 5.000/ Kg 12,500.00 12000-12500/ Kg 21,250.00 85000/ 4 Kg 40,000.00 40.000/Kg 275,000.00 275.000/M3 380,000.00 380.000/ Buah 30,000.00 20.000-40.000/ Buah 300,000.00 300.000/ Buah 22,000.00 22.000/ Buah 5,000.00 3.500-5.000/ Buah 6,000.00 5.000-6.000/ Buah 10,000.00 10.000-22.000/ Buah 10,000.00 10.000-22.000/ Buah 42,500.00 40.000-45.000/ Kg 12,000.00 11.000-12.000/ Lbr 14,000.00 14.000/ Lbr 172,500.00 170.000-175.000/M3 5,000.00 5000/Buah 17,000.00 17.000/Buah 72,500.00 70.000-75.000/Buah 13,500.00 12.000-15.000/Buah 60,000.00 57.000-60.000/ Lbr 87,500.00 85000-90000/ M2 90,000.00 85000-90000/ M2 7,000.00 7000/ Kg 675,000.00 675.000/ M2 250,000.00 200.000-300.000/ M2 75,000.00 75.000/ M2 95,000.00 95.000/ M2 3,500.00 3.500/ M' 3,000.00 4.000/ M' 4,500.00 4.500/ M' 4,500.00 4.000-5.000/ M' 7,250.00 6.000-8.000/ M' 14,500.00 14.000-15.000/ M' 120,000.00 120.000-120.000/ M2 3,400,000.00 325.000-350.000/ M2 1,200,000.00 1.150.000-1.250.000/ M2 65,000.00 62.500-65.000/ M2 95,000.00 75.000-90.000/ M2 122,500.00 120.000-125.000/ M2 165,000.00 165.000-170.000/ M2 200,000.00 200.000/ M3 350,000.00 350.000/ M2 142,500.00 140.000-145.000/ M2 90,000.00 90.000/ M2 25,000.00 25.000/ M2
NO 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227
URAIAN Kaca Naco 6 daun Kaca Naco 8 daun Kaca Naco Rayben 5 mm, 6 daun Kaca Naco Rayben 5 mm, 8 daun Kait angin Jendela Kalsiboard 3,5 mm (120 cm X 240 cm) Kalsiboard 4,5 mm (120 cm X 240 cm) Kapur Karpet tebal 6 mm Kawat Beton Kawat Burung Kawat Duri Kawat Harmonika Kawat Jaring pagar Kawat Kassa Kawat Las Kawat Nyamuk Kawat Seng Polos Kayu Gelam dia. 6-8 Kayu Gelam dia. 10-12 Kayu Hek Kayu Lis 1/3 Kayu Lis 1/4 Kayu Lis Profil kecil Kayu Lis Profil sedang Kayu Lis Profil besar Kayu Mosaik 30 x 30 cm Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Kayu Kelas I (Unglen, Jati) Kayu Kelas II (Petanang dan sejenis) Kayu Kelas III (Meranti dan sejenis) Kayu Papan 3/20 Kls. III Kayu Kelas IV (Racuk dan sejenis) Kayu Papan kelas IV Kayu Racuk Kayu Reng Keramik lantai/dinding 20 x 20/25 cm putih polos Keramik lantai/dinding 20 x 20/25 cm putih polos Keramik lantai 20 x 20 cm warna, mutu C Keramik lantai 20 x 20 cm warna, mutu C Keramik lantai 20 x 20 cm warna, mutu B Keramik lantai 20 x 20 cm warna, mutu B Keramik dinding 20 x 25 cm warna Keramik dinding 20 x 25 cm warna Keramik lantai 20 x 25 cm warna, mutu B Keramik lantai 20 x 25 cm warna, mutu B Keramik lantai 30 x 30 cm warna Keramik lantai 30 x 30 cm warna Keramik lantai 30 x 30 cm putih polos Keramik lantai 30 x 30 cm putih polos Keramik lantai 40 x 40 cm warna mutu C Keramik lantai 40 x 40 cm warna mutu C Keramik lantai 40 x 40 cm warna mutu B Keramik lantai 40 x 40 cm warna mutu B Keramik lantai motif kayu (kasar) mutu A Klem Talang Paralon Klem kabel listrik biasa Klem kabel listrik Korosin Kran Air Kuas 3"-4" Kunci Gembok
SATUAN Set Set Set Set Buah Kpg Kpg kg m2 kg m2 m' m2 lbr m2 Dos m2 kg btg btg btg m' m' m' m' m' Buah Btg m3 m3 m3 m3 m3 keping m3 btg Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak Buah Buah Buah Ltr buah buah buah
HARGA HG. PASAR/ DASAR (Rp) AKTUAL (Rp) 127,500.00 125.000-130.000/ Set 142,500.00 140.000-145.000/Set 167,500.00 165.000-170.000/Set 177,500.00 175.000-180.000/Set 12,500.00 12500 49,000.00 49.000/ Kpg 53,000.00 53.000/ Kpg 4,000.00 3.000-3.000/ Kg 68,750.00 250.000-300.000/ Roll 20,000.00 16.000-20.000/ Kg 20,000.00 20.000/ M2 13,000.00 13.000/ M' 35,000.00 35.000/ M2 25,000.00 25.000/ lbr 10,000.00 10.000/ M2 100,000.00 100.000/ Dos 22,000.00 22.000/ M2 15,500.00 15.000 - 16.000/ Kg 15,000.00 15.000-16.00/ Batang 17,000.00 17.000-18.000/ Batang 12,500.00 12.500/ Batang 4,000.00 4.000-5.000/ Btg 5,000.00 5.000-6.000/ Btg 1,500.00 5.000-7.000/ Btg 3,000.00 9.000-15.000/ Btg 6,500.00 25.000-27.000/ Btg 5,500.00 5.000-6.000/Buah 55,000.00 55.000/Btg 7,500,000.00 7.500.000-8.500.000/ M3 5,000,000.00 5.500.000-6.500.000/ M3 2,500,000.00 2.500.000-3.000.000/ M3 2,500,000.00 2.500.000/ M3 1,500,000.00 1.500.000/ M3 30,000.00 30.000-35.000/ Kpg 1,500,000.00 1.500.000/ M3 20,000.00 20.000/ Batang 40,000.00 40.000/ ktk 1,840.00 1.200-1.400/ Buah 35,000.00 35.000/ ktk 1,400.00 1.400-1.600/ Buah 50,000.00 38.000-60.000/ ktk 2,000.00 1.400-1.600/ Buah 45,000.00 40.000-50.000/ ktk 2,250.00 2.250/ Buah 50,000.00 40.000-50.000/ ktk 2,500.00 2.500/ Buah 45,000.00 40.000-50.000/ ktk 5,000.00 5.000/ Buah 32,000.00 33.000-35.000/ ktk 4,000.00 3.600/ Buah 51,000.00 51.000/ ktk 8,500.00 8.500/ Buah 93,000.00 93.000/ ktk 15,500.00 15.500/ Buah 54,000.00 54.000-115.000/ ktk 2,500.00 2.000 - 2.500/ Buah 75.00 50 - 100/ Buah 2,750.00 2.500 - 3.000/ Buah 2,000.00 2.000 - 2.000/ Ltr 8,500.00 7.000 - 10.000/ Buah 8,000.00 8.000/ Buah 7,000.00 7.000/ Buah
NO 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289
URAIAN Kunci Lemari Kunci Pintu Kamar Tidur (Hotel) Kunci Pintu KM/WC (lux) Kunci Selot Kunci Tanam biasa mutu C Kunci Tanam 2 slaag biasa Kunci Tanam 2 slaag mutu B Kunci Tanam Kamar Mandi L.bow listrik Lampu Down Light Lampu Hologen 50 watt Lampu Hologen 150 watt Lampu Hologen Box Lampu TL 10 Watt Lampu TL 20 Watt Lampu TL 40 Watt (bambu) Lampu Pijar 25 Watt Putih Lampu Pijar 40 Watt Putih Lantai Granit 30/30 Lantai Granit 40/40 Lantai Granit 60/60 Lantai Kayu Panil Gracewood Las dop listrik Lem Kayu Lem Vinyl List Gypsum Besar List Gypsum Kecil Mangkok Saklar listrik MCB MCB Box isi 4 grup MCB Box isi 8 grup Melamic Clear Melamic Gloss/dop (Finishing) Mill Minyak Bekisting Minyak Cat Minyak solar untuk industri / Minyak aspal Minyak Gardan Minyak Hidrolik Minyak Selinder Mozaik kayu lantai Uk. 30 x 30 cm Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Paku Biasa bermacam ukuran 2" - 5" Paku Biasa 1/2" - 1" Paku Sumbat Paku Beton Paku Gypsum Paku Seng,Asbes Paku Asbes Paku Sekrup 3,5" Paku Sekrup 3,5" Parquet Jati Pasir Beton / Pasang Pasir Urug Pewarna nat Pintu Alluminium Pintu Besi Baja Pintu Lipat Pintu PVC lengkap Pipa besi medium 2 mm & 1/2", pjg 6 m Pipa besi medium 2 mm & 3/4", pjg 6 m
SATUAN buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah Buah Buah Buah m2 Buah ltr Kg m' m' Buah Buah Buah Buah kg kg kg liter liter liter liter liter liter buah Unit Unit kg kg buah buah kg kg buah Kg buah m2 m3 m3 Bks m2 m2 m2 Unit M' M'
HARGA DASAR (Rp) 7,000.00 450,000.00 360,000.00 12,500.00 25,000.00 50,000.00 85,000.00 22,500.00 2,500.00 37,500.00 9,000.00 37,500.00 30,000.00 45,000.00 65,000.00 75,000.00 11,000.00 12,000.00 17,100.00 36,800.00 104,400.00 352,500.00 1,000.00 12,000.00 7,000.00 19,000.00 14,000.00 900.00 15,000.00 17,500.00 32,500.00 52,500.00 52,500.00 29,500.00 10,000.00 5,000.00 4,200.00 15,500.00 23,500.00 15,500.00 7,500.00 310,000.00 340,000.00 15,000.00 18,000.00 475.00 550.00 25,000.00 20,000.00 475.00 45,000.00 450.00 385,000.00 85,000.00 75,000.00 8,500.00 575,000.00 1,750,000.00 337,500.00 185,000.00 11,250.00 14,583.33
HG. PASAR/ AKTUAL (Rp) 12.000/ Buah 450.000/ Buah 360.000/ Buah 12.500/ Buah 20.000-25.000/ Buah 70.000-75.000/ Buah 90.000/ Buah 20.000-25.000/ Buah 2.500/ Buah 25.000-50.000/ Buah 8.000-10.000/ Buah 35.000-40.000/ Buah 25.000-35.000/ Buah 45.000-45.000/ Buah 60.000-70.000/ Buah 70.000-80.000/ Buah 10.000-12.000/ Buah 12.000/ Buah 180.000-200.000/ M2 225.000-235.000/ M2 285.000-295.000/ M2 350.000-355.000/ M2 1.000/ buah 12.000/ Buah 7.000/ Kg 18.000-20.000/ Buah 13.000-15.000/ Buah 800 - 1.000/ buah 15.000-15.000/ Buah 15.000-20.000/ Buah 30.000-35.000/ Buah 52.500/Kg 52.500/Kg 29.000-30.000/Kg 9.000-10.000/ Ltr 5.000/ Ltr 4.200/Ltr 15.000-16.000/Ltr 23.000-24.000/Ltr 15.000-16.000/Ltr 7.000-8.000/Buah 310.000-310.000/Unit 310.000-310.000/Unit 13.000-15.000/Kg 13.000-19.000/Kg 450-500/Buah 400-600/Buah 25.000/Kg 17.500-25.000/Kg 25000-45000/Kg 44.000-46.000/Kg 440-460/Buah 375.000-395.000/M2 80.000-85.000/M3 75.000-80.000/M3 8.500-9.000/Bks 575.000/M2 1.500.000-2.000.000/M2 275.000-400.000/M2 185.000- 187.000/Unit 11.250/m' 14.583,33/m'
NO
URAIAN
290 291 292 293 294
Pipa besi medium 2 mm Pipa besi medium 2 mm Pipa besi medium 2 mm Pipa besi medium 2 mm Pipa besi medium 2 mm
295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337
Pipa besi medium 2 mm & 4", pjg 6 m Pipa paralon listrik 5/8" Pipa PVC & 1/2" mutu A (Wavin dan sejenis) Pipa PVC biasa & 1/2" mutu B Pipa PVC & 3/4" mutu A (Wavin dan sejenis) Pipa PVC & 3/4" mutu B Pipa PVC & 1" mutu A (Wavin dan sejenis) Pipa PVC & 1" mutu B Pipa PVC & 1.5" mutu A (Wavin dan sejenis) Pipa PVC & 1.5" mutu B Pipa PVC & 2" mutu A ( Wavin dan sejenis) Pipa PVC & 2" mutu B Pipa PVC & 3" mutu A (Wavin dan sejenis) Pipa PVC & 3" mutu B Pipa PVC & 4" mutu A ( Wavin dan sejenis) Pipa PVC & 4" mutu B Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) Pipa Stainless 2", tebal 1 mm Pipa Stainless 2", tebal 0.8 mm Pipa Stainless 2,5", tebal 1 mm Pipa Stainless 2,5", tebal 1.2 mm Plamir Tembok Plamir Kayu Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Plint keramik 10 x 30 cm warna Plint keramik 10 x 40 cm warna Plint Ubin PC Abu-abu 15 x 20 cm Plint Ubin PC Abu-abu 10 x 30 cm Plint Ubin PC Abu-abu 10 x 40 cm Plywood warna/Jabarwood Plywood Jati 3 mm Plywood Sungkay 3 mm/ megatick Plywood 3 mm Plywood 4 mm Plywood 6 mm Plywood 9 mm Plywood 12 mm Plywood 20 mm Politur dasar Politur Jadi Porselin Putih Uk. 10 x 10 cm Porselin Warna Uk. 10 x 10 cm Rangka Atap baja ringan untuk atap genteng, genteng keramik, beton, dll + pemasangan Rangka Atap baja ringan untuk atap seng metal, atap asbes, aluminium, sirap, dll + pemasangan Rangka Atap baja ringan bentuk joglo/bertumpuk/ khusus + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Pelana, Metal dan keramik + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Perisai, Metal dan keramik + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Joglo, Metal dan keramik + pemasangan Rel Pintu Dorong Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) Rolling Door Standar, t=5 mm, (minimal pas. 7 M2)
338 339 340 341 342 343 344 345
& & & & &
1", pjg 6 m 1,5", pjg 6 m 2", pjg 6 m 2,5", pjg 6 m 3", pjg 6 m
M' M' M' M' M'
HARGA DASAR (Rp) 17,833.33 24,833.33 31,666.67 31,666.67 49,250.00
HG. PASAR/ AKTUAL (Rp) 17.833,33/m' 24.833,33/m' 31.666,67/m' 31.666,67/m' 49.250/m'
M' Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg Btg M' M' M' M' kg kg Lbr buah buah buah buah buah Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr ltr ltr buah buah m2
65,500.00 4,500.00 3,750.00 2,000.00 5,375.00 3,000.00 7,375.00 3,750.00 12,750.00 7,750.00 16,000.00 10,000.00 31,500.00 17,000.00 52,250.00 26,750.00 121,500.00 75,000.00 60,000.00 85,000.00 75,000.00 27,500.00 22,000.00 1,550,000.00 3,500.00 11,000.00 725.00 775.00 825.00 85,000.00 110,000.00 110,000.00 42,000.00 55,000.00 85,000.00 110,000.00 147,500.00 177,500.00 27,000.00 45,000.00 400.00 775.00 195,000.00
65.500/m' 10.000/Btg 12.000-15.000/Btg 8.000/Btg 21.500/Btg 18.000/Btg 29.500/Btg 15.000/Btg 51.000/Btg 31.000-33.000/Btg 64.000-66.000/Btg 40.000-42.000/Btg 126.000-128.000/Btg 68.000-70.000/Btg 209.000-211.000/Btg 107.000-109.000/Btg 486.000-488.000/Btg 75.000/Btg 60.000/Btg 85.000/Btg 75.000/Btg 27.000- 28.000/Kg 23.000- 25.000/Kg 1.550.000/Lbr 3.500/Buah 11.000/Buah 700-750/Buah 750-800/Buah 800-850/Buah 80.000-90.000/Lbr 100.000-110.000/Lbr 110.000/Lbr 39.000-45.000/Lbr 49.000-56.000/Lbr 70.000-87.500/Lbr 110.000-145.000/Lbr 145.000-150.000/Lbr 175.000-180.000/Lbr 26.000-28.000/Ltr 45.000/Ltr 300-500/Buah 750-800/Buah 195.000-200.000/M2
m2
165,000.00
165.000-180.000/M2
m2
215,000.00
200.000-230.000/M2
m2
195,000.00
195.000-200.00/M2
m2
215,000.00
200.000-230.000/M2
m2
250,000.00
250.000-270.000/M2
Unit m2 m2
195,000.00 540,000.00 595,000.00
190.000-200.000/M2 540.000/M2 595.000/M2
SATUAN
NO 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371
372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397
C 1
URAIAN Sanding Sealer Impra (Cat dasar) Seal Tape Semen ( 50 kg ) Semen Portland ( PC ) Semen Putih (40 kg) Semen Putih Semen Merah Semen Nat Seng Gelombang, lebar 70 cm Seng Plat 120 cm X 240 cm Seng Plat 33 cm Seng Plat 38 cm Seng Plat 45 cm Seng Plat 55 cm Seng Plat 88 cm Seng Plat 92 cm Sabun Soda Api Soft Board ( 120 x 240 ) mm Saklar Tunggal biasa Saklar Ganda biasa Saklar Tunggal National Saklar Ganda National Scafolding tg 1,77 m X 1,77 m Roda Scafolding 4 buah Smartruss/baja ringan sejenis Aluminium Magnesium - Lysaght Smartruss/sejenis C 75.100 - Lysaght Smartruss/sejenis C 75.75 - Reng U T S 40 - Screw / Dynabolt - Valery Gutter Talang Jurai - Strap Bracing Stop Kontak biasa Stop kontak AC Sunscreen Aluminium T.Duss listrik Talang Paralon, pjg 4 m Tali Ijuk Ijuk Tanah Liat/Urug Tanah Puru Tanah Sirtu Taekwood 3 mm Taekwood 4 mm biasa Ter / Residu Textil Tape Thinner biasa Thinner Cat Glossy (Cobra dan sejenis) Urinoir Urinoir mutu A Vernis Vernis Batu Wallpaper Wastafel biasa Wastafel Halmar Wastafel mutu A Wood Filler Impra (dempul) Wood Stain Impra (cat pewarna)
PERALATAN Compresor
Kg buah Zak kg Zak Kg m3 Bks m2 lbr M' M' M' M' M' M' Kg Kg lbr Buah Buah Buah Buah Unit Unit
HARGA DASAR (Rp) 35,000.00 3,000.00 65,000.00 1,300.00 85,000.00 2,125.00 35,000.00 9,000.00 6,750.00 87,500.00 12,000.00 12,500.00 16,000.00 18,250.00 28,000.00 28,000.00 10,000.00 29,000.00 65,000.00 5,500.00 8,000.00 17,000.00 34,000.00 650,000.00 350,000.00
HG. PASAR/ AKTUAL (Rp) 35.000-35.000/Kg 3.000/Buah 62.000-66.000 / Zak 1.500 /Kg 85.000-110.000 / Zak 1.750-1.875 /Kg 35.000 / M3 9.000 / Bks 6.500 - 7.000 / kaki 85.000 - 90.000 / Lbr 12.000 / M' 12.000 - 13.000 / M' 16.000 - 16.000 / M' 18.000 - 18.250 / M' 28.000 / M' 28.000 - 30.000 / M' 10.000 - 10.000 / Kg 29.000-30.000 / Kg 65.000/ Lbr 5.000-6.000/ Buah 7.000-9.000/ Buah 16.000-18.000/ Buah 32.000-35.000/ Buah 650.000/Unit 350.000/Unit
M' M' M' Buah M' M' Buah Buah M2 Buah btg Kg m3 m3 m3 m3 m2 m2 liter roll Liter Liter buah unit ltr Kg m2 buah unit unit Klg Klg
18,000.00 15,000.00 13,000.00 1,500.00 100,000.00 10,000.00 6,000.00 47,500.00 325,000.00 750.00 41,500.00 10,000.00 21,000.00 50,000.00 51,600.00 60,000.00 29,100.00 31,500.00 3,600.00 6,000.00 13,250.00 17,600.00 1,217,000.00 1,400,000.00 35,000.00 95,000.00 50,000.00 210,000.00 250,000.00 450,000.00 25,000.00 50,000.00
18.000/M' 15.000/M' 13.000/M' 1.500/Buah 100.000/M' 10.000/M' 5.000-7.000/ Buah 45.000-50.000/ Buah 300.000-350.000/ M2 750 /buah 41.000 - 42.000 /btg 10.000 /Kg 21.000 /M3 250.000 / 5 M3 255.000-258.000 / 5 M3 65.000 / M3 29.100 / M2 31.000 - 32.000 / M2 18.000 / 5 Ltr 6.000 - 6.000 /roll 53.000 /4 Ltr 88.000 /5 Ltr 1.217.000 /Unit 1.400.000 /Unit 35.000 /Ltr 95.000 /Kg 250.000-300.000 /roll 210.000-400.000 /Buah 250.000 /Buah 450.000 /Buah 22.000-25.000 /Klg 50.000/Klg
156,000.00
156,000.00
SATUAN
jam
NO
URAIAN
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Concrete Mixer Concrete Pump Concrete Vibrator Dump Truck Excavator Filter Genset Grader Loader Pneumatic Tired Roller Tandem Roller Flatbed Truck 3,5 ton Water Tank Truck Generator Alat Bantu Roller 3 roda Sprayer, Selfprof Buldozer Scaffolding 177cm X 177 cm, Tg. 177 cm Stone Crusher (Pemecah batu) Pengaduk beton Stemper Roller, Vibrator Pneu Water Pump
D 1 2 3 4 5 6 7 8
SERVICE AC Window/Split/Multi Dispenser Kulkas/Freezer Kompor Gas 2T Kompor Gas 4T Mesin Cuci Pompa Air Instalasi listrik
HARGA DASAR (Rp) jam 43,750.00 jam 285,714.29 jam 24,200.00 jam 319,000.00 jam 654,500.00 jam 44,000.00 jam 11,000.00 jam 517,000.00 jam 412,500.00 jam 401,500.00 jam 264,000.00 jam 247,500.00 jam 330,000.00 jam 38,500.00 jam 90,000.00 jam 181,500.00 jam 154,000.00 jam 709,500.00 Set/Bulan 75000-100.000 jam 858,000.00 jam 120,000.00 jam 31,250.00 jam 99,000.00 jam 23,650.00 SATUAN
Ls Ls Ls Ls Ls Ls Ls Ls
HG. PASAR/ AKTUAL (Rp) 350.000/8 Jam 2.000.000/hari/ 7 jam 24,200.00 319,000.00 654,500.00 44,000.00 11,000.00 517,000.00 412,500.00 401,500.00 264,000.00 247,500.00 330,000.00 38,500.00 90.000-100.000/jam 181,500.00 154,000.00 709,500.00 75000-100.000 858,000.00 120,000.00 250.000/8 jam 99,000.00 23,650.00
60,000.00 50,000.00 50,000.00 50,000.00 75,000.00 50,000.00 50,000.00 60,000.00
Palembang,
60,000.00 50,000.00 50,000.00 50,000.00 75,000.00 50,000.00 50,000.00 60,000.00
Februari 2012
Tim Survey, Nama
Tanda tangan
1. Poppy Augustina L, ST., MT
………………………………
2. Ferry Gustiawan, S.Kom
………………………………
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
DAFTAR HARGA SATUAN UPAH, BAHAN BANGUNAN DAN PERALATAN TAHUN 2017 SEMESTER I NO
URAIAN
A 1 2 3 4 5
UPAH Kepala Tukang Tukang Mandor Pekerja Tidak Terlatih Pekerja Terlatih
B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
BAHAN/MATERIAL Aluminium Foil Alcubond Amplas Biasa Amplas Niken Atap Aluminium Zink Coated (seng) tebal 0,25 mm Atap Aluminium Zink Coated (seng) tebal 0,3 mm Atap Aluminium Zink Coated (seng) tebal 0,4 mm Atap Aluminium Zincalume, tebal 0,25 mm Atap Aluminium Zincalume, tebal 0,3 mm Atap Aluminium Zincalume, tebal 0,4 mm Atap Aluminium Gelombang tebal 0,5 mm Atap Fiber warna"Polycarbonat" tbl. 4-5 mm Atap Genteng Beton Lokal Atap Genteng Beton Atap Genteng Beton Cisangkan Atap Genteng Buleleng Atap Genteng Keramik biasa berglazur Atap Genteng Keramik Berglazur Natural Atap Genteng Keramik sejenis Berglazur warna Atap Genteng Metal Biasa (88 cm X 77 cm) Atap Genteng Metal Warna (120 cm X 76 cm) Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) Atap Genteng Metal Zincalume berpasir (77cmX100cm) Atap Genteng Metal Zincalume berpasir biasa Atap Genteng Kodok Atap Onduline Asbes polos 100 x 100 tbl = 4 mm Asbes Gelombang Kecil, lebar 80 cm Asbes Gelombang Kecil, lebar 105 cm Asbes Gelombang Besar, lebar 105 cm Asbes Gelombang motif genteng Aquaproof Bak Cuci Stainless Steel Bak Cuci Teraso Bak Fibreglass Bak Teraso Bambu dia. 6-8 cm/6m Batako Batu Andesit hitam kecoklatan Batu alam kecoklatan (Sangarong) Batu Bata lobang Batu Bata Kecil Batu Bata Lobang Batu Candi hitam Batu Kali Batu Kali tempel Batu Karang Pilang Batu Kerikil Batu Koral beton pecah split 0 s/d 5 mm Batu Koral Jagung Batu Krokos Batu Palimanan kuning/hijau Batu Palimanan kuning/hijau + bevel Batu Pecah 0.5 - 1 (screen) Batu Abu 0.00 - 0.5 (filler)
SATUAN
-9-
HARGA
HARGA SATUAN
HARGA
Swakelola (Rp)
SATUAN Rp.)
DASAR (Rp)
Oh Oh Oh Oh Oh
110,000.00 90,000.00 110,000.00 65,000.00 75,000.00
137,500.00 112,500.00 137,500.00 81,250.00 93,750.00
110,000.00 90,000.00 110,000.00 65,000.00 75,000.00
m2 m2 Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr m2 buah buah buah buah buah buah buah m2 m2 m2 m2 m2 buah m2 Lbr m2 m2 m2 m2 kg buah buah buah buah Btg buah m2 m2 m3 buah buah m2 m3 m2 m2 m3 m3 m3 m3 m2 m2 m3 m3
18,500.00 650,000.00 3,500.00 6,500.00 43,000.00 60,000.00 83,000.00 62,000.00 62,500.00 76,000.00 100,000.00 80,000.00 4,200.00 5,700.00 7,500.00 2,300.00 8,000.00 12,000.00 17,000.00 32,000.00 40,000.00 160,000.00 85,000.00 60,000.00 1,000.00 58,500.00 24,000.00 25,000.00 32,000.00 35,000.00 33,500.00 260,000.00 193,000.00 325,000.00 180,000.00 180,000.00 50,000.00 2,600.00 190,000.00 185,000.00 512,000.00 1,250.00 725.00 225,000.00 350,000.00 93,000.00 594,000.00 400,000.00 421,683.00 400,000.00 375,000.00 168,000.00 168,000.00 330,000.00 330,000.00
23,125.00 812,500.00 4,375.00 8,125.00 53,750.00 75,000.00 103,750.00 77,500.00 78,125.00 95,000.00 125,000.00 100,000.00 5,250.00 7,125.00 9,375.00 2,875.00 10,000.00 15,000.00 21,250.00 40,000.00 50,000.00 200,000.00 106,250.00 75,000.00 1,250.00 73,125.00 30,000.00 31,250.00 40,000.00 43,750.00 41,875.00 325,000.00 241,250.00 406,250.00 225,000.00 225,000.00 62,500.00 3,250.00 237,500.00 231,250.00 640,000.00 1,562.50 906.25 281,250.00 437,500.00 116,250.00 742,500.00 500,000.00 589,603.75 500,000.00 468,750.00 210,000.00 210,000.00 412,500.00 412,500.00
18,500.00 650,000.00 3,500.00 6,500.00 43,000.00 60,000.00 83,000.00 62,000.00 62,500.00 76,000.00 100,000.00 80,000.00 4,200.00 5,700.00 7,500.00 2,300.00 8,000.00 12,000.00 17,000.00 32,000.00 40,000.00 160,000.00 85,000.00 60,000.00 1,000.00 58,500.00 24,000.00 25,000.00 32,000.00 35,000.00 33,500.00 260,000.00 193,000.00 325,000.00 180,000.00 180,000.00 50,000.00 2,600.00 190,000.00 185,000.00 512,000.00 1,250.00 725.00 225,000.00 350,000.00 93,000.00 594,000.00 400,000.00 471,683.00 400,000.00 375,000.00 168,000.00 168,000.00 330,000.00 330,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120
URAIAN
SATUAN m3 m3 m3 m3 m2 buah Batang Batang Batang Batang Batang Batang Batang Batang kg kg kg m2 Batang Batang Batang Batang kg M' m3 m3 m3 m3 m3 m3 m3 m4 m' m' Buah Buah Buah Buah Buah M' Buah kg kg kg kg kg kg kg kg kg kg kg kg kg kg unit unit unit unit unit unit unit bh buah buah
Batu Pecah 1.3 - 1.9 (spilt) Batu Pecah 2/3 Batu Pecah 3/5 Batu Pecah 5/7 Batu Marmer Batu Roster / Terawang biasa Besi dia. 5 mm Besi dia. 6 mm KS Besi dia. 8 mm KS TI Besi dia. 10 mm KS TI Besi dia. 12 mm KS TI Besi dia. 14 mm KS TI Besi dia. 16 mm KS TI Besi dia. 19 mm KS TI Besi Beton Polos Besi Baja Profil WF, I dan H Besi Baja Konstruksi ( CNP, INP,dan besi L) Besi Beam Clamp dan Plat Siku Besi Hollow baja 20 X 40, tb. 2mm Besi Hollow baja 40 X 40, tb. 2mm Besi Hollow baja 30 X 60, tb. 2mm Besi Hollow Plafond 2 X 4 Besi Strip Besi Strip 2 X 3 Beton Ready Mix K - 125 Beton Ready Mix K - 175 Beton Ready Mix K - 225 Beton Ready Mix K - 250 Beton Ready Mix K - 275 Beton Ready Mix K - 300 Beton Ready Mix K - 350 Beton Ready Mix K - 400 Bubungan Asbes Gelombang Besar Bubungan Asbes Gelombang Kecil Bubungan/Nok Genteng Beton Bubungan Genteng Buleleng Bubungan/ Nok genteng Keramik biasa berglazur Bubungan/Nok genteng Keramik sejenis berglazur Bubungan gtg Keramik sejenis warna berglazur Bubungan/Nok Genteng Metal/aluminium Bubungan Genteng Kodok Cat Dasar Cat Antara Cat Kayu dan Besi Anti Rayap Cat Khusus Glossy dan Quick Drying Cat Minyak warna (biasa) mutu C Cat Minyak mutu B Cat Minyak Semprot Cat Meni Besi Cat Meni Besi /kayu/ Flincote Cat Penutup Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) Cat Tembok mutu B (Catylax,vinilex, dan sejenis) Cat Tembok mutu B, Anti Lumut dan Jamur Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) Closed Duduk Setara (sejenis standar KIA) Closed Duduk Standar (sejenis Ex.TOTOC721FV1) Closed Duduk Halmar Closed Duduk mutu C Closed Duduk mutu A Closed Duduk mutu B Closed Duduk standar Closet Duduk / Monoblok Closet Jongkok Porselen / biasa Closet Jongkok Teraso
- 10 -
HARGA Swakelola (Rp) 468,000.00 471,683.00 468,000.00 468,000.00 300,000.00 4,250.00 22,000.00 25,000.00 51,000.00 80,000.00 110,000.00 185,000.00 195,000.00 275,000.00 19,000.00 17,000.00 15,000.00 22,500.00 140,000.00 160,000.00 190,000.00 25,000.00 10,000.00 5,000.00 800,000.00 850,000.00 900,000.00 950,000.00 1,000,000.00 1,050,000.00 1,100,000.00 1,150,000.00 24,000.00 23,500.00 6,000.00 5,200.00 10,000.00 20,000.00 25,000.00 30,000.00 4,000.00 32,000.00 25,000.00 45,000.00 30,000.00 40,000.00 48,000.00 42,000.00 37,000.00 42,000.00 82,000.00 12,500.00 26,000.00 27,500.00 95,000.00 550,000.00 2,250,000.00 3,200,000.00 1,875,000.00 4,400,000.00 2,720,000.00 2,300,000.00 540,000.00 160,000.00 32,000.00
HARGA SATUAN SATUAN Rp.) 585,000.00 589,603.75 585,000.00 585,000.00 375,000.00 5,312.50 27,500.00 31,250.00 63,750.00 100,000.00 137,500.00 231,250.00 243,750.00 343,750.00 23,750.00 21,250.00 18,750.00 28,125.00 175,000.00 200,000.00 237,500.00 31,250.00 12,500.00 6,250.00 1,000,000.00 1,062,500.00 1,125,000.00 1,187,500.00 1,250,000.00 1,312,500.00 1,375,000.00 1,437,500.00 30,000.00 29,375.00 7,500.00 6,500.00 12,500.00 25,000.00 31,250.00 37,500.00 5,000.00 40,000.00 31,250.00 56,250.00 37,500.00 50,000.00 60,000.00 52,500.00 46,250.00 52,500.00 102,500.00 15,625.00 32,500.00 34,375.00 118,750.00 687,500.00 2,812,500.00 4,000,000.00 2,343,750.00 5,500,000.00 3,400,000.00 2,875,000.00 675,000.00 200,000.00 40,000.00
HARGA DASAR (Rp) 468,000.00 471,683.00 468,000.00 468,000.00 300,000.00 4,250.00 22,000.00 25,000.00 51,000.00 80,000.00 110,000.00 185,000.00 195,000.00 275,000.00 19,000.00 17,000.00 15,000.00 22,500.00 140,000.00 160,000.00 190,000.00 25,000.00 10,000.00 5,000.00 800,000.00 850,000.00 900,000.00 950,000.00 1,000,000.00 1,050,000.00 1,100,000.00 1,150,000.00 24,000.00 23,500.00 6,000.00 5,200.00 10,000.00 20,000.00 25,000.00 30,000.00 4,000.00 32,000.00 25,000.00 45,000.00 30,000.00 40,000.00 48,000.00 42,000.00 37,000.00 42,000.00 82,000.00 12,500.00 26,000.00 27,500.00 95,000.00 550,000.00 2,250,000.00 3,200,000.00 1,875,000.00 4,400,000.00 2,720,000.00 2,300,000.00 540,000.00 160,000.00 32,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186
URAIAN
SATUAN
Closed Jongkok Standart / sejenis (mutu B) Closed Jongkok sejenis ( mutu A) Shower Spray TX 403 SV 3 Coneblock biasa tebal 6 cm Coneblock warna tebal 6 cm Coneblock biasa tebal 8 cm Coneblock warna tebal 8 cm Cornice (bubuk Semen putih utk gypsum) Dempul Jadi Dempul Ross Polac Dempul Isamu Dolken Kayu dia. 8 - 10/400 cm Door Closer Door Holder Door Stoper Door Stop Ember hitam Engsel Biasa Engsel Kuningan 4" Engsel Pintu Epoxi Eternit 100 x 100 tebal 2,7 mm Eternit 100 x 100 tebal 3,5 mm Filler Fitting plafond listrik Glass Block Grendel/Slot Tanam 4" Grendel biasa Gypsum Board ( 120 x 240 x 9 ) mm Hordeng Horizontal Blind (aluminium) Hordeng Vertikal Blind Ijuk Jendela Aluminium + Kaca Reyband 5 mm Jendela Aluminium + Kaca Reyband 8 mm Jendela Besi Jendela Bingkai Nako 100 cm X 70 cm Jendela Bingkai Nako Kabel NYA 1,5 mm Kabel NYA 2,5 mm Kabel NYA 4.0 mm Kabel NYM 2 X 1,5 mm Kabel NYM 2 X 2,5 mm Kabel NYM 2 X 4,0 mm Kaca Cermin 3 mm Kaca Cermin 5 mm Kaca Patri Kaca Bening 3 mm Kaca Bening 4 mm Kaca Bening 5 mm Kaca Bening 8 mm Kaca Bening 10 mm Kaca Buram 12 mm Kaca Rayband 5 mm Kaca Buram/Es 5 mm Bingkai Kaca Nako Kaca Naco 6 daun Kaca Naco 8 daun Kaca Naco Rayben 5 mm, 6 daun Kaca Naco Rayben 5 mm, 8 daun Kait angin Jendela Kalsiboard 3,5 mm (120 cm X 240 cm) Kalsiboard 4,5 mm (120 cm X 240 cm) Kapur Karpet tebal 6 mm Kawat Beton Kawat Burung
unit Unit buah buah buah buah buah kg kg kg kg m3 buah buah buah buah buah buah buah buah kg Lbr Lbr m2 buah buah buah buah lbr m2 m3 Kg m2 m2 m2 Unit m2 m' m' m' m' m' m' m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Set Set Set Set Set Buah Kpg Kpg kg m2 kg m2 - 11 -
HARGA Swakelola (Rp) 180,000.00 270,000.00 325,000.00 1,800.00 2,400.00 2,450.00 3,000.00 7,000.00 20,000.00 28,000.00 48,000.00 290,000.00 240,000.00 30,000.00 300,000.00 22,000.00 6,500.00 18,000.00 30,000.00 18,000.00 50,000.00 23,000.00 27,000.00 1,250.00 9,000.00 24,000.00 75,000.00 16,000.00 63,000.00 92,000.00 95,000.00 9,000.00 820,000.00 924,000.00 300,000.00 90,000.00 135,000.00 3,900.00 5,200.00 6,000.00 10,000.00 13,000.00 18,000.00 124,000.00 325,000.00 1,600,000.00 65,000.00 75,000.00 110,000.00 200,000.00 232,000.00 390,000.00 141,000.00 108,000.00 14,000.00 54,000.00 62,000.00 54,000.00 61,000.00 15,000.00 55,000.00 58,000.00 6,500.00 75,000.00 18,000.00 20,000.00
HARGA SATUAN SATUAN Rp.) 225,000.00 337,500.00 406,250.00 2,250.00 3,000.00 3,062.50 3,750.00 8,750.00 25,000.00 35,000.00 52,800.00 319,000.00 264,000.00 33,000.00 330,000.00 24,200.00 7,150.00 19,800.00 33,000.00 19,800.00 55,000.00 25,300.00 29,700.00 1,375.00 9,900.00 26,400.00 82,500.00 17,600.00 69,300.00 101,200.00 104,500.00 9,900.00 902,000.00 1,016,400.00 330,000.00 99,000.00 148,500.00 4,290.00 5,720.00 6,600.00 11,000.00 14,300.00 19,800.00 136,400.00 357,500.00 1,760,000.00 71,500.00 82,500.00 121,000.00 220,000.00 255,200.00 429,000.00 155,100.00 118,800.00 15,400.00 59,400.00 68,200.00 59,400.00 67,100.00 16,500.00 60,500.00 63,800.00 7,150.00 82,500.00 19,800.00 22,000.00
HARGA DASAR (Rp) 180,000.00 270,000.00 325,000.00 1,800.00 2,400.00 2,450.00 3,000.00 7,000.00 20,000.00 28,000.00 48,000.00 290,000.00 240,000.00 30,000.00 300,000.00 22,000.00 6,500.00 18,000.00 30,000.00 18,000.00 50,000.00 23,000.00 27,000.00 1,250.00 9,000.00 24,000.00 75,000.00 16,000.00 63,000.00 92,000.00 95,000.00 9,000.00 820,000.00 924,000.00 300,000.00 90,000.00 135,000.00 3,900.00 5,200.00 6,000.00 10,000.00 13,000.00 18,000.00 124,000.00 325,000.00 1,600,000.00 65,000.00 75,000.00 110,000.00 200,000.00 232,000.00 390,000.00 141,000.00 108,000.00 14,000.00 54,000.00 62,000.00 54,000.00 61,000.00 15,000.00 55,000.00 58,000.00 6,500.00 75,000.00 18,000.00 20,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243
URAIAN
SATUAN
Kawat Duri Kawat Harmonika Kawat Jaring pagar Kawat Kassa Kawat Las Kawat Nyamuk Kawat Seng Polos Kayu Gelam dia. 6-8 Kayu Gelam dia. 10-12 Kayu Hek Kayu Lis 1/3 Kayu Lis 1/4 Kayu Lis Profil kecil Kayu Lis Profil sedang Kayu Lis Profil besar Kayu Mosaik 30 x 30 cm Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Kayu Kelas I (Unglen, Jati) Kayu Kelas II (Petanang dan sejenis) Kayu Kelas III (Meranti dan sejenis) Kayu Papan 3/20 Kls. III Kayu Kelas IV (Racuk dan sejenis) Kayu Papan kelas IV Kayu Racuk Kayu Reng Keramik lantai/dinding 20 x 20/25 cm putih polos Keramik lantai/dinding 20 x 20/25 cm putih polos Keramik lantai 20 x 20 cm warna, mutu C Keramik lantai 20 x 20 cm warna, mutu C Keramik lantai 20 x 20 cm warna, mutu B Keramik lantai 20 x 20 cm warna, mutu B Keramik dinding 20 x 25 cm warna Keramik dinding 20 x 25 cm warna Keramik lantai 20 x 25 cm warna, mutu B Keramik lantai 20 x 25 cm warna, mutu B Keramik lantai 30 x 30 cm warna Keramik lantai 30 x 30 cm warna Keramik lantai 30 x 30 cm putih polos Keramik lantai 30 x 30 cm putih polos Keramik lantai 40 x 40 cm warna mutu C Keramik lantai 40 x 40 cm warna mutu C Keramik lantai 40 x 40 cm warna mutu B Keramik lantai 40 x 40 cm warna mutu B Keramik lantai motif kayu (kasar) mutu A Klem Talang Paralon Klem kabel listrik biasa Klem kabel listrik Korosin Kran Air Kuas 3"-4" Kunci Gembok Kunci Lemari Kunci Pintu Kamar Tidur (Hotel) Kunci Pintu KM/WC (lux) Kunci Selot Kunci Tanam biasa mutu C Kunci Tanam 2 slaag biasa Kunci Tanam 2 slaag mutu B Kunci Tanam Kamar Mandi L.bow listrik Lampu Down Light Lampu Hologen 50 watt Lampu Hologen 150 watt Lampu Hologen Box Lampu TL 10 Watt Lampu TL 20 Watt
m' m2 lbr m2 Dos m2 kg btg btg btg m' m' m' m' m' Buah Btg m3 m3 m3 m3 m3 keping m3 btg Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak buah Kotak Buah Buah Buah Ltr buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah - 12 -
HARGA Swakelola (Rp) 15,000.00 39,000.00 28,000.00 15,000.00 100,000.00 18,000.00 19,000.00 8,000.00 9,000.00 9,000.00 10,500.00 11,500.00 2,500.00 3,500.00 7,500.00 6,750.00 55,000.00 8,250,000.00 6,500,000.00 3,300,000.00 3,300,000.00 1,500,000.00 16,500.00 1,650,000.00 30,000.00 58,080.00 2,320.00 52,000.00 2,080.00 62,000.00 2,480.00 68,000.00 3,400.00 46,600.00 2,330.00 48,000.00 4,320.00 48,000.00 4,320.00 52,000.00 8,320.00 65,000.00 10,400.00 50,000.00 2,750.00 140.00 3,000.00 2,000.00 10,000.00 12,500.00 8,500.00 8,000.00 400,000.00 350,000.00 13,000.00 25,000.00 65,000.00 90,000.00 27,000.00 2,500.00 42,500.00 12,500.00 25,000.00 100,000.00 45,000.00 70,000.00
HARGA SATUAN SATUAN Rp.) 16,500.00 42,900.00 30,800.00 16,500.00 110,000.00 19,800.00 20,900.00 8,800.00 9,900.00 9,900.00 11,550.00 12,650.00 2,750.00 3,850.00 8,250.00 7,425.00 60,500.00 9,075,000.00 7,150,000.00 3,630,000.00 3,630,000.00 1,650,000.00 18,150.00 1,815,000.00 33,000.00 63,888.00 2,552.00 57,200.00 2,288.00 68,200.00 2,728.00 74,800.00 3,740.00 51,260.00 2,563.00 52,800.00 4,752.00 52,800.00 4,752.00 57,200.00 9,152.00 71,500.00 11,440.00 55,000.00 3,025.00 154.00 3,300.00 2,200.00 11,000.00 13,750.00 9,350.00 8,800.00 440,000.00 385,000.00 14,300.00 27,500.00 71,500.00 99,000.00 29,700.00 2,750.00 46,750.00 13,750.00 27,500.00 110,000.00 49,500.00 77,000.00
HARGA DASAR (Rp) 15,000.00 39,000.00 28,000.00 15,000.00 100,000.00 18,000.00 19,000.00 8,000.00 9,000.00 9,000.00 10,500.00 11,500.00 2,500.00 3,500.00 7,500.00 6,750.00 55,000.00 8,250,000.00 6,500,000.00 3,300,000.00 3,300,000.00 1,500,000.00 16,500.00 1,650,000.00 30,000.00 58,080.00 2,320.00 52,000.00 2,080.00 62,000.00 2,480.00 68,000.00 3,400.00 46,600.00 2,330.00 48,000.00 4,320.00 48,000.00 4,320.00 52,000.00 8,320.00 65,000.00 10,400.00 50,000.00 2,750.00 140.00 3,000.00 2,000.00 10,000.00 12,500.00 8,500.00 8,000.00 400,000.00 350,000.00 13,000.00 25,000.00 65,000.00 90,000.00 27,000.00 2,500.00 42,500.00 12,500.00 25,000.00 100,000.00 45,000.00 70,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308
URAIAN
SATUAN
Lampu TL 40 Watt (bambu) Lampu Pijar 25 Watt Putih Lampu Pijar 40 Watt Putih Lantai Granit 30/30 Lantai Granit 40/40 Lantai Granit 60/60 Lantai Kayu Panil Gracewood Las dop listrik Lem Kayu Lem Vinyl List Gypsum Besar List Gypsum Kecil Mangkok Saklar listrik MCB MCB Box isi 4 grup MCB Box isi 8 grup Melamic Clear Melamic Gloss/dop (Finishing) Mill Minyak Bekisting Minyak Cat Minyak solar untuk industri / Minyak aspal Minyak Gardan Minyak Hidrolik Minyak Selinder Mozaik kayu lantai Uk. 30 x 30 cm Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Paku Biasa bermacam ukuran 2" - 5" Paku Biasa 1/2" - 1"
buah buah buah Buah Buah Buah m2 Buah ltr Kg m' m' Buah Buah Buah Buah kg kg kg liter liter liter liter liter liter buah Unit Unit kg kg buah buah kg kg buah Kg buah m2 m3 m3 Bks m2 m2 m2 Unit M' M' M' M' M' M' M' M' Btg M' M' M' M' M' M' M' M' M' M' M'
Paku Sumbat Paku Beton Paku Gypsum Paku Seng,Asbes Paku Asbes Paku Sekrup 3,5" Paku Sekrup 3,5" Parquet Jati Pasir Beton / Pasang Pasir Urug Pewarna nat Pintu Alluminium Pintu Besi Baja Pintu Lipat Pintu PVC lengkap + pemasangan Pipa besi medium 2 mm & 1/2", pjg 6 m Pipa besi medium 2 mm & 3/4", pjg 6 m Pipa besi medium 2 mm & 1", pjg 6 m Pipa besi medium 2 mm & 1,5", pjg 6 m Pipa besi medium 2 mm & 2", pjg 6 m Pipa besi medium 2 mm & 2,5", pjg 6 m Pipa besi medium 2 mm & 3", pjg 6 m Pipa besi medium 2 mm & 4", pjg 6 m Pipa paralon listrik 5/8" Pipa PVC & 1/2" mutu A (Wavin dan sejenis) Pipa PVC biasa & 1/2" mutu B Pipa PVC & 3/4" mutu A (Wavin dan sejenis) Pipa PVC & 3/4" mutu B Pipa PVC & 1" mutu A (Wavin dan sejenis) Pipa PVC & 1" mutu B Pipa PVC & 1.5" mutu A (Wavin dan sejenis) Pipa PVC & 1.5" mutu B Pipa PVC & 2" mutu A ( Wavin dan sejenis) Pipa PVC & 2" mutu B Pipa PVC & 3" mutu A (Wavin dan sejenis)
- 13 -
HARGA
HARGA SATUAN
Swakelola (Rp) 105,000.00 12,000.00 12,000.00 20,500.00 44,000.00 117,000.00 352,500.00 500.00 20,000.00 8,500.00 22,000.00 12,000.00 1,800.00 44,000.00 25,000.00 55,000.00 60,000.00 60,000.00 33,000.00 12,000.00 6,000.00 5,500.00 16,500.00 25,500.00 19,750.00 7,500.00 345,000.00 375,000.00 15,000.00 18,000.00 600.00 700.00 25,000.00 22,000.00 600.00 45,000.00 450.00 385,000.00 92,500.00 65,000.00 10,000.00 640,000.00 1,950,000.00 380,000.00 210,000.00 18,500.00 23,400.00 29,175.00 41,700.00 52,500.00 68,500.00 108,500.00 141,400.00 6,000.00 4,000.00
SATUAN Rp.) 115,500.00 13,200.00 13,200.00 22,550.00 48,400.00 128,700.00 387,750.00 550.00 22,000.00 9,350.00 24,200.00 13,200.00 1,980.00 48,400.00 27,500.00 60,500.00 66,000.00 66,000.00 36,300.00 13,200.00 6,600.00 6,050.00 18,150.00 28,050.00 21,725.00 8,250.00 379,500.00 412,500.00 16,500.00 19,800.00 660.00 770.00 27,500.00 24,200.00 660.00 49,500.00 495.00 423,500.00 101,750.00 71,500.00 11,000.00 704,000.00 2,145,000.00 418,000.00 231,000.00 20,350.00 25,740.00 32,092.50 45,870.00 57,750.00 75,350.00 119,350.00 155,540.00 6,600.00 4,400.00
5,500.00
6,050.00
7,500.00
8,250.00
13,000.00
14,300.00
16,375.00
18,012.50
32,125.00
35,337.50
HARGA DASAR (Rp) 105,000.00 12,000.00 12,000.00 20,500.00 44,000.00 117,000.00 352,500.00 500.00 20,000.00 8,500.00 22,000.00 12,000.00 1,800.00 44,000.00 25,000.00 55,000.00 60,000.00 60,000.00 33,000.00 12,000.00 6,000.00 5,500.00 16,500.00 25,500.00 19,750.00 7,500.00 345,000.00 375,000.00 15,000.00 18,000.00 600.00 700.00 25,000.00 22,000.00 600.00 45,000.00 450.00 385,000.00 92,500.00 65,000.00 10,000.00 640,000.00 1,950,000.00 380,000.00 210,000.00 18,500.00 23,400.00 29,175.00 41,700.00 52,500.00 68,500.00 108,500.00 141,400.00 6,000.00 4,000.00 3,750.00 5,500.00 4,600.00 7,500.00 4,750.00 13,000.00 8,000.00 16,375.00 10,500.00 32,125.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367
URAIAN
SATUAN
Pipa PVC & 3" mutu B Pipa PVC & 4" mutu A ( Wavin dan sejenis) Pipa PVC & 4" mutu B Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) Pipa Stainless 2", tebal 1 mm Pipa Stainless 2", tebal 0.8 mm Pipa Stainless 2,5", tebal 1 mm Pipa Stainless 2,5", tebal 1.2 mm Plamir Tembok Plamir Kayu Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Plint keramik 10 x 30 cm warna Plint keramik 10 x 40 cm warna Plint Ubin PC Abu-abu 15 x 20 cm Plint Ubin PC Abu-abu 10 x 30 cm Plint Ubin PC Abu-abu 10 x 40 cm Plywood warna/Jabarwood Plywood Jati 3 mm Plywood Sungkay 3 mm/ megatick Plywood 3 mm Plywood 4 mm Plywood 6 mm Plywood 9 mm Plywood 12 mm Plywood 20 mm Politur dasar Politur Jadi Porselin Putih Uk. 10 x 10 cm Porselin Warna Uk. 10 x 10 cm Rangka Atap baja ringan untuk atap genteng, genteng keramik, beton, dll + pemasangan Rangka Atap baja ringan untuk atap seng metal, atap asbes, aluminium, sirap, dll + pemasangan Rangka Atap baja ringan bentuk joglo/bertumpuk/ khusus + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Pelana, Metal dan keramik + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Perisai, Metal dan keramik + pemasangan Rangka Atap baja ringan "Pryda" untuk atap Joglo, Metal dan keramik + pemasangan Rel Pintu Dorong Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) Sanding Sealer Impra (Cat dasar) Seal Tape Semen ( 50 kg ) Semen Portland ( PC ) Semen Putih (40 kg) Semen Putih Semen Merah Semen Nat Seng Gelombang, lebar 70 cm Seng Plat 120 cm X 240 cm Seng Plat 33 cm Seng Plat 38 cm Seng Plat 45 cm Seng Plat 55 cm Seng Plat 88 cm Seng Plat 92 cm Sabun Soda Api Soft Board ( 120 x 240 ) mm Saklar Tunggal biasa Saklar Ganda biasa
M' M' M' M' M' M' M' M' kg kg Lbr buah buah buah buah buah Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr Lbr ltr ltr buah buah m2
- 14 -
HARGA
HARGA SATUAN
Swakelola (Rp)
SATUAN Rp.)
52,000.00
57,200.00
123,750.00 75,000.00 67,200.00 95,200.00 84,000.00 8,000.00 17,000.00 1,700,000.00 4,000.00 13,200.00 800.00 850.00 875.00 110,000.00 110,000.00 110,000.00 42,000.00 68,000.00 88,000.00 125,000.00 160,000.00 210,000.00 49,000.00 53,000.00 700.00 1,000.00 285,000.00
m2
216,200.00
m2
281,700.00
m2
255,500.00
m2
281,700.00
136,125.00 82,500.00 73,920.00 104,720.00 92,400.00 8,800.00 18,700.00 1,870,000.00 4,400.00 14,520.00 880.00 935.00 962.50 121,000.00 121,000.00 121,000.00 46,200.00 74,800.00 96,800.00 137,500.00 176,000.00 231,000.00 53,900.00 58,300.00 770.00 1,100.00 313,500.00 237,820.00 309,870.00 281,050.00 309,870.00
m2
327,600.00
360,360.00
Unit m2 m2 Kg buah Zak kg Zak Kg m3 kg m2 lbr M' M' M' M' M' M' Kg Kg lbr Buah Buah
240,000.00 585,000.00 630,000.00 38,000.00 3,500.00 62,000.00 1,250.00 85,000.00 2,000.00 38,000.00 12,000.00 7,425.00 106,000.00 13,200.00 18,500.00 20,000.00 26,000.00 33,000.00 35,000.00 11,200.00 30,000.00 67,500.00 6,000.00 13,500.00
264,000.00 643,500.00 693,000.00 41,800.00 3,850.00 68,200.00 1,375.00 93,500.00 2,200.00 41,800.00 13,200.00 8,167.50 116,600.00 14,520.00 20,350.00 22,000.00 28,600.00 36,300.00 38,500.00 12,320.00 33,000.00 74,250.00 6,600.00 14,850.00
HARGA DASAR (Rp) 17,500.00 52,000.00 30,000.00 123,750.00 75,000.00 67,200.00 95,200.00 84,000.00 8,000.00 17,000.00 1,700,000.00 4,000.00 13,200.00 800.00 850.00 875.00 110,000.00 110,000.00 110,000.00 42,000.00 68,000.00 88,000.00 125,000.00 160,000.00 210,000.00 49,000.00 53,000.00 700.00 1,000.00 285,000.00 216,200.00 281,700.00 255,500.00 281,700.00 327,600.00 240,000.00 585,000.00 630,000.00 38,000.00 3,500.00 62,000.00 1,250.00 85,000.00 2,000.00 38,000.00 12,000.00 7,425.00 106,000.00 13,200.00 18,500.00 20,000.00 26,000.00 33,000.00 35,000.00 11,200.00 30,000.00 67,500.00 6,000.00 13,500.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO 368 369 370 371 372
URAIAN
373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398
Saklar Tunggal National Saklar Ganda National Scafolding tg 1,77 m X 1,77 m Roda Scafolding 4 buah RANGKA ATAP Gigasteel - Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) - Screw / Dynabolt - Valery Gutter Talang Jurai - Strap Bracing Stop Kontak biasa Stop kontak AC Sunscreen Aluminium T.Duss listrik Talang Paralon, pjg 4 m Tali Ijuk Ijuk Tanah Liat/Urug Tanah Puru Tanah Sirtu Taekwood 3 mm Taekwood 4 mm biasa Ter / Residu Textil Tape Thinner biasa Thinner Cat Glossy (Cobra dan sejenis) Urinoir Urinoir mutu A Vernis Vernis Batu Wallpaper Wastafel biasa Wastafel Halmar Wastafel mutu A Wood Filler Impra (dempul) Wood Stain Impra (cat pewarna)
C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
PERALATAN Compresor Concrete Mixer Concrete Pump Concrete Vibrator Dump Truck 3,5 ton Excavator Filter Genset Grader Loader Pneumatic Tired Roller Tandem Roller Flatbed Truck 3,5 ton Water Tank Truck Generator Alat Bantu Roller 3 roda Sprayer, Selfprof Buldozer Scaffolding 177cm X 177 cm, Tg. 177 cm Stone Crusher (Pemecah batu) Pengaduk beton/Molen Stemper Roller, Vibrator Pneu Water Pump
SATUAN
HARGA SATUAN
HARGA
Buah Buah Unit Unit
Swakelola (Rp) 17,400.00 30,000.00 800,000.00 350,000.00
SATUAN Rp.) 19,140.00 33,000.00 880,000.00 385,000.00
M' M' M' Buah M' M' Buah Buah M2 Buah btg Kg m3 m3 m3 m3 m2 m2 liter roll Liter Liter buah unit ltr Kg m2 buah unit unit Klg Klg
22,500.00 18,800.00 16,300.00 1,900.00 125,400.00 12,500.00 17,000.00 75,000.00 375,000.00 1,200.00 48,000.00 11,400.00 24,000.00 50,000.00 55,000.00 80,000.00 36,000.00 40,000.00 45,000.00 6,850.00 12,000.00 35,000.00 1,400,000.00 1,650,000.00 25,000.00 65,000.00 280,000.00 265,000.00 280,000.00 450,000.00 32,000.00 60,000.00
24,750.00 20,680.00 17,930.00 2,090.00 137,940.00 13,750.00 18,700.00 82,500.00 412,500.00 1,320.00 52,800.00 12,540.00 26,400.00 55,000.00 60,500.00 88,000.00 39,600.00 44,000.00 49,500.00 7,535.00 13,200.00 38,500.00 1,540,000.00 1,815,000.00 27,500.00 71,500.00 308,000.00 291,500.00 308,000.00 495,000.00 35,200.00 66,000.00
22,500.00 18,800.00 16,300.00 1,900.00 125,400.00 12,500.00 17,000.00 75,000.00 375,000.00 1,200.00 48,000.00 11,400.00 24,000.00 50,000.00 55,000.00 80,000.00 36,000.00 40,000.00 45,000.00 6,850.00 12,000.00 35,000.00 1,400,000.00 1,650,000.00 25,000.00 65,000.00 280,000.00 265,000.00 280,000.00 450,000.00 32,000.00 60,000.00
112,015.00 178,710.00 114,560.00 40,000.00 312,000.00 865,555.00
123,216.50 196,581.00 126,016.00 44,000.00 343,200.00 952,110.50
112,015.00 178,710.00 114,560.00 40,000.00 312,000.00 865,555.00
350,000.00
385,000.00
350,000.00
225,000.00
247,500.00
225,000.00
75,000.00
82,500.00
75,000.00
140,000.00
154,000.00
140,000.00
95,000.00
104,500.00
95,000.00
100,000.00 150,000.00
110,000.00 165,000.00
100,000.00 150,000.00
250,000.00
275,000.00
250,000.00
jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam jam Set/Bulan jam jam jam jam jam
- 15 -
HARGA
DASAR (Rp) 17,400.00 30,000.00 800,000.00 350,000.00
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I
NO D 1 2 3 4 5 6 7 8
URAIAN
SATUAN
SERVICE AC Window/Split/Multi Dispenser Kulkas/Freezer Kompor Gas 2T Kompor Gas 4T Mesin Cuci Pompa Air Instalasi listrik
Ls Ls Ls Ls Ls Ls Ls Ls
- 16 -
HARGA
HARGA SATUAN
HARGA
Swakelola (Rp)
SATUAN Rp.)
DASAR (Rp)
60,000.00 50,000.00 50,000.00 50,000.00 75,000.00 50,000.00 50,000.00 85,000.00
66,000.00 55,000.00 55,000.00 55,000.00 82,500.00 55,000.00 55,000.00 93,500.00
60,000.00 50,000.00 50,000.00 50,000.00 75,000.00 50,000.00 50,000.00 85,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I
DAFTAR ANALISA PEKERJAAN KOTA PALEMBANG TAHUN ANGGARAN 2017 SEMESTER I NO.
Analisa 1 I
Harga Satuan (Rp) 3
URAIAN 2
PEKERJAAN PERSIAPAN 1.1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter a. Bahan 1.250 Btg Kayu Gelam dia. 6-8 2.500 Kg Semen Portland 0.005 M3 Pasir Beton 0.009 M3 Koral Beton 0.072 M3 Kayu 5/7 kelas IV 0.060 Kg Paku Biasa 2"-5" 0.400 Lt Teer/Residu
b. Tenaga 0.200 0.400 0.020 0.020
Oh Oh Oh Oh
8,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 15,000.00 45,000.00
Tukang Kayu Pekerja Kepala Tukang Mandor
1.2 1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 Meter a. Bahan 1.250 Btg Kayu Gelam dia. 6-8 2.500 Kg Semen Portland 1.200 Lbr Seng Gelombang 3"-5" 0.005 M3 Pasir Beton 0.009 M3 Koral Beton 0.072 M3 Kayu 5/7 kelas IV 0.060 Kg Paku Biasa 2"-5" 0.450 Kg Meni Besi
Oh Oh Oh Oh
144,282.65
8,000.00 1,250.00 7,425.00 92,500.00 421,683.00 1,500,000.00 15,000.00 37,000.00
Tukang Kayu Pekerja Kepala Tukang Mandor
1.3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter a. Bahan 1.000 Btg Kayu Gelam dia. 6-8 2.000 Kg Semen Portland 25.000 Kg Kawat Duri 0.005 M3 Pasir Beton 0.009 M3 Koral Beton 0.060 Kg Paku Biasa 2"-5"
Oh Oh Oh Oh
151,842.65
8,000.00 1,250.00 15,000.00 92,500.00 421,683.00 15,000.00
Tukang Kayu Pekerja Kepala Tukang Mandor
Jumlah 1.4 1 M' Pengukuran dan Pemasangan Bouwplank a. Bahan 0.012 M3 Kayu 5/7 kelas IV 0.020 Kg Paku Biasa 2" - 5" 0.007 M3 Kayu Papan 3/20
b. Tenaga 0.100 0.100 0.010 0.005
Oh Oh Oh Oh
390,657.65
1,500,000.00 15,000.00 3,300,000.00
Tukang Kayu Pekerja Kepala Tukang Mandor
- 17 -
18,000.00 26,000.00 2,200.00 2,200.00 48,400.00
48,400.00
192,682.65
10,000.00 3,125.00 8,910.00 462.50 3,795.15 108,000.00 900.00 16,650.00 151,842.65
18,000.00 26,000.00 2,200.00 2,200.00 48,400.00
18,000.00 26,000.00 2,200.00 2,200.00 48,400.00
48,400.00
200,242.65
8,000.00 2,500.00 375,000.00 462.50 3,795.15 900.00 390,657.65
18,000.00 19,500.00 2,200.00 2,200.00 41,900.00
18,000.00 19,500.00 2,200.00 2,200.00 41,900.00
41,900.00
432,557.65
18,000.00 300.00 23,100.00 41,400.00
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
18,000.00 26,000.00 2,200.00 2,200.00 48,400.00
8,000.00 2,500.00 375,000.00 462.50 3,795.15 900.00 390,657.65
90,000.00 65,000.00 110,000.00 110,000.00
41,400.00
Jumlah Bahan+Tenaga (Rp) 6
10,000.00 3,125.00 462.50 3,795.15 108,000.00 900.00 18,000.00 144,282.65
10,000.00 3,125.00 8,910.00 462.50 3,795.15 108,000.00 900.00 16,650.00 151,842.65
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.200 0.300 0.020 0.020
10,000.00 3,125.00 462.50 3,795.15 108,000.00 900.00 18,000.00 144,282.65
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.200 0.400 0.020 0.020
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
18,000.00 300.00 23,100.00 41,400.00
9,000.00 6,500.00 1,100.00 550.00 17,150.00
9,000.00 6,500.00 1,100.00 550.00 17,150.00
17,150.00
58,550.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 1.5 1 M2 Pembuatan Kantor Sementara, Dengan Lantai Plesteran a. Bahan 1.250 Btg Kayu Gelam dia. 6-8 0.180 M3 Kayu 0.850 Kg Paku Biasa 1.100 Kg Besi Strip 35.000 Kg Semen Portland 0.150 M3 Pasir Pasang 0.100 M3 Pasir Beton 0.150 M3 Koral Beton 30.000 Bh Bata Merah 0.250 Lbr Seng Plat 2.000 Bh Jendela Nako 0.080 M2 Kaca Polos 0.150 Bh Kunci Tanam 0.060 Lbr Plywood 4 mm b. Tenaga 2.000 1.000 2.000 0.300 0.050
Oh Oh Oh Oh Oh
8,000.00 1,500,000.00 15,000.00 10,000.00 1,250.00 92,500.00 92,500.00 421,683.00 1,250.00 106,000.00 90,000.00 65,000.00 25,000.00 68,000.00
Tukang Kayu Tukang Batu Pekerja Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
10,000.00 270,000.00 12,750.00 11,000.00 43,750.00 13,875.00 9,250.00 63,252.45 37,500.00 26,500.00 180,000.00 5,200.00 3,750.00 4,080.00 690,907.45
90,000.00 90,000.00 65,000.00 110,000.00 110,000.00
Jumlah 1.6 1 M Pembuatan Gudang Semen dan Alat - Alat a. Bahan 1.700 Btg Kayu Gelam dia. 6-8 0.210 M3 Kayu 0.300 Kg Paku Biasa 10.500 Kg Semen Portland 0.030 M3 Pasir Beton 0.050 M3 Koral Beton 1.500 Lbr Seng Gelombang BJLS
690,907.45
Jumlah Bahan+Tenaga (Rp) 6
10,000.00 270,000.00 12,750.00 11,000.00 43,750.00 13,875.00 9,250.00 63,252.45 37,500.00 26,500.00 180,000.00 5,200.00 3,750.00 4,080.00 690,907.45 180,000.00 90,000.00 130,000.00 33,000.00 5,500.00 438,500.00
180,000.00 90,000.00 130,000.00 33,000.00 5,500.00 438,500.00
438,500.00
1,129,407.45
2
b. Tenaga 2.000 1.000 0.200 0.050
Oh Oh Oh Oh
8,000.00 1,500,000.00 15,000.00 1,250.00 92,500.00 421,683.00 7,425.00
Tukang Kayu Pekerja Kepala Tukang Mandor
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
1.7 1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu a. Bahan 3.000 Btg Kayu Gelam dia. 6-8 0.276 M3 Kayu 0.700 Kg Paku Biasa 1.000 M2 Seng Gelombang BJLS
b. Tenaga 1.500 1.000 0.150 0.050
Oh Oh Oh Oh
13,600.00 315,000.00 4,500.00 13,125.00 2,775.00 21,084.15 11,137.50 381,221.65
381,221.65
8,000.00 1,500,000.00 15,000.00 7,425.00
Tukang Kayu Pekerja Kepala Tukang Mandor
1.8 1 M2 ihkan Lapangan dan Perataan a. Tenaga 0.100 Oh Pekerja 0.050 Oh Mandor
455,925.00
65,000.00 110,000.00 Jumlah
1.9 1 M2 Pembuatan Bedeng Buruh a. Bahan 1.250 Btg Kayu Gelam dia. 6-8 0.186 M3 Kayu 0.300 Kg Paku Biasa 18.000 Kg Semen Portland 0.030 M3 Pasir Beton 0.050 M3 Koral Beton 1.000 M2 Seng Gelombang BJLS 1.350 Lbr Plywood 4 mm
8,000.00 1,500,000.00 15,000.00 1,250.00 92,500.00 421,683.00 7,425.00 68,000.00
- 18 -
180,000.00 65,000.00 22,000.00 5,500.00 272,500.00 272,500.00
24,000.00 414,000.00 10,500.00 7,425.00 455,925.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
13,600.00 315,000.00 4,500.00 13,125.00 2,775.00 21,084.15 11,137.50 381,221.65
10,000.00 279,000.00 4,500.00 22,500.00 2,775.00 21,084.15 7,425.00 91,800.00 439,084.15
180,000.00 65,000.00 22,000.00 5,500.00 272,500.00 653,721.65
24,000.00 414,000.00 10,500.00 7,425.00 455,925.00
135,000.00 65,000.00 16,500.00 5,500.00 222,000.00 222,000.00
135,000.00 65,000.00 16,500.00 5,500.00 222,000.00 677,925.00
6,500.00 5,500.00 12,000.00 12,000.00
6,500.00 5,500.00 12,000.00 12,000.00
10,000.00 279,000.00 4,500.00 22,500.00 2,775.00 21,084.15 7,425.00 91,800.00 439,084.15
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 2.000 1.000 0.200 0.050
Oh Oh Oh Oh
Tukang Kayu Pekerja Kepala Tukang Mandor
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
1.10 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm a. Bahan 0.036 M3 Kayu Kls. IV 0.080 Kg Paku Biasa 1.000 Btg Kaso 5/7
b. Tenaga 0.300 0.002
439,084.15
1,500,000.00 15,000.00 55,000.00
Oh Tukang Kayu Oh Mandor
1.11 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm a. Bahan 1.000 Btg Bambu & 6 - 8 /600 cm 0.250 Kg Tali Ijuk
Oh Oh Oh Oh
110,200.00
50,000.00 11,400.00
Tukang Kayu Kepala Tukang Pekerja Mandor
1.12 1 M2 Pembuatan Jalan Sementara a. Bahan 0.150 M3 Batu Belah 15/20/Batu Kali 0.090 M3 Batu Pecah 5/7 0.010 M3 Pasir Pasang
b. Tenaga 1.000 0.050
52,850.00
350,000.00 468,000.00 92,500.00
Oh Pekerja Oh Mandor
Jumlah 1.13 1 M3 Bongkaran Beton Bertulang a. Tenaga 6.667 Oh Pekerja 0.333 Oh Mandor
95,545.00
65,000.00 110,000.00
Jumlah 1.14 1 M3 Bongkaran Dinding Tembok Bata Merah /Bata lobang a. Tenaga 6.667 Oh Pekerja 0.033 Oh Mandor
65,000.00 110,000.00 Jumlah
1.15 1 M' Pasang Pagar Kawat Jaring Galvanis Tinggi 1 Meter a. Bahan 0.434 Lbr Pagar Kawat Jaring
b. Tenaga 0.042 0.004 0.042 0.002
Oh Oh Oh Oh
28,000.00
Pekerja Kepala Tukang Tukang Mandor
Jumlah
- 19 -
27,000.00 165.00 27,165.00
27,165.00
137,365.00
50,000.00 2,850.00 52,850.00
1,530.00 220.00 16,250.00 1,430.00 19,430.00
1,530.00 220.00 16,250.00 1,430.00 19,430.00
19,430.00
72,280.00
52,500.00 42,120.00 925.00 95,545.00
65,000.00 5,500.00 70,500.00
65,000.00 5,500.00 70,500.00
70,500.00
166,045.00
433,355.00 36,630.00 469,985.00
433,355.00 36,630.00 469,985.00
469,985.00
469,985.00
433,355.00 3,630.00 436,985.00 436,985.00
433,355.00 3,630.00 436,985.00 436,985.00
12,152.00 12,152.00
65,000.00 110,000.00 90,000.00 110,000.00
12,152.00
180,000.00 65,000.00 22,000.00 5,500.00 272,500.00 711,584.15
27,000.00 165.00 27,165.00
52,500.00 42,120.00 925.00 95,545.00
65,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
54,000.00 1,200.00 55,000.00 110,200.00
50,000.00 2,850.00 52,850.00
90,000.00 110,000.00 65,000.00 110,000.00
Jumlah
180,000.00 65,000.00 22,000.00 5,500.00 272,500.00 272,500.00
54,000.00 1,200.00 55,000.00 110,200.00
90,000.00 110,000.00
Jumlah
b. Tenaga 0.017 0.002 0.250 0.013
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
12,152.00 12,152.00
2,730.00 440.00 3,780.00 220.00 7,170.00
2,730.00 440.00 3,780.00 220.00 7,170.00
7,170.00
19,322.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
1.16 10 M2 Pembersihan Akhir Lapangan a. Tenaga 0.750 Oh Pekerja 0.038 Oh Mandor
1.17 10 M2 Bongkaran Rangka Atap a. Tenaga 0.250 Oh Tukang 0.025 Oh Kepala Tukang 1.000 Oh Pekerja
48,750.00 4,125.00 52,875.00 52,875.00 5,287.50
48,750.00 4,125.00 52,875.00 52,875.00 5,287.50
90,000.00 110,000.00 65,000.00
22,500.00 2,750.00 65,000.00 90,250.00 90,250.00 9,025.00
22,500.00 2,750.00 65,000.00 90,250.00 90,250.00 9,025.00
90,000.00 110,000.00 65,000.00
540,000.00 66,000.00 260,000.00 866,000.00 866,000.00 433,000.00
540,000.00 66,000.00 260,000.00 866,000.00 866,000.00 433,000.00
90,000.00 110,000.00 65,000.00
54,000.00 6,600.00 130,000.00 190,600.00
54,000.00 6,600.00 130,000.00 190,600.00
190,600.00 19,060.00
190,600.00 19,060.00
Jumlah Jumlah
Untuk 1 M2 1.18 1 M3 Bongkaran Kuda-kuda Kayu a. Tenaga 6.000 Oh Tukang 0.600 Oh Kepala Tukang 4.000 Oh Pekerja
Untuk tidak dipakai lagi = 0,5 x
Jumlah Jumlah
1.19 10 M2 Bongkaran Plafond + Rangka a. Tenaga 0.600 Oh Tukang 0.060 Oh Kepala Tukang 2.000 Oh Pekerja
Jumlah Jumlah
Untuk 1 M2 1.20 1 M2 Pasang Cerucup Gelam a. Bahan 16.000 Btg Gelam dia. 6 - 8 cm 16.000 Btg Gelam dia. 10 - 12 cm
8,000.00 9,000.00
Oh Pekerja Oh Mandor
128,000.00 144,000.00
1 M2 Pasang Cerucup Gelam dia. 6-8 cm 1 M2 Pasang Cerucup Gelam dia. 10-12 cm
b. Tenaga 0.320 0.019
8,000.00
Oh Pekerja Oh Mandor
112,000.00
1.22 1 M2 Pasang Kisdam a. Bahan 1.250 Kpg Papan Kayu kls IV 0.100 Kg Paku biasa 2"- 5" 2.000 Btg Gelam dia. 10 - 12 cm
16,500.00 15,000.00 8,000.00
Oh Pekerja Oh Mandor
38,125.00
1.23 1 Unit Papan Nama biasa a. Bahan 1.000 Kpg Papan Kayu kls IV 0.050 Kg Paku biasa 1/2"- 1" 1.000 Lbr Plywood 4 mm 0.800 Kg Cat Minyak Mutu C
16,500.00 18,000.00 68,000.00 40,000.00
- 20 -
20,800.00 2,090.00 22,890.00
20,800.00 2,090.00 22,890.00
22,890.00 22,890.00
150,890.00 166,890.00
112,000.00 112,000.00 20,800.00 2,090.00 22,890.00 22,890.00
20,625.00 1,500.00 16,000.00 38,125.00
65,000.00 110,000.00
1 M2 Pasang Kisdam Gelam dia. 6-8 cm
128,000.00 144,000.00 128,000.00 144,000.00
112,000.00 112,000.00
65,000.00 110,000.00
1 M' Pasang Turap Gelam dia. 6-8 cm
b. Tenaga 0.320 0.019
128,000.00 144,000.00 128,000.00 144,000.00
65,000.00 110,000.00
1.21 1 M' Pasang Turap Gelam a. Bahan 14.000 Btg Gelam dia. 6 - 8 cm
Jumlah Bahan+Tenaga (Rp) 6
65,000.00 110,000.00 Jumlah Jumlah
Untuk 1 M2
b. Tenaga 0.320 0.019
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
16,500.00 900.00 68,000.00 32,000.00 117,400.00
20,800.00 2,090.00 22,890.00 134,890.00
20,625.00 1,500.00 16,000.00 38,125.00 20,800.00 2,090.00 22,890.00 22,890.00
20,800.00 2,090.00 22,890.00 61,015.00
16,500.00 900.00 68,000.00 32,000.00 117,400.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.320 1.000
Oh Pekerja Oh Mandor
65,000.00 110,000.00
1 Unit Papan Nama Biasa
117,400.00
1.24 1 Unit Sewa Scafolding a. Bahan 1.000 bln Scafolding tg. 1,77 m X 1,77 m
95,000.00
b. Upah Bongkar pasang 1.000 Oh Mandor
Jumlah Bahan+Tenaga (Rp) 6
20,800.00 110,000.00 130,800.00
20,800.00 110,000.00 130,800.00
130,800.00
248,200.00
95,000.00 95,000.00
110,000.00
95,000.00 95,000.00 110,000.00 110,000.00 110,000.00
110,000.00 110,000.00 205,000.00
26,000.00 4,400.00 30,400.00
26,000.00 4,400.00 30,400.00
30,400.00
30,400.00
65,000.00 110,000.00
34,190.00 5,720.00 39,910.00 39,910.00
34,190.00 5,720.00 39,910.00 39,910.00
65,000.00 110,000.00
47,775.00 8,030.00 55,805.00 55,805.00
47,775.00 8,030.00 55,805.00 55,805.00
65,000.00 110,000.00
40,625.00 6,820.00 47,445.00
40,625.00 6,820.00 47,445.00
47,445.00
47,445.00
65,000.00 110,000.00
81,250.00 13,750.00 95,000.00 95,000.00
81,250.00 13,750.00 95,000.00 95,000.00
65,000.00 110,000.00
53,495.00 9,130.00 62,625.00 62,625.00
53,495.00 9,130.00 62,625.00 62,625.00
65,000.00 110,000.00
3,250.00 550.00 3,800.00
3,250.00 550.00 3,800.00
3,800.00
3,800.00
1 Unit Sewa Scafolding per bulan
II
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
95,000.00
PEKERJAAN TANAH 2.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter a. Tenaga 0.400 Oh Pekerja - Tukang Gali - Kepala Tukang 0.040 Oh Mandor
65,000.00 110,000.00
Jumlah 2.2 1 M3 Galian Tanah Biasa Sedalam 2 Meter a. Tenaga 0.526 Oh Pekerja - Tukang Gali - Kepala Tukang 0.052 Oh Mandor Jumlah 2.3 1 M Galian Tanah Biasa Sedalam 3 Meter a. Tenaga 0.735 Oh Pekerja - Tukang Gali - Kepala Tukang 0.073 Oh Mandor 3
Jumlah 2.4 1 M3 Galian Tanah Keras Sedalam 1 Meter a. Tenaga 0.625 Oh Pekerja - Tukang Gali - Kepala Tukang 0.062 Oh Mandor
Jumlah 2.5 1 M3 Galian Tanah Cadas Sedalam 1 Meter a. Tenaga 1.250 Oh Pekerja - Tukang Gali - Kepala Tukang 0.125 Oh Mandor Jumlah 2.6 1 M3 Galian Tanah Lumpur Sedalam 1 Meter a. Tenaga 0.823 Oh Pekerja - Tukang Gali - Kepala Tukang 0.083 Oh Mandor Jumlah 2.7 1 M2 Pekerjaan Stripping Setinggi 1 Meter a. Tenaga 0.050 Oh Pekerja - Tukang Gali - Kepala Tukang 0.005 Oh Mandor
Jumlah
- 21 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 2.8 1 M3 Pembuangan Tanah Sejauh 150 meter a. Tenaga 0.516 Oh Pekerja - Tukang Gali - Kepala Tukang 0.050 Oh Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
65,000.00 110,000.00
33,540.00 5,500.00 39,040.00 39,040.00
33,540.00 5,500.00 39,040.00 39,040.00
65,000.00 110,000.00
12,480.00 2,090.00 14,570.00 14,570.00
12,480.00 2,090.00 14,570.00 14,570.00
65,000.00 110,000.00
32,500.00 5,500.00 38,000.00 38,000.00
32,500.00 5,500.00 38,000.00 38,000.00
Jumlah 2.9 1 M3 Urugan Kembali a. Tenaga 0.192 Oh Pekerja - Tukang Gali - Kepala Tukang 0.019 Oh Mandor Jumlah 2.10 1 M Pemadatan Tanah a. Tenaga 0.500 Oh Pekerja - Tukang Gali - Kepala Tukang 0.050 Oh Mandor
Jumlah Bahan+Tenaga (Rp) 6
3
Jumlah 2.11 1 M Urugan Pasir a. Bahan 1.200 M3 Pasir Urug 3
b. Tenaga 0.300 0.010
Oh Oh
65,000.00
Pekerja Tukang Gali Kepala Tukang Mandor
65,000.00 110,000.00
Jumlah 2.12 1 M3 Urugan Sirtu a. Bahan 1.200 M3 Sirtu b. Tenaga 0.250 0.025
Oh Oh Oh Oh
78,000.00
80,000.00
Pekerja Tukang Gali Kepala Tukang Mandor
2.13 1 M3 Urugan Koral a. Bahan 1.200 M3 Koral
96,000.00
421,683.00
M3 Upah dan Pemadatan
2.14 1 M3 Urugan Tanah a. Bahan 1.200 M3 Tanah Urug b. Tenaga 0.300 0.033
506,019.60
55,000.00
Pekerja Mandor
III
PEKERJAAN PONDASI 3.1 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 1 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 392.000 Kg Semen Portland 0.314 M3 Pasir Pasang
66,000.00
350,000.00 1,250.00 92,500.00
- 22 -
19,500.00 1,100.00 20,600.00
20,600.00
98,600.00
96,000.00 96,000.00 16,250.00 2,750.00 19,000.00 19,000.00
385,000.00 490,000.00 29,045.00 904,045.00
16,250.00 2,750.00 19,000.00 115,000.00
506,019.60 506,019.60
6,600.00 6,600.00 6,600.00
66,000.00 66,000.00
65,000.00 110,000.00 Jumlah
19,500.00 1,100.00 20,600.00
506,019.60 506,019.60
6,600.00 Jumlah
78,000.00 78,000.00
96,000.00 96,000.00
65,000.00 110,000.00 Jumlah
b. Tenaga 1.000
78,000.00 78,000.00
6,600.00 6,600.00 512,619.60
66,000.00 66,000.00 19,500.00 3,630.00 23,130.00 23,130.00
19,500.00 3,630.00 23,130.00 89,130.00
385,000.00 490,000.00 29,045.00 904,045.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 1.500 0.600 0.060 0.075
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
3.2 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 267.000 Kg Semen Portland 0.427 M3 Pasir Pasang
b. Tenaga 1.500 0.600 0.060 0.075
Oh Oh Oh Oh
904,045.00
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
3.3 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2,5 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 392.000 Kg Semen Portland 0.314 M3 Pasir Pasang
Oh Oh Oh Oh
758,247.50
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
3.4 1 M Pasang Pondasi Batu Kali, 1 Pc : 3 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 202.000 Kg Semen Portland 0.485 M3 Pasir Pasang
904,045.00
Jumlah Bahan+Tenaga (Rp) 6
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 1,070,395.00
385,000.00 333,750.00 39,497.50 758,247.50
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
385,000.00 490,000.00 29,045.00 904,045.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
385,000.00 333,750.00 39,497.50 758,247.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.500 0.600 0.060 0.075
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 924,597.50
385,000.00 490,000.00 29,045.00 904,045.00 97,500.00 54,000.00 6,600.00 8,250.00 166,350.00
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00
166,350.00
1,070,395.00
3
b. Tenaga 1.500 0.600 0.060 0.075
Oh Oh Oh Oh
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 3.5 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 163.000 Kg Semen Portland 0.520 M3 Pasir Pasang b. Tenaga 1.500 0.600 0.060 0.075
Oh Oh Oh Oh
682,362.50
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
Oh Oh Oh Oh
636,850.00
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
- 23 -
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00
166,350.00
848,712.50
385,000.00 203,750.00 48,100.00 636,850.00 97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
385,000.00 170,000.00 50,320.00 605,320.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
385,000.00 252,500.00 44,862.50 682,362.50
385,000.00 203,750.00 48,100.00 636,850.00
65,000.00 90,000.00 110,000.00 110,000.00
3.6 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 136.000 Kg Semen Portland 0.544 M3 Pasir Pasang b. Tenaga 1.500 0.600 0.060 0.075
385,000.00 252,500.00 44,862.50 682,362.50
605,320.00
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 803,200.00
385,000.00 170,000.00 50,320.00 605,320.00 97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 771,670.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 3.7 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 117.000 Kg Semen Portland 0.561 M3 Pasir Pasang
b. Tenaga 1.500 0.600 0.060 0.075
Oh Oh Oh Oh
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
Oh Oh Oh Oh
385,000.00 146,250.00 51,892.50 583,142.50
65,000.00 90,000.00 110,000.00 110,000.00
3.8 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps a. Bahan 1.100 M3 Batu Belah 15/20 cm / batu kali 91.000 Kg Semen Portland 0.561 M3 Pasir Pasang
b. Tenaga 1.500 0.600 0.060 0.075
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
583,142.50
350,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
3.9 1 M Pasang Pondasi Sumuran & 100 cm a. Bahan 0.450 M3 Batu Belah 15/20 cm / batu kali 280.000 Kg Semen Portland 0.450 M3 Pasir Beton 0.670 M3 Koral Beton
385,000.00 146,250.00 51,892.50 583,142.50
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
385,000.00 113,750.00 51,892.50 550,642.50
65,000.00 90,000.00 110,000.00 110,000.00 550,642.50
Jumlah Bahan+Tenaga (Rp) 6
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 749,492.50
385,000.00 113,750.00 51,892.50 550,642.50
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 166,350.00
97,500.00 54,000.00 6,600.00 8,250.00 166,350.00 716,992.50
3
b. Tenaga 2.380 0.300 0.030 0.080
Oh Oh Oh Oh
350,000.00 1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
3.10 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Bertulang a. Bahan 0.019 M3 Pasir Urug 0.094 M3 Pasir Beton 0.150 M3 Koral Beton 60.500 Kg Semen Portland 45.000 Kg Besi Beton 0.900 Kg Kawat Beton 0.032 M3 Kayu Kaso 5/7 0.120 Kg Paku 0.090 Ltr Minyak Bekisting 0.240 Kg Plamir Tembok b. Tenaga 1.000 0.670 0.067 0.050
Oh Oh Oh Oh
157,500.00 350,000.00 41,625.00 282,527.61 831,652.61
831,652.61
65,000.00 92,500.00 421,683.00 1,250.00 19,000.00 18,000.00 1,500,000.00 15,000.00 12,000.00 8,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
157,500.00 350,000.00 41,625.00 282,527.61 831,652.61 154,700.00 27,000.00 3,300.00 8,800.00 193,800.00 193,800.00
1,235.00 8,695.00 63,252.45 75,625.00 855,000.00 16,200.00 48,000.00 1,800.00 1,080.00 1,920.00 1,072,807.45
65,000.00 90,000.00 110,000.00 110,000.00
154,700.00 27,000.00 3,300.00 8,800.00 193,800.00 1,025,452.61
1,235.00 8,695.00 63,252.45 75,625.00 855,000.00 16,200.00 48,000.00 1,800.00 1,080.00 1,920.00 1,072,807.45 65,000.00 60,300.00 7,370.00 5,500.00 138,170.00
65,000.00 60,300.00 7,370.00 5,500.00 138,170.00
138,170.00
1,210,977.45
21.228 Jumlah 3.11 1 M Pembuatan Tiang Pancang (25x25) cm/ Dia 30, Beton Bertulang a. Bahan 0.011 M3 Pasir Urug Darat 0.037 M3 Pasir Beton 0.085 M3 Koral Beton 21.250 Kg Semen Portland 11.500 Kg Besi Beton 0.375 Kg Kawat Beton 0.017 M3 Kayu Kaso 5/7 0.042 Kg Paku 0.040 Ltr Minyak Bekisting 0.105 Kg Plamir Tembok
- 24 -
1,072,807.45
65,000.00 92,500.00 421,683.00 1,250.00 19,000.00 18,000.00 1,500,000.00 15,000.00 12,000.00 8,000.00
715.00 3,422.50 35,843.06 26,562.50 218,500.00 6,750.00 25,500.00 622.50 480.00 840.00 319,235.56
715.00 3,422.50 35,843.06 26,562.50 218,500.00 6,750.00 25,500.00 622.50 480.00 840.00 319,235.56
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
Jumlah Bahan+Tenaga (Rp) 6
b. Tenaga
0.445 0.298 0.028 0.021
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
3.12 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 4 a. Bahan 782.000 Bh Batu Bata Lobang 2.024 Zak Semen Portland 0.406 M3 Pasir Pasang b. Tenaga 0.600 0.060 1.500 0.075
Oh Oh Oh Oh
319,235.56
725.00 62,000.00 92,500.00
Tukang Batu Kepala Tukang Pekerja Mandor
3.13 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 2 a. Bahan 782.000 Bh Batu Bata Lobang 3.296 Zak Semen Portland 0.333 M3 Pasir Pasang b. Tenaga 0.600 0.060 1.500 0.075
Oh Oh Oh Oh
729,993.00
725.00 62,000.00 92,500.00
Tukang Batu Kepala Tukang Pekerja Mandor
PEKERJAAN DINDING 4.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 64.030 Kg Semen Portland 0.059 M3 Pasir Pasang
b. Tenaga 0.650 0.200 0.020 0.030
Oh Oh Oh Oh
802,104.50
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah 4.2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 43.500 Kg Semen Portland 0.080 M3 Pasir Pasang
b. Tenaga 0.650 0.200 0.020 0.030
Oh Oh Oh Oh
260,495.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 32.950 Kg Semen Portland 0.091 M3 Pasir Pasang b. Tenaga 0.650 0.200 0.020 0.030
Oh Oh Oh Oh
236,775.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
- 25 -
54,000.00 6,600.00 97,500.00 8,250.00 166,350.00 166,350.00
224,605.00
54,000.00 6,600.00 97,500.00 8,250.00 166,350.00 968,454.50
175,000.00 80,037.50 5,457.50 260,495.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
65,750.00
326,245.00
175,000.00 54,375.00 7,400.00 236,775.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 65,750.00
175,000.00 41,187.50 8,417.50 224,605.00
65,000.00 90,000.00 110,000.00 110,000.00
54,000.00 6,600.00 97,500.00 8,250.00 166,350.00 896,343.00
566,950.00 204,352.00 30,802.50 802,104.50
175,000.00 54,375.00 7,400.00 236,775.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
54,000.00 6,600.00 97,500.00 8,250.00 166,350.00 166,350.00
175,000.00 80,037.50 5,457.50 260,495.00
65,000.00 90,000.00 110,000.00 110,000.00
28,925.00 26,775.00 3,025.00 2,310.00 61,035.00 380,270.56
566,950.00 125,488.00 37,555.00 729,993.00
566,950.00 204,352.00 30,802.50 802,104.50
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
IV
566,950.00 125,488.00 37,555.00 729,993.00
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
28,925.00 26,775.00 3,025.00 2,310.00 61,035.00 61,035.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 302,525.00
175,000.00 41,187.50 8,417.50 224,605.00 42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 65,750.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 290,355.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 4.4 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 26.550 Kg Semen Portland 0.093 M3 Pasir Pasang b. Tenaga 0.650 0.200 0.020 0.030
Oh Oh Oh Oh
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.5 1 M2 Pasangan Bata Lobang Tebal 1 Bata, 1 Pc : 4 Ps a. Bahan 117.000 Bh Bata Lobang 9 x 9 x 19 cm 26.550 Kg Semen Portland 0.093 M3 Pasir Pasang
Oh Oh Oh Oh
216,790.00
725.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.6 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 22.200 Kg Semen Portland 0.102 M3 Pasir Pasang
Oh Oh Oh Oh
126,615.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
4.7 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6 Ps a. Bahan 140.000 Bh Bata Merah 5 x 11 x 22 cm 22.200 Kg Semen Portland 0.102 M3 Pasir Pasang b. Tenaga 0.650 0.200 0.020 0.030
Oh Oh Oh Oh
212,185.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.8 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 27.800 Kg Semen Portland 0.028 M3 Pasir Pasang b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
212,185.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.9 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 18.950 Kg Semen Portland 0.038 M3 Pasir Pasang
124,840.00
1,250.00 1,250.00 92,500.00
- 26 -
65,750.00
282,540.00
84,825.00 33,187.50 8,602.50 126,615.00 42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
65,750.00
192,365.00
175,000.00 27,750.00 9,435.00 212,185.00 42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 65,750.00
87,500.00 23,687.50 3,515.00 114,702.50
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 277,935.00
175,000.00 27,750.00 9,435.00 212,185.00 42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 65,750.00
87,500.00 34,750.00 2,590.00 124,840.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
175,000.00 27,750.00 9,435.00 212,185.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00
175,000.00 27,750.00 9,435.00 212,185.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
175,000.00 33,187.50 8,602.50 216,790.00
84,825.00 33,187.50 8,602.50 126,615.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.650 0.200 0.020 0.030
175,000.00 33,187.50 8,602.50 216,790.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.650 0.200 0.020 0.030
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
42,250.00 18,000.00 2,200.00 3,300.00 65,750.00 277,935.00
87,500.00 34,750.00 2,590.00 124,840.00 20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 157,390.00
87,500.00 23,687.50 3,515.00 114,702.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
4.10 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 2 Ps a. Bahan 58.500 Bh Bata Lobang 9 x 9 x 19 cm 18.950 Kg Semen Portland 0.038 M3 Pasir Pasang
b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
114,702.50
725.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.11 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 14.370 Kg Semen Portland 0.040 M3 Pasir Pasang
Oh Oh Oh Oh
69,615.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.12 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 11.500 Kg Semen Portland 0.043 M3 Pasir Pasang b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
109,162.50
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
4.13 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps a. Bahan 58.500 Bh Bata Lobang 9 x 9 x 19 cm 11.500 Kg Semen Portland 0.043 M3 Pasir Pasang b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
105,852.50
725.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.14 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 9.680 Kg Semen Portland 0.045 M3 Pasir Pasang b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
60,765.00
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
- 27 -
103,762.50
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 102,165.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
32,550.00
141,712.50
87,500.00 14,375.00 3,977.50 105,852.50 20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 138,402.50
42,412.50 14,375.00 3,977.50 60,765.00 20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
32,550.00
93,315.00
87,500.00 12,100.00 4,162.50 103,762.50
65,000.00 90,000.00 110,000.00 110,000.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 147,252.50
87,500.00 17,962.50 3,700.00 109,162.50
42,412.50 14,375.00 3,977.50 60,765.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 32,550.00
87,500.00 14,375.00 3,977.50 105,852.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
42,412.50 23,687.50 3,515.00 69,615.00
87,500.00 17,962.50 3,700.00 109,162.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 32,550.00
42,412.50 23,687.50 3,515.00 69,615.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.320 0.100 0.010 0.015
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
87,500.00 12,100.00 4,162.50 103,762.50 20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00 136,312.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
4.15 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 8.320 Kg Semen Portland 0.049 M3 Pasir Pasang b. Tenaga 0.320 0.100 0.010 0.015
Oh Oh Oh Oh
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.16 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps a. Bahan 70.000 Bh Bata Merah 5 x 11 x 22 cm 6.500 Kg Semen Portland 0.050 M3 Pasir Pasang
Oh Oh Oh Oh
102,432.50
1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
4.17 1 M2 Pasang Dinding Roster / Terawang ( 12 x 11 x 24 ) cm a. Bahan 36.000 Bh Roster / Terawang 12.800 Kg Semen Portland 0.035 M3 Pasir Pasang
Oh Oh Oh Oh
100,250.00
4,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah 4.18 1 M Pasangan Bataco a. Bahan 12.500 Bh Bataco 10 X 20 X 40 0.019 Zak Semen Portland (PC) 0.023 M3 Pasir Pasang
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
32,550.00
134,982.50
87,500.00 8,125.00 4,625.00 100,250.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
20,800.00 9,000.00 1,100.00 1,650.00 32,550.00
32,550.00
132,800.00
153,000.00 16,000.00 3,237.50 172,237.50
65,000.00 90,000.00 110,000.00 110,000.00
172,237.50
Jumlah Bahan+Tenaga (Rp) 6
87,500.00 10,400.00 4,532.50 102,432.50
87,500.00 8,125.00 4,625.00 100,250.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.300 0.100 0.010 0.015
87,500.00 10,400.00 4,532.50 102,432.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.320 0.100 0.010 0.015
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
153,000.00 16,000.00 3,237.50 172,237.50
19,500.00 9,000.00 1,100.00 1,650.00 31,250.00
19,500.00 9,000.00 1,100.00 1,650.00 31,250.00
31,250.00
203,487.50
2
b. Tenaga 0.150 0.015 0.450
2,600.00 62,000.00 92,500.00
Oh Tukang Batu Oh Kepala Tukang Oh Pekerja
90,000.00 110,000.00 65,000.00 Jumlah
V
PEKERJAAN PLESTERAN 5.1 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm a. Bahan 12.920 Kg Semen Portland 0.013 M3 Pasir Pasang b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
32,500.00 1,202.80 2,081.25 35,784.05
35,784.05
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.2 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm a. Bahan 8.520 Kg Semen Portland 0.017 M3 Pasir Pasang
17,352.50
1,250.00 92,500.00
- 28 -
13,500.00 1,650.00 29,250.00 44,400.00 44,400.00
16,150.00 1,202.50 17,352.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
32,500.00 1,202.80 2,081.25 35,784.05
10,650.00 1,572.50 12,222.50
13,500.00 1,650.00 29,250.00 44,400.00 80,184.05
16,150.00 1,202.50 17,352.50 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 46,602.50
10,650.00 1,572.50 12,222.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 5.3 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm a. Bahan 6.480 Kg Semen Portland 0.019 M3 Pasir Pasang b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
12,222.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.4 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm a. Bahan 5.200 Kg Semen Portland 0.020 M3 Pasir Pasang
Oh Oh Oh Oh
9,857.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
5.5 1 M Plesteran 1 Pc : 5 Ps, Tebal 15 mm a. Bahan 4.320 Kg Semen Portland 0.022 M3 Pasir Pasang
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00
29,250.00
41,472.50
8,100.00 1,757.50 9,857.50 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
6,500.00 1,850.00 8,350.00
65,000.00 90,000.00 110,000.00 110,000.00 8,350.00
Jumlah Bahan+Tenaga (Rp) 6
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00
8,100.00 1,757.50 9,857.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.150 0.015 0.010
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 39,107.50
6,500.00 1,850.00 8,350.00 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 37,600.00
2
b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5,400.00 2,035.00 7,435.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.6 1 M Plesteran 1 Pc : 6 Ps, Tebal 15 mm a. Bahan 3.680 Kg Semen Portland 0.023 M3 Pasir Pasang
7,435.00
5,400.00 2,035.00 7,435.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 36,685.00
2
b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.7 1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm a. Bahan 2.880 Kg Semen Portland 0.024 M3 Pasir Pasang b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
4,600.00 2,127.50 6,727.50
6,727.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.8 1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm a. Bahan 5.760 Kg Semen Portland 0.013 M3 Pasir Pasang
5,820.00
1,250.00 92,500.00
- 29 -
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
3,600.00 2,220.00 5,820.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
4,600.00 2,127.50 6,727.50
7,200.00 1,202.50 8,402.50
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 35,977.50
3,600.00 2,220.00 5,820.00 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 35,070.00
7,200.00 1,202.50 8,402.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.9 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm a. Bahan 1.840 Kg Semen Portland 0.014 M3 Pasir Pasang b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
8,402.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.10 1 M2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, Tebal 15 mm a. Bahan 3.000 Kg Semen Portland 0.019 M3 Pasir Pasang
Oh Oh Oh Oh
3,595.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.11 1 M Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm a. Bahan 0.009 M3 Semen Merah 0.009 M3 Pasir Pasang
5,507.50
Jumlah Bahan+Tenaga (Rp) 6
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 37,652.50
2,300.00 1,295.00 3,595.00 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
3,750.00 1,757.50 5,507.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
2,300.00 1,295.00 3,595.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.150 0.015 0.010
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 32,845.00
3,750.00 1,757.50 5,507.50 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 34,757.50
2
b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
38,000.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.12 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm a. Bahan 0.007 M3 Semen Merah 0.015 M3 Pasir Pasang b. Tenaga 0.200 0.150 0.015 0.010
Oh Oh Oh Oh
1,174.50
38,000.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.13 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm a. Bahan 14.280 Kg Semen Portland 0.023 M3 Pasir Pasang
Oh Oh Oh Oh
1,653.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.14 1 M Plesteran 1 Pc : 3 Ps, Tebal 20 mm a. Bahan 10.800 Kg Semen Portland 0.026 M3 Pasir Pasang
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
19,977.50
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 30,424.50
266.00 1,387.50 1,653.50 13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 29,250.00
17,850.00 2,127.50 19,977.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
342.00 832.50 1,174.50
266.00 1,387.50 1,653.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.250 0.200 0.020 0.013
342.00 832.50 1,174.50
13,000.00 13,500.00 1,650.00 1,100.00 29,250.00 30,903.50
17,850.00 2,127.50 19,977.50 16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 37,825.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 57,802.50
2
1,250.00 92,500.00
- 30 -
13,500.00 2,405.00 15,905.00
13,500.00 2,405.00 15,905.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.250 0.200 0.020 0.013
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.15 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm a. Bahan 8.680 Kg Semen Portland 0.028 M3 Pasir Pasang
b. Tenaga 0.250 0.200 0.020 0.013
Oh Oh Oh Oh
15,905.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.16 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm a. Bahan 7.290 Kg Semen Portland 0.028 M3 Pasir Pasang
Oh Oh Oh Oh
13,440.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.17 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm a. Bahan 6.240 Kg Semen Portland 0.030 M3 Pasir Pasang b. Tenaga 0.250 0.200 0.020 0.013
Oh Oh Oh Oh
11,702.50
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
5.18 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm a. Bahan 0.009 M3 Semen Merah 0.018 M3 Pasir Pasang
b. Tenaga 0.250 0.200 0.020 0.013
Oh Oh Oh Oh
10,575.00
38,000.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
b. Tenaga 0.150 0.070 0.007 0.008
Oh Oh Oh Oh
2,007.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
5.20 1 M Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm a. Bahan 9.300 Kg Semen Portland 0.018 M3 Pasir Pasang
9,215.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 51,265.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00
37,825.00
49,527.50
7,800.00 2,775.00 10,575.00 16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 37,825.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 48,400.00
342.00 1,665.00 2,007.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 37,825.00
7,087.50 2,127.50 9,215.00
65,000.00 90,000.00 110,000.00 110,000.00
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 53,730.00
9,112.50 2,590.00 11,702.50
342.00 1,665.00 2,007.00
65,000.00 90,000.00 110,000.00 110,000.00
5.19 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm a. Bahan 5.670 Kg Semen Portland 0.023 M3 Pasir Pasang
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 37,825.00
7,800.00 2,775.00 10,575.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
10,850.00 2,590.00 13,440.00
9,112.50 2,590.00 11,702.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 37,825.00
10,850.00 2,590.00 13,440.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.250 0.200 0.020 0.013
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
16,250.00 18,000.00 2,200.00 1,375.00 37,825.00 39,832.00
7,087.50 2,127.50 9,215.00 9,750.00 6,300.00 770.00 880.00 17,700.00 17,700.00
9,750.00 6,300.00 770.00 880.00 17,700.00 26,915.00
2
1,250.00 92,500.00
- 31 -
11,625.00 1,665.00 13,290.00
11,625.00 1,665.00 13,290.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.260 0.200 0.020 0.013
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.21 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm a. Bahan 7.070 Kg Semen Portland 0.021 M3 Pasir Pasang b. Tenaga 0.260 0.200 0.020 0.013
Oh Oh Oh Oh
13,290.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.22 1 M2 Plesteran Ciprat 1 Pc : 2 Ps a. Bahan 4.320 Kg Semen Portland 0.016 M3 Pasir Pasang
Oh Oh Oh Oh
10,780.00
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5.23 1 M Plesteran Siar Adukan 1 Pc : 2 Ps a. Bahan 4.320 Kg Semen Portland 0.016 M3 Pasir Pasang
6,880.00
Jumlah Bahan+Tenaga (Rp) 6
16,900.00 18,000.00 2,200.00 1,430.00 38,530.00 51,820.00
8,837.50 1,942.50 10,780.00 16,900.00 18,000.00 2,200.00 1,430.00 38,530.00 38,530.00
5,400.00 1,480.00 6,880.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
16,900.00 18,000.00 2,200.00 1,430.00 38,530.00 38,530.00
8,837.50 1,942.50 10,780.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.250 0.100 0.010 0.015
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
16,900.00 18,000.00 2,200.00 1,430.00 38,530.00 49,310.00
5,400.00 1,480.00 6,880.00 16,250.00 9,000.00 1,100.00 1,650.00 28,000.00 28,000.00
16,250.00 9,000.00 1,100.00 1,650.00 28,000.00 34,880.00
2
b. Tenaga 0.150 0.070 0.007 0.008
Oh Oh Oh Oh
1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
5,400.00 1,480.00 6,880.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
5.24 1 M3 Perekat a. Bahan 10.588 Zak Semen Portland 1.080 M3 Pasir Pasang
6,880.00
9,750.00 6,300.00 770.00 880.00 17,700.00 17,700.00
9,750.00 6,300.00 770.00 880.00 17,700.00 24,580.00
62,000.00 92,500.00
656,456.00 99,900.00 756,356.00 756,356.00
656,456.00 99,900.00 756,356.00 756,356.00
62,000.00 92,500.00
3,720.00 2,220.00 5,940.00
3,720.00 2,220.00 5,940.00
Jumlah 5.25 1 M Plesteran dibentuk Profil uk. 10 x 10 cm a. Bahan 0.060 Kg Semen Portland 0.024 M3 Pasir Pasang
5,400.00 1,480.00 6,880.00
'
b. Tenaga 1.200 0.120 0.600 0.030
Oh Oh Oh Oh
Tukang Batu Kepala Tukang Pekerja Mandor
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
VI
5,940.00
108,000.00 13,200.00 39,000.00 3,300.00 163,500.00 163,500.00
108,000.00 13,200.00 39,000.00 3,300.00 163,500.00 169,440.00
PEKERJAAN KAYU 6.1 1 M3 Pasang Kusen Pintu dan Jendela K.kls. I (Kayu Jati, Unglen) a. Bahan 1.100 M3 Kayu Jati, Balok ( Kayu kelas I) b. Tenaga 6.000 20.000 2.000 0.300
Oh Oh Oh Oh
8,250,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9,075,000.00 9,075,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
- 32 -
9,075,000.00
9,075,000.00 9,075,000.00 390,000.00 1,800,000.00 220,000.00 33,000.00 2,443,000.00
390,000.00 1,800,000.00 220,000.00 33,000.00 2,443,000.00
2,443,000.00
11,518,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 6.2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. II a. Bahan 1.200 M3 Kayu Kelas II+C1434
b. Tenaga 6.000 18.000 2.000 0.300
Oh Oh Oh Oh
6,500,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas III a. Bahan 1.200 M3 Kayu Kls. III
Oh Oh Oh Oh
7,800,000.00
3,300,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
3,960,000.00
3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
Oh Oh Oh Oh
119,550.00
1,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.6 1 M2 Pasang Pintu Kayu Jati a. Bahan 0.040 M3 Kayu Jati, Papan
Oh Oh Oh Oh
54,750.00
8,250,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.7 1 M2 Pasang Pintu Kayu Kls. II a. Bahan 0.040 M3 Kayu Kls. II
Oh Oh Oh Oh
330,000.00
6,500,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 33 -
260,000.00
390,000.00 1,620,000.00 220,000.00 33,000.00 2,263,000.00 6,223,000.00
118,800.00 750.00 119,550.00
22,750.00 94,500.00 11,550.00 1,980.00 130,780.00
22,750.00 94,500.00 11,550.00 1,980.00 130,780.00
130,780.00
250,330.00
54,000.00 750.00 54,750.00
22,750.00 94,500.00 11,550.00 1,980.00 130,780.00 130,780.00
22,750.00 94,500.00 11,550.00 1,980.00 130,780.00 185,530.00
330,000.00 330,000.00
65,000.00 225,000.00 27,500.00 5,500.00 323,000.00 323,000.00
260,000.00 260,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
390,000.00 1,620,000.00 220,000.00 33,000.00 2,263,000.00 2,263,000.00
330,000.00 330,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.000 2.500 0.250 0.050
390,000.00 1,620,000.00 220,000.00 33,000.00 2,263,000.00 10,063,000.00
3,960,000.00 10,903,470.00
54,000.00 750.00 54,750.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.000 2.500 0.250 0.050
390,000.00 1,620,000.00 220,000.00 33,000.00 2,263,000.00 2,263,000.00
118,800.00 750.00 119,550.00
65,000.00 90,000.00 110,000.00 110,000.00
6.5 1 M2 Pasang Pintu Klam Kayu Kls. IV a. Bahan 0.036 M3 Kayu Kls. IV 0.050 Kg Paku Biasa 2" - 5"
b. Tenaga 0.350 1.050 0.105 0.018
7,800,000.00 7,800,000.00
3,960,000.00 3,960,000.00
65,000.00 90,000.00 110,000.00 110,000.00
6.4 1 M2 Pasang Pintu Klam Kayu Kls. III a. Bahan 0.036 M3 Kayu Kls. III 0.050 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
Jumlah Bahan+Tenaga (Rp) 6
6,943,470.00
Jumlah
b. Tenaga 0.350 1.050 0.105 0.018
7,800,000.00 7,800,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 6.000 18.000 2.000 0.300
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
65,000.00 225,000.00 27,500.00 5,500.00 323,000.00 653,000.00
260,000.00 260,000.00
65,000.00 225,000.00 27,500.00 5,500.00 323,000.00
65,000.00 225,000.00 27,500.00 5,500.00 323,000.00
323,000.00
583,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 6.8 1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati a. Bahan 0.035 M3 Kayu Jati, b. Tenaga 0.800 2.000 0.200 0.040
Oh Oh Oh Oh
8,250,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
288,750.00
6,500,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.10 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. III a. Bahan 0.035 M3 Kayu Kls. III
Oh Oh Oh Oh
227,500.00
3,300,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.11 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Jati a. Bahan 0.064 M3 Kayu Jati, Papan
b. Tenaga 1.000 3.000 0.300 0.300
Oh Oh Oh Oh
115,500.00
8,250,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.12 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kls. II a. Bahan 0.064 M3 Kayu Kls. II b. Tenaga 1.000 3.000 0.300 0.500
Oh Oh Oh Oh
528,000.00
6,500,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah 6.13 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati a. Bahan 0.020 M3 Kayu Jati, Papan 0.030 Kg Paku Biasa 1/2" - 1" 0.300 1.000 b. Tenaga 0.600 2.000 0.200 0.030
Ltr Lem Kayu Lbr Plywood 4' x 8' x 4 mm
Oh Oh Oh Oh
416,000.00
8,250,000.00 18,000.00 20,000.00 68,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 34 -
236,240.00
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00 485,900.00
115,500.00 115,500.00
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00
258,400.00
373,900.00
528,000.00 528,000.00
65,000.00 270,000.00 33,000.00 33,000.00 401,000.00 401,000.00
65,000.00 270,000.00 33,000.00 33,000.00 401,000.00 929,000.00
416,000.00 416,000.00 65,000.00 270,000.00 33,000.00 55,000.00 423,000.00
65,000.00 270,000.00 33,000.00 55,000.00 423,000.00
423,000.00
839,000.00
161,700.00 540.00 6,000.00 68,000.00 236,240.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00 258,400.00
416,000.00 416,000.00
65,000.00 90,000.00 110,000.00 110,000.00
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00 547,150.00
227,500.00 227,500.00
528,000.00 528,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
52,000.00 180,000.00 22,000.00 4,400.00 258,400.00 258,400.00
115,500.00 115,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
288,750.00 14,980,350.00
227,500.00 227,500.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.800 2.000 0.200 0.040
288,750.00 288,750.00
65,000.00 90,000.00 110,000.00 110,000.00
6.9 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. II a. Bahan 0.035 M3 Kayu Kls. II
Oh Oh Oh Oh
Jumlah Bahan+Tenaga (Rp) 6 14,691,600.00
Jumlah
b. Tenaga 0.800 2.000 0.200 0.040
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
161,700.00 540.00 6,000.00 68,000.00 236,240.00 39,000.00 180,000.00 22,000.00 3,300.00 244,300.00 244,300.00
39,000.00 180,000.00 22,000.00 3,300.00 244,300.00 480,540.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
6.14 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kls. II a. Bahan 0.020 M3 Kayu Kls. II 0.030 Kg Paku Biasa 1/2" - 1" 0.300 Ltr Lem Kayu 1.000 Lbr Plywood 4' x 8' x 4 mm b. Tenaga 0.600 2.000 0.200 0.030
Oh Oh Oh Oh
6,500,000.00 18,000.00 20,000.00 68,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
127,400.00 540.00 6,000.00 68,000.00 201,940.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6.15 1 M Daun Pintu Plywood Sungkay rangkap, kayu kls. II a. Bahan 0.020 M3 Kayu Kelas II 1.000 Lbr Plywood Sungkai 3 mm 0.300 Ltr Lem Kayu 0.030 Kg Paku Biasa 1/2" - 1"
201,940.00
Jumlah Bahan+Tenaga (Rp) 6
127,400.00 540.00 6,000.00 68,000.00 201,940.00 39,000.00 180,000.00 22,000.00 3,300.00 244,300.00 244,300.00
39,000.00 180,000.00 22,000.00 3,300.00 244,300.00 446,240.00
2
b. Tenaga 2.000 0.200 0.600 0.030
Oh Oh Oh Oh
6,500,000.00 110,000.00 20,000.00 18,000.00
Tukang Kayu Kepala Tukang Pekerja Mandor
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
6.16 1 M3 Pasang Konstruksi Kuda-kuda Kayu Jati a. Bahan 1.100 M3 Kayu Jati, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5" b. Tenaga 4.000 12.000 1.200 0.200
Oh Oh Oh Oh
243,940.00
8,250,000.00 10,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.17 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. II a. Bahan 1.100 M3 Kayu Kelas II, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
9,237,000.00
6,500,000.00 10,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.18 1 M Pasang Konstruksi Kuda-kuda Kayu Kls. III a. Bahan 1.100 M3 Kayu Kls. III, Balok 15.000 Kg Besi Strip 0.800 Kg Paku Biasa 2" - 5"
180,000.00 22,000.00 39,000.00 3,300.00 244,300.00 244,300.00
7,312,000.00
180,000.00 22,000.00 39,000.00 3,300.00 244,300.00 488,240.00
9,075,000.00 150,000.00 12,000.00 9,237,000.00 260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 1,494,000.00
7,150,000.00 150,000.00 12,000.00 7,312,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
127,400.00 110,000.00 6,000.00 540.00 243,940.00
9,075,000.00 150,000.00 12,000.00 9,237,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 4.000 12.000 1.200 0.200
127,400.00 110,000.00 6,000.00 540.00 243,940.00
260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 10,731,000.00
7,150,000.00 150,000.00 12,000.00 7,312,000.00 260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 1,494,000.00
260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 8,806,000.00
3
b. Tenaga 4.000 12.000 1.200 0.200
Oh Oh Oh Oh
3,300,000.00 10,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
3,630,000.00 150,000.00 12,000.00 3,792,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6.19 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. III a. Bahan 0.012 M3 Kayu Kelas III, Untuk genteng kodok/biasa 0.014 M3 Kayu Kelas III, untuk genteng beton/keramik 0.150 Kg Paku Biasa 2" - 5" kayu kls. III, untuk genteng kodok/biasa kayu kls. III, untuk genteng beton
- 35 -
3,792,000.00
3,300,000.00 3,300,000.00 15,000.00
39,600.00 46,200.00 2,250.00 41,850.00 48,450.00
3,630,000.00 150,000.00 12,000.00 3,792,000.00 260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 1,494,000.00
260,000.00 1,080,000.00 132,000.00 22,000.00 1,494,000.00 5,286,000.00
39,600.00 46,200.00 2,250.00 41,850.00 48,450.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.100 0.100 0.010 0.005
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
kayu kls. III, untuk genteng kodok/biasa kayu kls. III, untuk genteng beton 6.20 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. II a. Bahan 0.012 M3 Kayu Kelas II, Untuk genteng kodok/biasa 0.014 M3 Kayu Kelas II, untuk genteng beton/keramik 0.150 Kg Paku Biasa 2" - 5" kayu kls. II, untuk genteng kodok/biasa kayu kls. II, untuk genteng beton b. Tenaga 0.100 Oh Pekerja 0.100 Oh Tukang Kayu 0.010 Oh Kepala Tukang 0.005 Oh Mandor kayu kls. II, untuk genteng kodok/biasa kayu kls. II, untuk genteng beton 6.21 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. II a. Bahan 0.017 M3 Kayu Kls. II, untuk sirap 0.010 M3 Kayu Kls. II, untuk seng dan asbes 0.200 Kg Paku Biasa 2" - 5" kayu kls. II, untuk sirap kayu kls. II, untuk seng/asbes b. Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Kayu 0.012 Oh Kepala Tukang 0.006 Oh Mandor
41,850.00 48,450.00
6,500,000.00 6,500,000.00 15,000.00
80,250.00 93,250.00
6,500,000.00 6,500,000.00 15,000.00
6.22 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. III a. Bahan 0.017 M3 Kayu Kls. III, Untuk sirap 0.010 M3 Kayu Kls. III, untuk seng dan asbes 0.200 Kg Paku Biasa 2" - 5" kayu kls. III, untuk sirap kayu kls. III, untuk seng/asbes b. Tenaga 0.120 Oh Pekerja 0.120 Oh Tukang Kayu 0.012 Oh Kepala Tukang 0.006 Oh Mandor
110,250.00 68,000.00
kayu kls. III, untuk sirap kayu kls. III, untuk seng/asbes 6.23 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Jati a. Bahan 0.012 M3 Kayu Jati, Unglen 0.100 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
57,450.00 36,000.00
8,250,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
b. Tenaga 0.150 0.250 0.025 0.075
Oh Oh Oh Oh
100,500.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
- 36 -
7,800.00 10,800.00 1,320.00 660.00 20,580.00 20,580.00 20,580.00
79,500.00
6,500.00 9,000.00 1,100.00 550.00 17,150.00 97,400.00 110,400.00
7,800.00 10,800.00 1,320.00 660.00 20,580.00 130,830.00 88,580.00
54,450.00 33,000.00 3,000.00 57,450.00 36,000.00 7,800.00 10,800.00 1,320.00 660.00 20,580.00 20,580.00 20,580.00
7,800.00 10,800.00 1,320.00 660.00 20,580.00 78,030.00 56,580.00
99,000.00 1,500.00 100,500.00 9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 43,250.00
78,000.00 1,500.00 79,500.00
65,000.00 90,000.00 110,000.00 110,000.00
6,500.00 9,000.00 1,100.00 550.00 17,150.00 59,000.00 65,600.00
107,250.00 65,000.00 3,000.00 110,250.00 68,000.00
99,000.00 1,500.00 100,500.00
65,000.00 90,000.00 110,000.00 110,000.00
6.24 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. II a. Bahan 0.012 M3 Kayu Kls. II 0.100 Kg Paku Biasa 2" - 5"
6,500.00 9,000.00 1,100.00 550.00 17,150.00 17,150.00 17,150.00
54,450.00 33,000.00 3,000.00 57,450.00 36,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
78,000.00 91,000.00 2,250.00 80,250.00 93,250.00
107,250.00 65,000.00 3,000.00 110,250.00 68,000.00
65,000.00 90,000.00 110,000.00 110,000.00
3,300,000.00 3,300,000.00 15,000.00
6,500.00 9,000.00 1,100.00 550.00 17,150.00 17,150.00 17,150.00
78,000.00 91,000.00 2,250.00 80,250.00 93,250.00
65,000.00 90,000.00 110,000.00 110,000.00
kayu kls. II, untuk sirap kayu kls. II, untuk seng/asbes
b. Tenaga 0.150 0.250 0.025 0.075
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 143,750.00
78,000.00 1,500.00 79,500.00 9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 43,250.00
9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 122,750.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
6.25 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. III a. Bahan 0.012 M3 Kayu Kls. III, Balok 0.100 Kg Paku Biasa 2" - 5" b. Tenaga 0.150 0.250 0.025 0.075
Oh Oh Oh Oh
3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.26 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Jati a. Bahan 0.023 M3 Kayu Jati, Balok 0.150 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
41,100.00
8,250,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.27 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kls. II a. Bahan 0.023 M3 Kayu Kls. II 0.150 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
192,000.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
6.28 1 M Pasang Rangka Langit-langit (30 x 60) m, Kayu Kls. III a. Bahan 0.023 M3 Kayu Kls. III 0.150 Kg Paku Biasa 2" - 5"
9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 43,250.00
151,750.00
9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 84,350.00
189,750.00 2,250.00 192,000.00 13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 44,400.00
149,500.00 2,250.00 151,750.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
39,600.00 1,500.00 41,100.00
189,750.00 2,250.00 192,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.300 0.030 0.010
39,600.00 1,500.00 41,100.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.300 0.030 0.010
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 236,400.00
149,500.00 2,250.00 151,750.00 13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 44,400.00
13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 196,150.00
2
b. Tenaga 0.200 0.300 0.030 0.010
Oh Oh Oh Oh
3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6.29 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Jati a. Bahan 0.027 M3 Kayu Jati, Balok 0.200 Kg Paku Biasa 2" - 5"
b. Tenaga 0.250 0.350 0.035 0.013
Oh Oh Oh Oh
78,150.00
8,250,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.30 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Kls. II a. Bahan 0.027 M3 Kayu Kls. II 0.200 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
225,750.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 37 -
13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 44,400.00
178,500.00
13,000.00 27,000.00 3,300.00 1,100.00 44,400.00 122,550.00
222,750.00 3,000.00 225,750.00
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00 52,975.00
175,500.00 3,000.00 178,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
75,900.00 2,250.00 78,150.00
222,750.00 3,000.00 225,750.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.250 0.350 0.035 0.013
75,900.00 2,250.00 78,150.00
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00 278,725.00
175,500.00 3,000.00 178,500.00
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00
52,975.00
231,475.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
6.31 1 M2 Pasang Rangka Langit-langit (30 x 30) m, Kayu Kls. III a. Bahan 0.027 M3 Kayu Kls. III 0.200 Kg Paku Biasa 2" - 5" b. Tenaga 0.250 0.350 0.035 0.013
Oh Oh Oh Oh
3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.32 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Jati a. Bahan 0.007 M3 Kayu Jati, Papan 0.050 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
92,100.00
8,250,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.33 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls. II a. Bahan 0.007 M3 Kayu Kls. II 0.050 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
60,150.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
6.34 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Jati a. Bahan 0.011 M3 Kayu Jati, Papan 0.050 Kg Paku Biasa 2" - 5" b. Tenaga 0.110 0.220 0.022 0.005
Oh Oh Oh Oh
47,550.00
8,250,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.35 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kls. II a. Bahan 0.011 M3 Kayu Kls. II 0.050 Kg Paku Biasa 2" - 5"
b. Tenaga 0.110 0.220 0.022 0.005
Oh Oh Oh Oh
91,500.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah 6.36 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls.II a. Bahan 0.015 M3 Kayu Kls.II 0.060 Kg Paku Biasa 2" - 5" b. Tenaga 0.150 0.250 0.025 0.075
Oh Oh Oh Oh
72,250.00
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 38 -
95,150.00
6,500.00 18,000.00 2,750.00 550.00 27,800.00 87,950.00
46,800.00 750.00 47,550.00 6,500.00 18,000.00 2,750.00 550.00 27,800.00 27,800.00
6,500.00 18,000.00 2,750.00 550.00 27,800.00 75,350.00
90,750.00 750.00 91,500.00 7,150.00 19,800.00 2,420.00 550.00 29,920.00 29,920.00
7,150.00 19,800.00 2,420.00 550.00 29,920.00 121,420.00
71,500.00 750.00 72,250.00
7,150.00 19,800.00 2,420.00 550.00 29,920.00
7,150.00 19,800.00 2,420.00 550.00 29,920.00
29,920.00
102,170.00
94,250.00 900.00 95,150.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6,500.00 18,000.00 2,750.00 550.00 27,800.00 27,800.00
71,500.00 750.00 72,250.00
65,000.00 90,000.00 110,000.00 110,000.00
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00 145,075.00
59,400.00 750.00 60,150.00
90,750.00 750.00 91,500.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
16,250.00 31,500.00 3,850.00 1,375.00 52,975.00 52,975.00
46,800.00 750.00 47,550.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
89,100.00 3,000.00 92,100.00
59,400.00 750.00 60,150.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.100 0.200 0.025 0.005
89,100.00 3,000.00 92,100.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.100 0.200 0.025 0.005
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
94,250.00 900.00 95,150.00 9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 43,250.00
9,750.00 22,500.00 2,750.00 8,250.00 43,250.00 138,400.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
6.37 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. II a. Bahan 0.009 M3 Kayu Kls. II 0.060 Kg Paku Biasa 2" - 5" b. Tenaga 0.100 0.100 0.010 0.050
Oh Oh Oh Oh
6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.38 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. III a. Bahan 0.009 M3 Kayu Kls. III 0.060 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
56,800.00
3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.39 1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. II a. Bahan 0.020 M3 Kayu Kls. II, Balok 0.007 M3 Kayu Kls.II, Papan 0.100 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
29,940.00
6,500,000.00 6,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah 6.40 1 M Pasang Rangka Dinding Pemisah + Papan Kayu Kls. III a. Bahan 0.020 M3 Kayu Kls. III, Balok 0.007 M3 Kayu Kls. III, Papan 0.100 Kg Paku Biasa 2" - 5"
6,500.00 9,000.00 1,100.00 5,500.00 22,100.00 22,100.00
173,750.00
6,500.00 9,000.00 1,100.00 5,500.00 22,100.00 78,900.00
29,040.00 900.00 29,940.00 6,500.00 9,000.00 1,100.00 5,500.00 22,100.00 22,100.00
126,750.00 45,500.00 1,500.00 173,750.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
55,900.00 900.00 56,800.00
29,040.00 900.00 29,940.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.150 0.450 0.045 0.075
55,900.00 900.00 56,800.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.100 0.100 0.010 0.050
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
6,500.00 9,000.00 1,100.00 5,500.00 22,100.00 52,040.00
126,750.00 45,500.00 1,500.00 173,750.00 9,750.00 40,500.00 4,950.00 8,250.00 63,450.00
9,750.00 40,500.00 4,950.00 8,250.00 63,450.00
63,450.00
237,200.00
2
b. Tenaga 0.150 0.450 0.045 0.075
Oh Oh Oh Oh
3,300,000.00 3,300,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6.41 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu kls. II a. Bahan 0.020 M3 Kayu Kls. II, Balok 0.007 M3 Kayu Kls. II, Papan 0.100 Kg Paku Biasa 2" - 5" b. Tenaga 0.150 0.450 0.045 0.075
Oh Oh Oh Oh
64,350.00 23,100.00 1,500.00 88,950.00
Pekerja Tukang Kayu Kepala Tukang Mandor
88,950.00
6,500,000.00 6,500,000.00 15,000.00
6.42 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas III a. Bahan 0.020 M3 Kayu Kelas III, Balok 0.007 M3 Kayu Kelas III, Papan 0.100 Kg Paku Biasa 2" - 5" 0.560 Ltr Lem Kayu 1.000 Lbr Plywood 4' x 8' x 4 mm
- 39 -
173,750.00
3,300,000.00 3,300,000.00 15,000.00 20,000.00 68,000.00
9,750.00 40,500.00 4,950.00 8,250.00 63,450.00 63,450.00
126,750.00 45,500.00 1,500.00 173,750.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
64,350.00 23,100.00 1,500.00 88,950.00
64,350.00 23,100.00 1,500.00 11,200.00 68,000.00 168,150.00
9,750.00 40,500.00 4,950.00 8,250.00 63,450.00 152,400.00
126,750.00 45,500.00 1,500.00 173,750.00 9,750.00 40,500.00 4,950.00 8,250.00 63,450.00 63,450.00
9,750.00 40,500.00 4,950.00 8,250.00 63,450.00 237,200.00
64,350.00 23,100.00 1,500.00 11,200.00 68,000.00 168,150.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.200 0.600 0.060 0.010
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
6.43 1 M2 Pasang Dinding Lambriziring Dari Papan Jati a. Bahan 0.007 M3 Kayu Jati, Balok 0.100 Kg Paku Biasa 2" - 5" 0.150 Kg Paku Skrup 3,5" b. Tenaga 0.600 1.800 0.180 0.030
Oh Oh Oh Oh
168,150.00
8,250,000.00 15,000.00 45,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
Oh Oh Oh Oh
66,000.00
68,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
6.45 1 M' Pasang List Plafond Kayu Profil a. Bahan 1.050 M' Kayu Profil kecil 1.050 M' Kayu Profil sedang 1.050 M' Kayu Profil besar
28,100.00
2,500.00 3,500.00 7,500.00 Kayu Profil kecil Kayu Profil sedang Kayu Profil besar
b. Tenaga 0.021 0.021 0.002 0.001
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor Kayu Profil kecil Kayu Profil sedang Kayu Profil Besar
6.46 1 M2 Pasang Interior Display lapis plywood Sungkay + politur a. Bahan 0.360 Kpg Plywood Sungkay 3 mm 0.360 Kpg Plywood 4 mm 0.600 Kg Lem Vinyl 0.150 Ltr Politur dasar 0.372 Ltr Politur jadi 2.000 Lbr Amplas 0.220 Kg Paku Biasa b. Tenaga 0.145 0.008 0.110 0.005
Oh Oh Oh Oh
2,625.00 3,675.00 7,875.00
110,000.00 68,000.00 8,500.00 49,000.00 53,000.00 3,500.00 15,000.00
Tukang Cat Kepala Tukang Pekerja Mandor
106,546.00
b. Tenaga 0.075 0.008 0.025 0.001
Oh Oh Oh Oh
Tukang Kayu Kepala Tukang Pekerja Mandor
110,000.00 18,000.00
40,500.00
- 40 -
1,625.00 6,750.00 825.00 143.00 9,343.00 9,343.00
39,000.00 162,000.00 19,800.00 3,300.00 224,100.00 290,100.00
1,625.00 6,750.00 825.00 143.00 9,343.00 37,443.00
2,625.00 3,675.00 7,875.00 2,625.00 3,675.00 7,875.00 1,365.00 1,890.00 220.00 110.00 3,585.00 3,585.00 3,585.00 3,585.00
1,365.00 1,890.00 220.00 110.00 3,585.00 6,210.00 7,260.00 11,460.00
39,600.00 24,480.00 5,100.00 7,350.00 19,716.00 7,000.00 3,300.00 106,546.00 13,050.00 880.00 7,150.00 550.00 21,630.00 21,630.00
39,600.00 900.00 40,500.00
90,000.00 110,000.00 65,000.00 110,000.00
13,000.00 54,000.00 6,600.00 1,100.00 74,700.00 242,850.00
27,200.00 900.00 28,100.00
39,600.00 24,480.00 5,100.00 7,350.00 19,716.00 7,000.00 3,300.00 106,546.00
90,000.00 110,000.00 65,000.00 110,000.00
6.47 1 M2 Pasang lapis plywood Sungkay tanpa rangka, politur dan lis profil a. Bahan 0.360 Kpg Plywood Sungkay 3 mm 0.050 Kg Paku 1/2" - 1 "
39,000.00 162,000.00 19,800.00 3,300.00 224,100.00 224,100.00
2,625.00 3,675.00 7,875.00 2,625.00 3,675.00 7,875.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
57,750.00 1,500.00 6,750.00 66,000.00
27,200.00 900.00 28,100.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13,000.00 54,000.00 6,600.00 1,100.00 74,700.00 74,700.00
57,750.00 1,500.00 6,750.00 66,000.00
65,000.00 90,000.00 110,000.00 110,000.00
6.44 1 M2 Pasang Plywood Tebal 4 mm, Untuk Dinding a. Bahan 0.400 Lbr Plywood 4' x 8' x 4 mm 0.050 Kg Paku Biasa 1/2" - 1" b. Tenaga 0.025 0.075 0.008 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
13,050.00 880.00 7,150.00 550.00 21,630.00 128,176.00
39,600.00 900.00 40,500.00 6,750.00 825.00 1,625.00 143.00 9,343.00 9,343.00
6,750.00 825.00 1,625.00 143.00 9,343.00 49,843.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
6.48 1 M2 Pasang lapis plywood Sungkay + list kayu, tanpa rangka dan politur a. Bahan 0.360 Kpg Plywood Sungkay 3 mm 0.250 LS List kayu 0.150 Kg Paku 1/2" - 2 " 2.000 Lbr Amplas b. Tenaga 0.096 0.010 0.046 0.002
Oh Oh Oh Oh
Tukang Kayu Kepala Tukang Pekerja Mandor
110,000.00 2,500.00 18,000.00 3,500.00
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
39,600.00 625.00 2,700.00 7,000.00 49,925.00
90,000.00 110,000.00 65,000.00 110,000.00 49,925.00
6.49 1 M2 Pasangan Interior display + lapis jati dipolitur Bahan 0.360 Kpg Plywood Jati 3 mm 0.360 Kpg Plywood 20 mm 0.600 Kg Lem Vinyl 0.150 Ltr Politur dasar 0.372 Ltr Politur jadi 2.000 Lbr Amplas 0.220 Kg Paku
110,000.00 210,000.00 8,500.00 49,000.00 53,000.00 3,500.00 15,000.00
Jumlah Bahan+Tenaga (Rp) 6
39,600.00 625.00 2,700.00 7,000.00 49,925.00 8,640.00 1,045.00 2,990.00 253.00 12,928.00 12,928.00
39,600.00 75,600.00 5,100.00 7,350.00 19,716.00 7,000.00 3,300.00 157,666.00
8,640.00 1,045.00 2,990.00 253.00 12,928.00 62,853.00
39,600.00 75,600.00 5,100.00 7,350.00 19,716.00 7,000.00 3,300.00 157,666.00
Tenaga 0.025 0.135 0.024 0.004
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 157,666.00
6.50 1 M2 Dinding Sekat Teakwood 4 mm, Rangkap + Rangka Kayu kls. II a. Bahan 0.020 M3 Kayu Kelas II 2.000 M2 Teakwood 4 mm 0.100 Kg Paku Biasa 2"-5" 0.050 Kg Paku Plywood b. Tenaga 0.450 0.045 0.150 0.075
Oh Oh Oh Oh
Tukang Kayu Kepala Tukang Pekerja Mandor
6,500,000.00 40,000.00 15,000.00 18,000.00
126,750.00 80,000.00 1,500.00 900.00 209,150.00
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
6.51 1 M Dinding pemisah Plywood Sungkai rangkap + rangka kayu kls. II a. Bahan 0.020 M3 Kayu Kelas II 0.007 M3 Kayu Kelas II, Papan 0.100 Kg Paku Biasa 2"-5" 1.000 Lbr Plywood Sungkai 0.050 Kg Paku Plywood
1,625.00 12,150.00 2,585.00 418.00 16,778.00 16,778.00
209,150.00
1,625.00 12,150.00 2,585.00 418.00 16,778.00 174,444.00
126,750.00 80,000.00 1,500.00 900.00 209,150.00 40,500.00 4,950.00 9,750.00 8,250.00 63,450.00 63,450.00
40,500.00 4,950.00 9,750.00 8,250.00 63,450.00 272,600.00
2
b. Tenaga 0.600 0.060 0.200 0.010
Oh Oh Oh Oh
Tukang Kayu Kepala Tukang Pekerja Mandor
6,500,000.00 3,300,000.00 15,000.00 110,000.00 18,000.00
90,000.00 110,000.00 65,000.00 110,000.00
Jumlah VII
126,750.00 23,100.00 1,500.00 110,000.00 900.00 262,250.00
262,250.00
126,750.00 23,100.00 1,500.00 110,000.00 900.00 262,250.00 54,000.00 6,600.00 13,000.00 1,100.00 74,700.00
54,000.00 6,600.00 13,000.00 1,100.00 74,700.00
74,700.00
336,950.00
PEKERJAAN BETON 7.1 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr a. Bahan 218.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.870 M3 Koral Beton b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
272,500.00 48,100.00 366,864.21 687,464.21
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
- 41 -
687,464.21
272,500.00 48,100.00 366,864.21 687,464.21 107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
141,300.00
828,764.21
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 7.2 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr a. Bahan 197.000 Kg Semen Portland 0.470 M3 Pasir Beton 0.940 M3 Koral Beton
b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
246,250.00 43,475.00 396,382.02 686,107.02
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.3 1 M Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr a. Bahan 173.000 Kg Semen Portland 0.570 M3 Pasir Beton 0.870 M3 Koral Beton
686,107.02
Jumlah Bahan+Tenaga (Rp) 6
246,250.00 43,475.00 396,382.02 686,107.02
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 827,407.02
3
b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.4 1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm a. Bahan 10.000 Kg Semen Portland 0.026 M3 Pasir Beton 0.044 M3 Koral Beton b. Tenaga 1.150 0.020 0.002 0.006
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
635,839.21
1,250.00 92,500.00 421,683.00
7.5 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr a. Bahan 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton
Oh Oh Oh Oh
33,459.05
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.6 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Kr a. Bahan 280.000 Kg Semen Portland 0.450 M3 Pasir Beton 0.900 M3 Koral Beton
b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
667,012.74
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.7 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 2,5 Kr a. Bahan 352.000 Kg Semen Portland 0.560 M3 Pasir Beton 0.700 M3 Koral Beton
771,139.70
1,250.00 92,500.00 421,683.00
- 42 -
440,000.00 51,800.00 295,178.10 786,978.10
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 777,139.21
12,500.00 2,405.00 18,554.05 33,459.05 74,750.00 1,800.00 220.00 660.00 77,430.00 77,430.00
74,750.00 1,800.00 220.00 660.00 77,430.00 110,889.05
290,000.00 48,100.00 328,912.74 667,012.74 107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
350,000.00 41,625.00 379,514.70 771,139.70
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
290,000.00 48,100.00 328,912.74 667,012.74
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
216,250.00 52,725.00 366,864.21 635,839.21
12,500.00 2,405.00 18,554.05 33,459.05
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.650 0.250 0.025 0.080
216,250.00 52,725.00 366,864.21 635,839.21
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 808,312.74
350,000.00 41,625.00 379,514.70 771,139.70
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 912,439.70
440,000.00 51,800.00 295,178.10 786,978.10
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.8 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Kr a. Bahan 357.000 Kg Semen Portland 0.420 M3 Pasir Beton 0.540 M3 Koral Beton b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
786,978.10
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.9 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Kr a. Bahan 386.000 Kg Semen Portland 0.470 M3 Pasir Beton 0.780 M3 Koral Beton
Oh Oh Oh Oh
712,808.82
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.10 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 2 Kr a. Bahan 479.000 Kg Semen Portland 0.370 M3 Pasir Beton 0.740 M3 Koral Beton b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
854,887.74
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
7.11 1 M Membuat Tiang Pancang Prestressed Beton a. Bahan 440.000 Kg Semen Portland 0.500 M3 Pasir Beton 0.800 M3 Koral Beton Pecah Split 2.460 Gln Rapidrant
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
945,020.42
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 928,278.10
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 854,108.82
482,500.00 43,475.00 328,912.74 854,887.74 107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
141,300.00
996,187.74
598,750.00 34,225.00 312,045.42 945,020.42
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
446,250.00 38,850.00 227,708.82 712,808.82
482,500.00 43,475.00 328,912.74 854,887.74
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
446,250.00 38,850.00 227,708.82 712,808.82
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.650 0.250 0.025 0.080
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
598,750.00 34,225.00 312,045.42 945,020.42 107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00 1,086,320.42
3
b. Tenaga 1.650 0.250 0.025 0.080
Oh Oh Oh Oh
1,250.00 92,500.00 468,000.00 -
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.12 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Split a. Bahan 336.000 Kg Semen Portland 0.540 M3 Pasir Beton 0.810 M3 Koral Beton Pecah Split b. Tenaga 2.000 0.350 0.035 1.000
Oh Oh Oh Oh
550,000.00 46,250.00 374,400.00 970,650.00
970,650.00
1,250.00 92,500.00 468,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
- 43 -
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
107,250.00 22,500.00 2,750.00 8,800.00 141,300.00
141,300.00
1,111,950.00
420,000.00 49,950.00 379,080.00 849,030.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
550,000.00 46,250.00 374,400.00 970,650.00
849,030.00
420,000.00 49,950.00 379,080.00 849,030.00 130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 275,350.00
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 1,124,380.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 7.13 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Split a. Bahan 291.000 Kg Semen Portland 0.470 M3 Pasir Beton 0.930 M3 Koral Beton pecah Split b. Tenaga 2.000 0.350 0.035 1.000
Oh Oh Oh Oh
1,250.00 92,500.00 468,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.14 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Split a. Bahan 367.000 Kg Semen Portland 0.440 M3 Pasir Beton 0.880 M3 Koral Beton 2/3 Split
Oh Oh Oh Oh
363,750.00 43,475.00 435,240.00 842,465.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 2.000 0.350 0.035 1.000
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
842,465.00
1,250.00 92,500.00 471,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah 7.15 1 M Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Split a. Bahan 400.000 Kg Semen Portland 0.480 M3 Pasir Beton 0.800 M3 Koral Beton 2/3 Split
363,750.00 43,475.00 435,240.00 842,465.00 130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 275,350.00
458,750.00 40,700.00 415,081.04 914,531.04
65,000.00 90,000.00 110,000.00 110,000.00
914,531.04
Jumlah Bahan+Tenaga (Rp) 6
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 1,117,815.00
458,750.00 40,700.00 415,081.04 914,531.04 130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
275,350.00
1,189,881.04
3
b. Tenaga 2.000 0.350 0.035 1.000
Oh Oh Oh Oh
1,250.00 92,500.00 471,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.16 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 1 Split a. Bahan 615.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.520 M3 Koral Beton Pecah Split
b. Tenaga 2.000 0.350 0.035 1.000
Oh Oh Oh Oh
921,746.40
1,250.00 92,500.00 471,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.17 1 M3 Membuat Beton Kedap Air dengan Strorox - 100 a. Bahan 400.000 Kg Semen Portland 0.480 M3 Pasir Beton 0.800 M3 Koral Beton 2/3 1.200 Kg Strorox - 100
Oh Oh Oh Oh
1,062,125.16
1,250.00 92,500.00 471,683.00 -
Pekerja Tukang Batu Kepala Tukang Mandor
500,000.00 44,400.00 377,346.40 921,746.40 130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
275,350.00
1,197,096.40
768,750.00 48,100.00 245,275.16 1,062,125.16
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 2.000 0.350 0.035 1.000
500,000.00 44,400.00 377,346.40 921,746.40
768,750.00 48,100.00 245,275.16 1,062,125.16
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 275,350.00
500,000.00 44,400.00 377,346.40 921,746.40
65,000.00 90,000.00 110,000.00 110,000.00
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00 1,337,475.16
500,000.00 44,400.00 377,346.40 921,746.40 130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
130,000.00 31,500.00 3,850.00 110,000.00 275,350.00
Jumlah 7.18 1 Kg Pembesian dengan Besi Polos atau Besi Ulir a. Bahan 1.050 Kg Besi Beton ( Polos / Ulir ) 0.015 Kg Kawat Beton
19,000.00 18,000.00
- 44 -
19,950.00 270.00 20,220.00
19,950.00 270.00 20,220.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.007 0.007 0.001 0.000
Oh Oh Oh Oh
Pekerja Tukang Besi Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.19 1 Kg Kabel Presstressed Polos / Strands a. Bahan 1.050 Kg Besi Presstressed Polos 0.010 Kg Kawat Beton b. Tenaga 0.005 0.005 0.001 0.000
Oh Oh Oh Oh
20,220.00
19,000.00 18,000.00
Pekerja Tukang Besi Kepala Tukang Mandor
7.20 1 M2 Pasang Bekisting Untuk Pondasi a. Bahan 0.040 M3 Kayu Kls. IV 0.300 Kg Paku Biasa 2"- 5"
Oh Oh Oh Oh
20,130.00
1,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
7.21 1 M2 Pasang Bekisting Untuk Sloof a. Bahan 0.045 M3 Kayu Kls. IV 0.300 Kg Paku Biasa 2"- 5"
b. Tenaga 0.300 0.260 0.026 0.005
Oh Oh Oh Oh
64,500.00
1,500,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah 7.22 1 M2 Pasang Bekisting Untuk Kolom (Untuk bangunan gedung) a. Bahan 0.040 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.015 M3 Balok Kayu Kls. IV 2.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 0.300 0.330 0.033 0.006
Oh Oh Oh Oh
72,000.00
1,500,000.00 15,000.00 1,500,000.00 8,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
7.23 1 M Pasang Bekisting Untuk Kolom (Jerambah Beton) a. Bahan 0.020 M3 Kayu Kls. IV 0.500 Btg Hek 0.200 Kg Paku Biasa 2"- 5"
104,500.00
455.00 630.00 77.00 33.00 1,195.00 21,415.00
325.00 450.00 55.00 33.00 863.00 20,993.00
60,000.00 4,500.00 64,500.00 19,500.00 23,400.00 2,860.00 550.00 46,310.00
19,500.00 23,400.00 2,860.00 550.00 46,310.00
46,310.00
110,810.00
67,500.00 4,500.00 72,000.00
19,500.00 23,400.00 2,860.00 550.00 46,310.00
19,500.00 23,400.00 2,860.00 550.00 46,310.00
46,310.00
118,310.00
60,000.00 6,000.00 22,500.00 16,000.00 104,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
325.00 450.00 55.00 33.00 863.00 863.00
67,500.00 4,500.00 72,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
19,950.00 180.00 20,130.00
60,000.00 4,500.00 64,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
455.00 630.00 77.00 33.00 1,195.00 1,195.00
19,950.00 180.00 20,130.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.300 0.260 0.026 0.005
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
60,000.00 6,000.00 22,500.00 16,000.00 104,500.00 19,500.00 29,700.00 3,630.00 660.00 53,490.00
19,500.00 29,700.00 3,630.00 660.00 53,490.00
53,490.00
157,990.00
2
b. Tenaga 0.150 0.165 0.017 0.003
Oh Oh Oh Oh
1,500,000.00 9,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
30,000.00 4,500.00 3,000.00 37,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
- 45 -
37,500.00
30,000.00 4,500.00 3,000.00 37,500.00 9,750.00 14,850.00 1,815.00 330.00 26,745.00
9,750.00 14,850.00 1,815.00 330.00 26,745.00
26,745.00
64,245.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 7.24 1 M2 Pasang Bekisting Untuk Balok (Untuk bangunan gedung) a. Bahan 0.040 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.018 M3 Balok Kayu Kls. IV 2.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 0.320 0.330 0.033 0.006
Oh Oh Oh Oh
1,500,000.00 15,000.00 1,500,000.00 8,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
7.25 1 M2 Pasang Bekisting Untuk Balok (Jerambah Beton) a. Bahan 0.020 M3 Kayu Kls. IV 0.500 Btg Hek 2.000 Btg Kayu Gelam dia. 6-8 cm 0.200 Kg Paku Biasa 2"- 5"
Oh Oh Oh Oh
109,000.00
1,500,000.00 9,000.00 8,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
7.26 1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung) a. Bahan 0.040 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.015 M3 Balok Kayu Kls.IV 6.000 Btg Kayu Gelam dia. 6-8 cm
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
53,500.00
1,500,000.00 15,000.00 1,500,000.00 8,000.00
Jumlah 7.27 1 M2 Pasang Bekisting Untuk Lantai ( jerambah beton) a. Bahan 1.500 Kpg Papan Kayu Kls IV 0.200 Kg Paku Biasa 2"- 5" 2.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 0.320 0.330 0.033 0.006
Oh Oh Oh Oh
136,500.00
16,500.00 15,000.00 8,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.28 1 M2 Pasang Bekisting Untuk Dinding a. Bahan 0.030 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.020 M3 Balok Kayu Kls.IV 3.000 Btg Kayu Gelam dia. 6-8 cm 4.000 Bh Formtie / Penjaga Jarak Bekisting / Spacer b. Tenaga 0.320 0.330 0.033 0.006
Oh Oh Oh Oh
43,750.00
1,500,000.00 15,000.00 1,500,000.00 8,000.00 -
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
7.29 1 M2 Pasang Bekisting Untuk Tangga a. Bahan 0.030 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.015 M3 Balok Kayu Kls. IV 2.000 Btg Kayu Gelam dia. 6-8 cm
105,000.00
1,500,000.00 15,000.00 1,500,000.00 8,000.00
- 46 -
10,400.00 14,850.00 1,815.00 330.00 27,395.00 27,395.00
45,000.00 6,000.00 22,500.00 16,000.00 89,500.00
10,400.00 14,850.00 1,815.00 330.00 27,395.00 80,895.00
60,000.00 6,000.00 22,500.00 48,000.00 136,500.00 20,800.00 29,700.00 3,630.00 660.00 54,790.00 54,790.00
20,800.00 29,700.00 3,630.00 660.00 54,790.00 191,290.00
24,750.00 3,000.00 16,000.00 43,750.00 20,800.00 29,700.00 3,630.00 660.00 54,790.00 54,790.00
45,000.00 6,000.00 30,000.00 24,000.00 105,000.00
65,000.00 90,000.00 110,000.00 110,000.00
20,800.00 29,700.00 3,630.00 660.00 54,790.00 163,790.00
30,000.00 4,500.00 16,000.00 3,000.00 53,500.00
24,750.00 3,000.00 16,000.00 43,750.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
20,800.00 29,700.00 3,630.00 660.00 54,790.00 54,790.00
60,000.00 6,000.00 22,500.00 48,000.00 136,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
60,000.00 6,000.00 27,000.00 16,000.00 109,000.00
30,000.00 4,500.00 16,000.00 3,000.00 53,500.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.320 0.330 0.033 0.006
60,000.00 6,000.00 27,000.00 16,000.00 109,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.160 0.165 0.017 0.003
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
20,800.00 29,700.00 3,630.00 660.00 54,790.00 98,540.00
45,000.00 6,000.00 30,000.00 24,000.00 105,000.00 20,800.00 29,700.00 3,630.00 660.00 54,790.00 54,790.00
20,800.00 29,700.00 3,630.00 660.00 54,790.00 159,790.00
45,000.00 6,000.00 22,500.00 16,000.00 89,500.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.320 0.330 0.033 0.006
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.30 1 M3 Beton Ready Mix K 175 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 175 b. Tenaga 2.000 0.167 0.002 0.050 1.000
Oh Oh Oh Oh Ls
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
89,500.00
850,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up
867,000.00 867,000.00
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33
Jumlah 7.31 1 M Beton Ready Mix K 175 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 175
20,800.00 29,700.00 3,630.00 660.00 54,790.00 54,790.00
867,000.00
Jumlah Bahan+Tenaga (Rp) 6 20,800.00 29,700.00 3,630.00 660.00 54,790.00 144,290.00
867,000.00 867,000.00 130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70
166,269.70
1,033,269.70
3
b. Tenaga 2.000 0.167 0.002 0.050
Oh Oh Oh Oh
850,000.00
Pekerja Tukang batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.32 1 M3 Beton Ready Mix K 225 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 225 b. Tenaga 2.000 0.167 0.002 0.050 1.000
Oh Oh Oh Oh Ls
867,000.00 867,000.00
867,000.00
900,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up
7.33 1 M Beton Ready Mix K 225 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 225
130,000.00 15,003.00 183.37 5,500.00 150,686.37 150,686.37
918,000.00 918,000.00
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33 Jumlah
867,000.00 867,000.00
918,000.00
130,000.00 15,003.00 183.37 5,500.00 150,686.37 1,017,686.37
918,000.00 918,000.00 130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 166,269.70
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 1,084,269.70
3
b. Tenaga 2.000 0.167 0.002 0.050
Oh Oh Oh Oh
900,000.00
Pekerja Tukang batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.34 1 M3 Beton Ready Mix K 250 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 250 b. Tenaga 2.000 0.167 0.002 0.050 1.000
Oh Oh Oh Oh Ls
918,000.00
950,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up Jumlah
Oh Oh Oh Oh
969,000.00
950,000.00
Pekerja Tukang batu Kepala Tukang Mandor
- 47 -
130,000.00 15,003.00 183.37 5,500.00 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37
150,686.37
1,068,686.37
969,000.00 969,000.00 130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 166,269.70
969,000.00 969,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
918,000.00 918,000.00
969,000.00 969,000.00
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33
7.35 1 M3 Beton Ready Mix K 250 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 250 b. Tenaga 2.000 0.167 0.002 0.050
918,000.00 918,000.00
969,000.00
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 1,135,269.70
969,000.00 969,000.00 130,000.00 15,003.00 183.37 5,500.00 150,686.37 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37 1,119,686.37
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 7.36 1 M3 Beton Ready Mix K 275 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 275
b. Tenaga 2.000 0.167 0.002 0.050 1.000
Oh Oh Oh Oh Ls
1,000,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up
7.37 1 M3 Beton Ready Mix K 275 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 275
Oh Oh Oh Oh
1,020,000.00
1,000,000.00
Pekerja Tukang batu Kepala Tukang Mandor
7.38 1 M3 Beton Ready Mix K 300 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 300
Oh Oh Oh Oh Ls
1,020,000.00
1,050,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up Jumlah
7.39 1 M3 Beton Ready Mix K 300 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 300 b. Tenaga 2.000 0.167 0.002 0.050
Oh Oh Oh Oh
1,071,000.00
1,050,000.00
Pekerja Tukang batu Kepala Tukang Mandor
7.40 1 M Beton Ready Mix K 350 dengan pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 350
1,071,000.00
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 1,186,269.70
1,020,000.00 1,020,000.00 130,000.00 15,003.00 183.37 5,500.00 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37
150,686.37
1,170,686.37
1,071,000.00 1,071,000.00
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 166,269.70
1,071,000.00 1,071,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 166,269.70
1,071,000.00 1,071,000.00
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33
Jumlah Bahan+Tenaga (Rp) 6
1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 2.000 0.167 0.002 0.050 1.000
1,020,000.00 1,020,000.00
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33 Jumlah
b. Tenaga 2.000 0.167 0.002 0.050
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 1,237,269.70
1,071,000.00 1,071,000.00 130,000.00 15,003.00 183.37 5,500.00 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37
150,686.37
1,221,686.37
3
b. Tenaga 2.000 0.167 0.002 0.050 1.000
Oh Oh Oh Oh Ls
1,100,000.00
Pekerja Tukang batu Kepala Tukang Mandor Pengangkutan dan mobilisasi mobil Pick up
65,000.00 90,000.00 110,000.00 110,000.00 15,583.33 Jumlah
7.41 1 M3 Beton Ready Mix K 350 tanpa pengangkutan a. Bahan 1.020 M3 Beton Ready Mix K 350
b. Tenaga 2.000 0.167 0.002 0.050
Oh Oh Oh Oh
1,122,000.00 1,122,000.00
1,122,000.00
1,100,000.00
Pekerja Tukang batu Kepala Tukang Mandor
- 48 -
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 166,269.70
1,122,000.00 1,122,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
1,122,000.00 1,122,000.00
1,122,000.00
130,000.00 15,003.00 183.37 5,500.00 15,583.33 166,269.70 1,288,269.70
1,122,000.00 1,122,000.00
130,000.00 15,003.00 183.37 5,500.00 150,686.37 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37 1,272,686.37
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 7.42 1 M' Pasang Kayu Mal Bekisting untuk Beton Ready Mix jalan a. Bahan 0.500 Kpg Papan Kayu Kls. IV 0.200 Kg Paku Biasa 2"- 5" 0.009 M3 Balok Kayu Kls. IV
b. Tenaga 0.160 0.165 0.017 0.003
Oh Oh Oh Oh
16,500.00 15,000.00 1,500,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
Oh Oh Oh Oh
24,750.00
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.44 1 M3 Membuat Beton dengan Mutu K 275 a. Bahan 400.000 Kg Semen Portland 0.400 M3 Pasir Beton 0.820 M3 Koral Beton b. Tenaga 6.000 1.000 0.100 0.300
Oh Oh Oh Oh
1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Kepala Tukang Mandor
7.45 1 M2 Pasang Jembatan Cor a. Bahan 0.026 M3 Kayu Kls. IV 0.600 Kg Paku Biasa 2"- 5" 0.500 Btg Kayu Gelam dia. 6-8 cm
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
7.46 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting ) a. Bahan 0.200 M3 Kayu Kls. IV 1.500 Kg Paku Biasa 2"- 5" 150.000 Kg Besi Beton Polos 2.250 Kg Kawat Beton 323.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton
b. Tenaga 3.900 0.350 1.040 1.050 0.245 0.165
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
7.47 1 M3 Membuat Sloof Beton Bertulang ( 100 Kg Besi + Bekisting )
- 49 -
52,145.00
485,000.00 60,125.00 274,093.95 819,218.95
819,218.95
524,000.00
1,343,218.95
500,000.00 37,000.00 345,780.06 882,780.06
500,000.00 37,000.00 345,780.06 882,780.06 390,000.00 90,000.00 11,000.00 33,000.00 524,000.00
390,000.00 90,000.00 11,000.00 33,000.00 524,000.00
524,000.00
1,406,780.06
39,600.00 9,000.00 4,000.00 52,600.00
39,600.00 9,000.00 4,000.00 52,600.00 9,750.00 4,500.00 550.00 770.00 15,570.00
9,750.00 4,500.00 550.00 770.00 15,570.00
15,570.00
68,170.00
300,000.00 22,500.00 2,850,000.00 40,500.00 403,750.00 48,100.00 328,912.74 3,993,762.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
Jumlah
27,395.00
390,000.00 90,000.00 11,000.00 33,000.00 524,000.00
52,600.00
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00
10,400.00 14,850.00 1,815.00 330.00 27,395.00
390,000.00 90,000.00 11,000.00 33,000.00 524,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
10,400.00 14,850.00 1,815.00 330.00 27,395.00
0.17 0.02 0.05
882,780.06
1,500,000.00 15,000.00 8,000.00
Jumlah Bahan+Tenaga (Rp) 6
8,250.00 3,000.00 13,500.00 24,750.00
485,000.00 60,125.00 274,093.95 819,218.95
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.150 0.050 0.005 0.007
8,250.00 3,000.00 13,500.00 24,750.00
65,000.00 90,000.00 110,000.00 110,000.00
7.43 1 M3 Membuat Beton dengan Mutu K 225 a. Bahan 388.000 Kg Semen Portland 0.650 M3 Pasir Beton 0.650 M3 Koral Beton b. Tenaga 6.000 1.000 0.100 0.300
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
3,993,762.74
300,000.00 22,500.00 2,850,000.00 40,500.00 403,750.00 48,100.00 328,912.74 3,993,762.74
253,500.00 31,500.00 93,600.00 94,500.00 26,950.00 18,150.00 518,200.00
253,500.00 31,500.00 93,600.00 94,500.00 26,950.00 18,150.00 518,200.00
518,200.00
4,511,962.74
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 a. Bahan 0.270 2.000 100.000 3.000 323.000 0.520 0.780
M3 Kg Kg Kg Kg M3 M3
Kayu Kls. IV Paku Biasa 2"- 5" Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton
b. Tenaga 4.850 0.350 1.560 1.400 0.331 0.170
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00
Jumlah 7.49 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting ) a. Bahan 0.400 M3 Kayu Kls. IV 4.000 Kg Paku Biasa 2"- 5" 200.000 Kg Besi Beton Polos 4.500 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.150 M3 Kayu Balok Kls. IV 20.000 Btg Kayu Gelam dia. 6-8 cm
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
Oh Oh Oh Oh Oh Oh
3,169,762.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00 65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
7,606,762.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
- 50 -
315,250.00 31,500.00 140,400.00 126,000.00 36,410.00 18,700.00 668,260.00 3,838,022.74
474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 1,082,200.00
600,000.00 60,000.00 5,700,000.00 81,000.00 403,750.00 48,100.00 328,912.74 225,000.00 160,000.00 7,606,762.74 474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 8,688,962.74
600,000.00 60,000.00 3,800,000.00 81,000.00 290,000.00 48,100.00 328,912.74 225,000.00 160,000.00 5,593,012.74 474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 1,082,200.00
600,000.00 60,000.00 1,900,000.00 81,000.00 290,000.00 48,100.00 328,912.74 225,000.00 160,000.00 3,693,012.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
315,250.00 31,500.00 140,400.00 126,000.00 36,410.00 18,700.00 668,260.00 668,260.00
600,000.00 60,000.00 3,800,000.00 81,000.00 290,000.00 48,100.00 328,912.74 225,000.00 160,000.00 5,593,012.74
5,593,012.74
3,693,012.74
Jumlah Bahan+Tenaga (Rp) 6 405,000.00 30,000.00 1,900,000.00 54,000.00 403,750.00 48,100.00 328,912.74 3,169,762.74
600,000.00 60,000.00 5,700,000.00 81,000.00 403,750.00 48,100.00 328,912.74 225,000.00 160,000.00 7,606,762.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.50 1 M3 Membuat Kolom Beton Bertulang ( 100 Kg Besi + Bekisting ) a. Bahan 0.400 M3 Kayu Kls. IV 4.000 Kg Paku Biasa 2"- 5" 100.000 Kg Besi Beton Polos 4.500 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.150 M3 Kayu Balok Kls. IV 20.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 7.300 0.350 3.300 2.100 0.570 0.250
405,000.00 30,000.00 1,900,000.00 54,000.00 403,750.00 48,100.00 328,912.74 3,169,762.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
Jumlah 7.48 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting ) a. Bahan 0.400 M3 Kayu Kls. IV 4.000 Kg Paku Biasa 2"- 5" 300.000 Kg Besi Beton Polos 4.500 Kg Kawat Beton 323.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.150 M3 Kayu Balok Kls. IV 20.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 7.300 Oh Pekerja 0.350 Oh Tukang Batu 3.300 Oh Tukang Kayu 2.100 Oh Tukang Besi 0.570 Oh Kepala Tukang 0.250 Oh Mandor
b. Tenaga 7.300 0.350 3.300 2.100 0.570 0.250
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 6,675,212.74
600,000.00 60,000.00 1,900,000.00 81,000.00 290,000.00 48,100.00 328,912.74 225,000.00 160,000.00 3,693,012.74 474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 1,082,200.00
474,500.00 31,500.00 297,000.00 189,000.00 62,700.00 27,500.00 1,082,200.00 4,775,212.74
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
7.51 1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting ) a. Bahan 0.320 M3 Kayu Kls. IV 3.200 Kg Paku Biasa 2"- 5" 200.000 Kg Besi Beton Polos 3.000 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.140 M3 Kayu Balok Kls. IV 16.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 5.960 0.350 2.800 1.400 0.455 0.208
Oh Oh Oh Oh Oh Oh
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
7.52 1 M3 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting ) a. Bahan 0.320 M3 Kayu Kls. IV 3.200 Kg Paku Biasa 2"- 5" 150.000 Kg Besi Beton Polos 2.250 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.120 M3 Kayu Balok Kls. IV 32.000 Btg Kayu Gelam dia. 6-8 cm
Oh Oh Oh Oh Oh Oh
5,387,012.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
7.53 1 M3 Membuat Balok Beton Bertulang ( 100 Kg Besi + Bekisting ) a. Bahan 0.320 M3 Kayu Kls. IV 3.200 Kg Paku Biasa 2"- 5" 110.000 Kg Besi Beton Polos 2.250 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.120 M3 Kayu Balok Kls. IV 32.000 Btg Kayu Gelam dia. 6-8 cm
Oh Oh Oh Oh Oh Oh
4,521,512.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
Jumlah 7.54 1 M3 Membuat Dinding Beton Bertulang ( 150 Kg Besi + Bekisting ) a. Bahan 0.240 M3 Kayu Kls. IV 3.200 Kg Paku Biasa 2"- 5" 150.000 Kg Besi Beton Polos 2.250 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.160 M3 Kayu Balok Kls. IV 24.000 Btg Kayu Gelam dia. 6-8 cm
- 51 -
3,761,512.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
387,400.00 31,500.00 252,000.00 126,000.00 50,050.00 22,880.00 869,830.00 869,830.00
360,000.00 48,000.00 2,850,000.00 40,500.00 290,000.00 48,100.00 328,912.74 240,000.00 192,000.00 4,397,512.74
387,400.00 31,500.00 252,000.00 126,000.00 50,050.00 22,880.00 869,830.00 6,256,842.74
480,000.00 48,000.00 2,850,000.00 40,500.00 290,000.00 48,100.00 328,912.74 180,000.00 256,000.00 4,521,512.74 377,000.00 31,500.00 252,000.00 94,500.00 46,200.00 20,350.00 821,550.00 821,550.00
480,000.00 48,000.00 2,090,000.00 40,500.00 290,000.00 48,100.00 328,912.74 180,000.00 256,000.00 3,761,512.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
480,000.00 48,000.00 3,800,000.00 54,000.00 290,000.00 48,100.00 328,912.74 210,000.00 128,000.00 5,387,012.74
480,000.00 48,000.00 2,850,000.00 40,500.00 290,000.00 48,100.00 328,912.74 180,000.00 256,000.00 4,521,512.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 5.800 0.350 2.800 1.050 0.420 0.185
480,000.00 48,000.00 3,800,000.00 54,000.00 290,000.00 48,100.00 328,912.74 210,000.00 128,000.00 5,387,012.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 5.800 0.350 2.800 1.050 0.420 0.185
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
377,000.00 31,500.00 252,000.00 94,500.00 46,200.00 20,350.00 821,550.00 5,343,062.74
480,000.00 48,000.00 2,090,000.00 40,500.00 290,000.00 48,100.00 328,912.74 180,000.00 256,000.00 3,761,512.74 377,000.00 31,500.00 252,000.00 94,500.00 46,200.00 20,350.00 821,550.00
377,000.00 31,500.00 252,000.00 94,500.00 46,200.00 20,350.00 821,550.00
821,550.00
4,583,062.74
360,000.00 48,000.00 2,850,000.00 40,500.00 290,000.00 48,100.00 328,912.74 240,000.00 192,000.00 4,397,512.74
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 5.600 0.350 2.640 1.050 0.400 0.193
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.55 1 M3 Membuat 1/2 Dinding Beton Bertulang ( 100 Kg Besi + Bekisting) a. Bahan 0.120 M3 Kayu Kls. IV 3.200 Kg Paku Biasa 2"- 5" 100.000 Kg Besi Beton Polos 1.250 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton b. Tenaga 5.600 0.350 2.640 1.050 0.400 0.193
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
Oh Oh Oh Oh Oh Oh
4,397,512.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
2,817,512.74
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00 1,500,000.00 8,000.00
5,210,512.74
7.57 1 M' Membuat Kolom Penguat Beton Bertulang (11x11)cm + bekisting (kolom praktis) a. Bahan 0.002 M3 Kayu Kls. IV 1,500,000.00 0.010 Kg Paku Biasa 2"- 5" 15,000.00 3.000 Kg Besi Beton Polos 19,000.00 0.450 Kg Kawat Beton 18,000.00 4.000 Kg Semen Portland 1,250.00 3 0.006 M Pasir Beton 92,500.00 0.009 M3 Koral Beton 421,683.00 b. Tenaga 0.060 0.020 0.020 0.020 0.006 0.003
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Jumlah
7.58 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cm a. Bahan 0.003 M3 Kayu Kls. IV 0.020 Kg Paku Biasa 2"- 5" 3.600 Kg Besi Beton Polos 0.050 Kg Kawat Beton 5.500 Kg Semen Portland 0.009 M3 Pasir Beton 0.015 M3 Koral Beton
77,600.15
1,500,000.00 15,000.00 19,000.00 18,000.00 1,250.00 92,500.00 421,683.00
- 52 -
464,800.00 15,050.00 113,520.00 45,150.00 2,600.00 11,580.00 652,700.00 652,700.00
4,500.00 300.00 68,400.00 900.00 6,875.00 832.50 6,325.25 88,132.75
364,000.00 31,500.00 237,600.00 94,500.00 44,000.00 21,230.00 792,830.00 5,190,342.74
464,800.00 15,050.00 113,520.00 45,150.00 2,600.00 11,580.00 652,700.00 3,470,212.74
375,000.00 45,000.00 3,800,000.00 54,000.00 290,000.00 48,100.00 328,912.74 157,500.00 112,000.00 5,210,512.74 364,000.00 31,500.00 207,000.00 126,000.00 44,550.00 22,220.00 795,270.00 795,270.00
3,000.00 150.00 57,000.00 8,100.00 5,000.00 555.00 3,795.15 77,600.15
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
180,000.00 48,000.00 1,900,000.00 22,500.00 290,000.00 48,100.00 328,912.74 2,817,512.74
375,000.00 45,000.00 3,800,000.00 54,000.00 290,000.00 48,100.00 328,912.74 157,500.00 112,000.00 5,210,512.74
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
364,000.00 31,500.00 237,600.00 94,500.00 44,000.00 21,230.00 792,830.00 792,830.00
180,000.00 48,000.00 1,900,000.00 22,500.00 290,000.00 48,100.00 328,912.74 2,817,512.74
83,000.00 43,000.00 43,000.00 43,000.00 6,500.00 60,000.00
Jumlah 7.56 1 M3 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting ) a. Bahan 0.250 M3 Kayu Kls. IV 3.000 Kg Paku Biasa 2"- 5" 200.000 Kg Besi Beton Polos 3.000 Kg Kawat Beton 232.000 Kg Semen Portland 0.520 M3 Pasir Beton 0.780 M3 Koral Beton 0.105 M3 Kayu Balok Kls. IV 14.000 Btg Kayu Gelam dia. 6-8 cm b. Tenaga 5.600 0.350 2.300 1.400 0.405 0.202
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
364,000.00 31,500.00 207,000.00 126,000.00 44,550.00 22,220.00 795,270.00 6,005,782.74
3,000.00 150.00 57,000.00 8,100.00 5,000.00 555.00 3,795.15 77,600.15 3,900.00 1,800.00 1,800.00 1,800.00 660.00 330.00 10,290.00 10,290.00
3,900.00 1,800.00 1,800.00 1,800.00 660.00 330.00 10,290.00 87,890.15
4,500.00 300.00 68,400.00 900.00 6,875.00 832.50 6,325.25 88,132.75
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.100 0.033 0.033 0.033 0.010 0.005
Oh Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor
65,000.00 90,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
7.59 1 M2 Pasang Bekisting Untuk Lantai, plat dak dengan plywood 4 mm a. Bahan 0.040 M3 Kayu Kls. IV 0.400 Kg Paku Biasa 2"- 5" 0.015 M3 Balok Kayu Kls.IV 0.350 Lbr Plywood 4 mm 6.000 Btg Kayu Gelam dia. 6-8 cm
b. Tenaga 0.320 0.330 0.033 0.006
Oh Oh Oh Oh
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
Pekerja Tukang Batu Kepala Tukang Mandor
88,132.75
1,500,000.00 15,000.00 1,500,000.00 68,000.00 8,000.00
60,000.00 6,000.00 22,500.00 23,800.00 48,000.00 160,300.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
6,500.00 2,970.00 2,970.00 2,970.00 1,100.00 550.00 17,060.00 17,060.00
160,300.00
Oh Oh Oh Oh M3
Pekerja Tukang batu Kepala Tukang Mandor Concrete Pump
65,000.00 90,000.00 110,000.00 110,000.00 114,560.00 Jumlah
867,000.00
7.61 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai) a. Bahan 1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00 b. Tenaga 2.000 Oh Pekerja 65,000.00 0.167 Oh Tukang batu 90,000.00 0.002 Oh Kepala Tukang 110,000.00 0.050 Oh Mandor 110,000.00 Jumlah
867,000.00
6,500.00 2,970.00 2,970.00 2,970.00 1,100.00 550.00 17,060.00 105,192.75
60,000.00 6,000.00 22,500.00 23,800.00 48,000.00 160,300.00
20,800.00 29,700.00 3,630.00 660.00 54,790.00
20,800.00 29,700.00 3,630.00 660.00 54,790.00
54,790.00
215,090.00
7.60 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai) a. Bahan 1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00 b. Tenaga 2.000 0.167 0.002 0.050 0.167
Jumlah Bahan+Tenaga (Rp) 6
867,000.00 867,000.00
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 169,780.09
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 1,036,780.09
867,000.00 867,000.00 130,000.00 15,003.00 183.37 5,500.00 150,686.37 150,686.37
7.62 1 M Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai) a. Bahan 1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00
130,000.00 15,003.00 183.37 5,500.00 150,686.37 1,017,686.37
3
b. Tenaga 2.000 0.167 0.002 0.050 0.167
Oh Oh Oh Oh M3
Pekerja Tukang batu Kepala Tukang Mandor Concrete Pump
65,000.00 90,000.00 110,000.00 110,000.00 114,560.00 Jumlah
918,000.00
7.63 1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai) a. Bahan 1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00 b. Tenaga 2.000 Oh Pekerja 65,000.00 0.167 Oh Tukang batu 90,000.00 0.002 Oh Kepala Tukang 110,000.00 0.050 Oh Mandor 110,000.00
Jumlah
- 53 -
918,000.00
918,000.00 918,000.00
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 169,780.09
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 1,087,780.09
918,000.00 918,000.00 130,000.00 15,003.00 183.37 5,500.00 150,686.37
130,000.00 15,003.00 183.37 5,500.00 150,686.37
150,686.37
1,068,686.37
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I SATUAN HARGA Harga Jumlah Harga Jumlah URAIAN Satuan Bahan Tenaga Analisa (Rp) (Rp) (Rp) 1 2 3 4 5 7.64 1 M3 Beton Ready Mix K-275 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai) a. Bahan 1.020 M3 Beton Ready Mix K-275 1,000,000.00 1,020,000.00 1,020,000.00 NO.
b. Tenaga 2.000 0.167 0.002 0.050 0.167
Oh Oh Oh Oh M3
Pekerja Tukang batu Kepala Tukang Mandor Concrete Pump
65,000.00 90,000.00 110,000.00 110,000.00 114,560.00 Jumlah
VIII
1,020,000.00
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 169,780.09
Jumlah Bahan+Tenaga (Rp) 6
1,020,000.00 1,020,000.00
130,000.00 15,003.00 183.37 5,500.00 19,093.72 169,780.09 1,189,780.09
PEKERJAAN PENUTUP ATAP
8.1 1 M2 Pasang Atap Genteng Kodok a. Bahan 25.000 Bh Genteng Kodok
b. Tenaga 0.150 0.075 0.008 0.008
Oh Oh Oh Oh
1,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
8.2 1 M2 Pasang Atap Genteng keramik biasa bergalzur a. Bahan 18.000 Bh Genteng Keramik biasa/lokal
b. Tenaga 0.150 0.075 0.008 0.008
Oh Oh Oh Oh
25,000.00
8,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.3 1 M2 Pasang Atap Genteng keramik KIA Natural / sejenis a. Bahan 15.000 Bh Genteng Keramik KIA Natural atau sejenis
Oh Oh Oh Oh
144,000.00
12,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.4 1 M2 Pasang Atap Genteng keramik KIA Berwarna / sejenis a. Bahan 15.000 Bh Genteng Keramik KIA Warna atau sejenis b. Tenaga 0.150 0.075 0.008 0.008
Oh Oh Oh Oh
180,000.00
17,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.5 1 M' Pasang Bubung Genteng Kodok a. Bahan 5.000 Bh Genteng Bubung Kodok 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang b. Tenaga 0.400 0.200 0.020 0.002
Oh Oh Oh Oh
255,000.00
4,000.00 1,250.00 92,500.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
- 54 -
9,750.00 6,750.00 880.00 880.00 18,260.00
9,750.00 6,750.00 880.00 880.00 18,260.00
18,260.00
162,260.00
180,000.00 180,000.00 9,750.00 6,750.00 880.00 880.00 18,260.00 18,260.00
32,960.00
9,750.00 6,750.00 880.00 880.00 18,260.00 198,260.00
255,000.00 255,000.00 9,750.00 6,750.00 880.00 880.00 18,260.00 18,260.00
20,000.00 10,000.00 2,960.00 32,960.00
65,000.00 90,000.00 110,000.00 110,000.00
9,750.00 6,750.00 880.00 880.00 18,260.00 43,260.00
144,000.00 144,000.00
255,000.00 255,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
9,750.00 6,750.00 880.00 880.00 18,260.00 18,260.00
180,000.00 180,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
25,000.00 25,000.00
144,000.00 144,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.150 0.075 0.008 0.008
25,000.00 25,000.00
9,750.00 6,750.00 880.00 880.00 18,260.00 273,260.00
20,000.00 10,000.00 2,960.00 32,960.00 26,000.00 18,000.00 2,200.00 220.00 46,420.00
26,000.00 18,000.00 2,200.00 220.00 46,420.00
46,420.00
79,380.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
URAIAN
Analisa 1
Harga Satuan (Rp) 3
2 8.6 1 M' Pasang Bubung Genteng Keramik biasa berglazzur a. Bahan 4.000 Bh Genteng Bubung Keramik lokal 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang
b. Tenaga 0.400 0.200 0.020 0.002
Oh Oh Oh Oh
10,000.00 1,250.00 92,500.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.7 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenis a. Bahan 3.000 Bh Genteng Bubung Keramik KIA Natural atau sejenis 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang
Oh Oh Oh Oh
52,960.00
20,000.00 1,250.00 92,500.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.8 1 M' Pasang Bubung Genteng Keramik KIA Warna atau sejenis a. Bahan 3.000 Bh Genteng Bubung Keramik KIA Warna atau sejenis 8.000 Kg Semen Portland 0.032 M3 Pasir Pasang
Oh Oh Oh Oh
72,960.00
25,000.00 1,250.00 92,500.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah 8.9 1 M Pasang Roof Light Fibreglass Polycarbon a. Bahan 1.000 M2 Fiber warna Polycarbon 0.050 Kg Paku Biasa 1/2" - 1"
26,000.00 18,000.00 2,200.00 220.00 46,420.00 46,420.00
87,960.00
26,000.00 18,000.00 2,200.00 220.00 46,420.00 99,380.00
60,000.00 10,000.00 2,960.00 72,960.00
26,000.00 18,000.00 2,200.00 220.00 46,420.00 46,420.00
75,000.00 10,000.00 2,960.00 87,960.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
40,000.00 10,000.00 2,960.00 52,960.00
60,000.00 10,000.00 2,960.00 72,960.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.400 0.200 0.020 0.002
40,000.00 10,000.00 2,960.00 52,960.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.400 0.200 0.020 0.002
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
26,000.00 18,000.00 2,200.00 220.00 46,420.00 119,380.00
75,000.00 10,000.00 2,960.00 87,960.00
26,000.00 18,000.00 2,200.00 220.00 46,420.00
26,000.00 18,000.00 2,200.00 220.00 46,420.00
46,420.00
134,380.00
2
b. Tenaga 0.140 0.067 0.007 0.007
Oh Oh Oh Oh
80,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
80,000.00 900.00 80,900.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 8.10 1 M Pasang Atap Asbes Gelombang kecil lbr 0,8 tbl 4 mm a. Bahan 1.100 M2 Asbes Gelombang kecil lebar 80 cm 0.120 Kg Paku Pancing
80,900.00
80,000.00 900.00 80,900.00
9,100.00 6,030.00 770.00 770.00 16,670.00
9,100.00 6,030.00 770.00 770.00 16,670.00
16,670.00
97,570.00
2
b. Tenaga 0.140 0.067 0.007 0.007
Oh Oh Oh Oh
25,000.00 22,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
27,500.00 2,640.00 30,140.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
8.11 1 M2 Pasang Atap Asbes Gelombang kecil lbr 1,05 tbl 4 mm a. Bahan 1.100 M2 Asbes Gelombang kecil lebar 105 cm 0.120 Kg Paku Pancing
30,140.00
32,000.00 22,000.00
- 55 -
35,200.00 2,640.00 37,840.00
27,500.00 2,640.00 30,140.00
9,100.00 6,030.00 770.00 770.00 16,670.00 16,670.00
9,100.00 6,030.00 770.00 770.00 16,670.00 46,810.00
35,200.00 2,640.00 37,840.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.140 0.067 0.007 0.007
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 8.12 1 M2 Pasang Atap Onduline a. Bahan 1.100 M2 Onduline gel. 75 X 200 cm 0.120 Kg Paku Pancing
b. Tenaga 0.140 0.067 0.007 0.007
Oh Oh Oh Oh
37,840.00
58,500.00 22,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.13 1 M2 Pasang Atap Asbes Gelombang besar lbr 1,05 tbl 4 mm a. Bahan 1.100 M2 Asbes Gelombang besar lebar 105 cm 0.120 Kg Paku Pancing
Oh Oh Oh Oh
66,990.00
35,000.00 22,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
8.14 1 M' Pasang Bubung/nok Asbes Gelombang kecil a. Bahan 1.100 M' Bubung Asbes Gelombang Kecil 6.000 Bh Paku Asbes
b. Tenaga 0.084 0.125 0.013 0.004
Oh Oh Oh Oh
41,140.00
23,500.00 600.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.15 1 M' Pasang Bubung/Nok Asbes Gelombang besar a. Bahan 1.100 M' Bubung Asbes Gelombang Besar 6.000 Bh Paku Asbes
b. Tenaga 0.084 0.125 0.013 0.004
Oh Oh Oh Oh
29,450.00
24,000.00 600.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.16 1 M2 Pasang Atap Beton Cisangkan a. Bahan 17.000 Bh Genteng Beton Cisangkan 0.030 Kg Paku Biasa 2" - 5"
b. Tenaga 0.200 0.100 0.010 0.010
Oh Oh Oh Oh
30,000.00
7,500.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 56 -
64,350.00 2,640.00 66,990.00
9,100.00 6,030.00 770.00 770.00 16,670.00
9,100.00 6,030.00 770.00 770.00 16,670.00
16,670.00
83,660.00
38,500.00 2,640.00 41,140.00
9,100.00 6,030.00 770.00 770.00 16,670.00 16,670.00
127,950.00
9,100.00 6,030.00 770.00 770.00 16,670.00 57,810.00
25,850.00 3,600.00 29,450.00
5,460.00 11,250.00 1,430.00 440.00 18,580.00 18,580.00
5,460.00 11,250.00 1,430.00 440.00 18,580.00 48,030.00
26,400.00 3,600.00 30,000.00
5,460.00 11,250.00 1,430.00 440.00 18,580.00 18,580.00
127,500.00 450.00 127,950.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
54,510.00
26,400.00 3,600.00 30,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
16,670.00
25,850.00 3,600.00 29,450.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
9,100.00 6,030.00 770.00 770.00 16,670.00
38,500.00 2,640.00 41,140.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
9,100.00 6,030.00 770.00 770.00 16,670.00
64,350.00 2,640.00 66,990.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.140 0.067 0.007 0.007
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
5,460.00 11,250.00 1,430.00 440.00 18,580.00 48,580.00
127,500.00 450.00 127,950.00
13,000.00 9,000.00 1,100.00 1,100.00 24,200.00
13,000.00 9,000.00 1,100.00 1,100.00 24,200.00
24,200.00
152,150.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 8.17 1 M2 Pasang Atap Genteng Beton a. Bahan 11.000 Bh Genteng Beton 0.030 Kg Paku Biasa 2" - 5" b. Tenaga 0.200 0.100 0.010 0.010
Oh Oh Oh Oh
5,700.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.18 1 M2 Pasang Atap Genteng Metal biasa (77 cm X 88 cm) a. Bahan 1.020 M2 Genteng Metal 0.200 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
63,150.00
32,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.19 1 M2 Pasang Atap Genteng Metal Zincalume a. Bahan 1.020 M2 Genteng Metal 0.200 Kg Paku Biasa 2" - 5"
Oh Oh Oh Oh
35,640.00
160,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
8.20 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu A a. Bahan 1.020 M2 Genteng Metal Zincalume berpasir 0.200 Kg Paku Biasa 2" - 5" b. Tenaga 0.200 0.100 0.010 0.001
Oh Oh Oh Oh
166,200.00
85,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.21 1 M Pasang Atap Genteng Metal Warna a. Bahan 1.020 M2 Genteng Metal warna 0.200 Kg Paku Biasa 2" - 5"
89,700.00
13,000.00 9,000.00 1,100.00 1,100.00 24,200.00 87,350.00
32,640.00 3,000.00 35,640.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 23,210.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 58,850.00
163,200.00 3,000.00 166,200.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 23,210.00
86,700.00 3,000.00 89,700.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13,000.00 9,000.00 1,100.00 1,100.00 24,200.00 24,200.00
163,200.00 3,000.00 166,200.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
62,700.00 450.00 63,150.00
32,640.00 3,000.00 35,640.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.100 0.010 0.001
62,700.00 450.00 63,150.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.200 0.100 0.010 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
13,000.00 9,000.00 1,100.00 110.00 23,210.00 189,410.00
86,700.00 3,000.00 89,700.00 13,000.00 9,000.00 1,100.00 110.00 23,210.00 23,210.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 112,910.00
2
b. Tenaga 0.200 0.100 0.010 0.001
Oh Oh Oh Oh
40,000.00 15,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 8.22 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu B a. Bahan 1.020 M2 Genteng Metal Zincalume berpasir kualitas biasa 0.200 Kg Paku Biasa 2" - 5" b. Tenaga 0.200 0.100 0.010 0.001
Oh Oh Oh Oh
40,800.00 3,000.00 43,800.00
Pekerja Tukang Kayu Kepala Tukang Mandor
43,800.00
- 57 -
13,000.00 9,000.00 1,100.00 110.00 23,210.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00
23,210.00
67,010.00
60,000.00
61,200.00
61,200.00
15,000.00
3,000.00 64,200.00
3,000.00 64,200.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
40,800.00 3,000.00 43,800.00
64,200.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 23,210.00
13,000.00 9,000.00 1,100.00 110.00 23,210.00 87,410.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 8.23 1 M' Pasang Nok Genteng Beton a. Bahan 3.500 Bh Nok Genteng Beton 0.050 Kg Paku Biasa 2" - 5" 10.800 Kg Semen Abu-abu 0.032 M3 Pasir Pasang 1.000 Kg Semen Warna b. Tenaga 0.400 0.200 0.020 0.020
Oh Oh Oh Oh
6,000.00 15,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.24 1 M' Pasang Nok Genteng Beton Cisangkan a. Bahan 5.000 Bh Nok Genteng Beton 0.050 Kg Paku Biasa 2" - 5" 10.800 Kg Semen Abu-abu 0.032 M3 Pasir Pasang 1.000 Kg Semen Warna
Oh Oh Oh Oh
21,000.00 750.00 13,500.00 2,960.00 12,000.00 50,210.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.400 0.200 0.020 0.020
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
50,210.00
6,100.00 15,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
8.25 1 M Pasang Nok Genteng Metal a. Bahan 1.100 Bh Nok Genteng Metal 0.050 Kg Paku Biasa 1/2" - 1"
21,000.00 750.00 13,500.00 2,960.00 12,000.00 50,210.00 26,000.00 18,000.00 2,200.00 2,200.00 48,400.00 48,400.00
30,500.00 750.00 13,500.00 2,960.00 12,000.00 59,710.00
65,000.00 90,000.00 110,000.00 110,000.00 59,710.00
Jumlah Bahan+Tenaga (Rp) 6
26,000.00 18,000.00 2,200.00 2,200.00 48,400.00 98,610.00
30,500.00 750.00 13,500.00 2,960.00 12,000.00 59,710.00
26,000.00 18,000.00 2,200.00 2,200.00 48,400.00 48,400.00
26,000.00 18,000.00 2,200.00 2,200.00 48,400.00 108,110.00
'
b. Tenaga 0.250 0.150 0.015 0.013
Oh Oh Oh Oh
30,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
8.26 1 M2 Pasang Atap Seng Gelombang a. Bahan 1.020 M2 Seng Gelombang BJLS 0.020 Kg Paku Biasa 1/2" - 1"
b. Tenaga 0.120 0.060 0.006 0.006
Oh Oh Oh Oh
33,900.00
7,425.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8.27 1 M' Pasang Atap Nok Seng a. Bahan 1.000 M' Seng Plat BJLS 33 cm X 100 cm 0.040 Kg Paku Biasa 1/2" - 1"
Oh Oh Oh Oh
7,933.50
13,200.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
13,920.00
100,000.00 45,000.00
- 58 -
16,250.00 13,500.00 1,650.00 1,430.00 32,830.00 32,830.00
105,000.00 900.00 105,900.00
16,250.00 13,500.00 1,650.00 1,430.00 32,830.00 66,730.00
7,573.50 360.00 7,933.50
7,800.00 5,400.00 660.00 660.00 14,520.00
7,800.00 5,400.00 660.00 660.00 14,520.00
14,520.00
22,453.50
13,200.00 720.00 13,920.00
65,000.00 90,000.00 110,000.00 110,000.00
8.28 1 M2 Pasang Atap Aluminium a. Bahan 1.050 M2 Atap Alluminium Gelombang Tebal 0,5 0.020 Kg Paku Hak Panjang 15 cm
33,000.00 900.00 33,900.00
7,573.50 360.00 7,933.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.150 0.070 0.008 0.006
33,000.00 900.00 33,900.00
13,200.00 720.00 13,920.00
9,750.00 6,300.00 880.00 660.00 17,590.00
9,750.00 6,300.00 880.00 660.00 17,590.00
17,590.00
31,510.00
105,000.00 900.00 105,900.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.150 0.750 0.008 0.006
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
8.29 1 M' Pasang Nok Aluminium a. Bahan 1.200 M' Nok Standar 0.040 Kg Paku Hak Panjang 15 cm
b. Tenaga 0.100 1.000 0.010 0.010
Oh Oh Oh Oh
105,900.00
30,000.00 45,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8,30 1 M2 Pasang Aluminium Foil / Sisalation a. Bahan 1.050 M2 Sisalation / Alluminium Foil
Oh Oh Oh Oh
37,800.00
18,500.00
Pekerja Tukang Kayu Kepala Tukang Mandor
8,31 1 M Gording, Sako, Kitau, Blandar kayu Kelas II (F1) a. Bahan 1.100 M3 Kayu Kelas II 0.250 Kg Paku
19,425.00
Jumlah Bahan+Tenaga (Rp) 6
9,750.00 67,500.00 880.00 660.00 78,790.00 184,690.00
36,000.00 1,800.00 37,800.00
6,500.00 90,000.00 1,100.00 1,100.00 98,700.00 98,700.00
19,425.00 19,425.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
9,750.00 67,500.00 880.00 660.00 78,790.00 78,790.00
36,000.00 1,800.00 37,800.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.150 0.050 0.005 0.008
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
6,500.00 90,000.00 1,100.00 1,100.00 98,700.00 136,500.00
19,425.00 19,425.00 9,750.00 4,500.00 550.00 880.00 15,680.00 15,680.00
9,750.00 4,500.00 550.00 880.00 15,680.00 35,105.00
3
b. Tenaga 15.000 1.500 0.100 0.250
Oh Oh Oh Oh
6,500,000.00 15,000.00
Tukang Kepala Tukang Pekerja Mandor
90,000.00 110,000.00 65,000.00 110,000.00
Jumlah 8,32 1 M3 Gording, Sako, Kitau, Blandar kayu Kelas III (F1) a. Bahan 1.100 M3 Kayu Kelas III 0.250 Kg Paku b. Tenaga 15.000 1.500 0.100 0.250
Oh Oh Oh Oh
7,153,750.00
3,300,000.00 15,000.00
Tukang Kepala Tukang Pekerja Mandor
#VALUE! 1 M2 Rangka Atap baja Ringan "GigaSteel" a. Bahan 2.100 M' - Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) 1.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 6.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 30.000 Bh - Screw / Dynabolt 0.030 M' - Valery Gutter Talang Jurai 0.700 M' - Strap Bracing 1.100 M2 - Alunium Foil Model Karung
Oh Oh Oh Oh
Tukang Terampil Tukang biasa Kepala Tukang Mandor
3,633,750.00
22,500.00 18,800.00 16,300.00 1,900.00 125,400.00 12,500.00 18,500.00
- 59 -
1,350,000.00 165,000.00 6,500.00 27,500.00 1,549,000.00
1,350,000.00 165,000.00 6,500.00 27,500.00 1,549,000.00
1,549,000.00
8,702,750.00
3,630,000.00 3,750.00 3,633,750.00 1,350,000.00 165,000.00 6,500.00 27,500.00 1,549,000.00 1,549,000.00
47,250.00 22,560.00 101,060.00 57,000.00 3,762.00 8,750.00 20,350.00 260,732.00
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
7,150,000.00 3,750.00 7,153,750.00
3,630,000.00 3,750.00 3,633,750.00
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
b. Tenaga 0.100 0.100 0.050 0.010
7,150,000.00 3,750.00 7,153,750.00
260,732.00
1,350,000.00 165,000.00 6,500.00 27,500.00 1,549,000.00 5,182,750.00
47,250.00 22,560.00 101,060.00 57,000.00 3,762.00 8,750.00 20,350.00 260,732.00 9,000.00 6,500.00 5,500.00 1,100.00 22,100.00
9,000.00 6,500.00 5,500.00 1,100.00 22,100.00
22,100.00
282,832.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
URAIAN
Analisa 1 IX
Harga Satuan (Rp) 3
2 PEKERJAAN LANGIT-LANGIT 9.1 1 M2 Langit-langit Asbes/Eternit ( 1,00 x 1,00 ) m, Tebal 2,7 mm a. Bahan 1.100 Lbr Asbes/Eternit Tebal 2,7 mm 0.010 Kg Paku b. Tenaga 0.030 0.070 0.007 0.002
Oh Oh Oh Oh
23,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.2 1 M2 Langit-langit Asbes / Eternit ( 1,00 x 1,00 ) m, Tebal 3,5 mm a. Bahan 1.100 Lbr Asbes / Eternit Tebal 3,5 mm 0.010 Kg Paku
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
25,480.00
27,000.00 18,000.00
9.3 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 3,5 mm a. Bahan 0.360 Kpg Kalsiboard Tebal 3,5 mm 0.010 Kg Paku
Oh Oh Oh Oh
29,880.00
55,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
9.4 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 4,5 mm a. Bahan 0.360 Kpg Kalsiboard Tebal 4,5 mm 0.010 Kg Paku
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
19,980.00
58,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.5 1 M Langit-langit Asbes/Eternit, Rangka Kayu Kls. II a. Bahan 0.012 M3 Kayu Kls. II, Balok 0.060 Kg Paku Biasa 1.100 M2 Asbes / Eternit tebal 2,7 mm 1.100 M2 Asbes / Eternit tebal 3,5 mm
21,060.00
1,950.00 6,300.00 770.00 165.00 9,185.00 34,665.00
29,700.00 180.00 29,880.00 1,950.00 6,300.00 770.00 165.00 9,185.00 9,185.00
1,950.00 6,300.00 770.00 165.00 9,185.00 39,065.00
19,800.00 180.00 19,980.00 4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
20,880.00 180.00 21,060.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
1,950.00 6,300.00 770.00 165.00 9,185.00 9,185.00
19,800.00 180.00 19,980.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
25,300.00 180.00 25,480.00
29,700.00 180.00 29,880.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.070 0.100 0.010 0.004
25,300.00 180.00 25,480.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.030 0.070 0.007 0.002
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
4,550.00 9,000.00 1,100.00 385.00 15,035.00 35,015.00
20,880.00 180.00 21,060.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 36,095.00
2
6,500,000.00 15,000.00 23,000.00 27,000.00 Tebal 2,7 mm Tebal 3,5 mm
b. Tenaga 0.180 0.320 0.032 0.009
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
78,000.00 900.00 25,300.00 29,700.00 104,200.00 108,600.00
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Eternit tebal 2,7 mm, rangka kayu kls. II 1 M2 Eternit tebal 3,5 mm, rangka kayu kls. II
104,200.00 108,600.00
9.6 1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. III a. Bahan 0.012 M3 Kayu Kls. III, Balok 0.060 Kg Paku Biasa 1.100 M2 Asbes / Eternit tebal 2,7 mm 1.100 M2 Asbes / Eternit tebal 3,5 mm
3,300,000.00 15,000.00 23,000.00 27,000.00 Tebal 2,7 mm Tebal 3,5 mm
- 60 -
39,600.00 900.00 25,300.00 29,700.00 65,800.00 70,200.00
78,000.00 900.00 25,300.00 29,700.00 104,200.00 108,600.00 11,700.00 28,800.00 3,520.00 990.00 45,010.00
11,700.00 28,800.00 3,520.00 990.00 45,010.00
45,010.00 45,010.00
149,210.00 153,610.00
39,600.00 900.00 25,300.00 29,700.00 65,800.00 70,200.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.180 0.320 0.032 0.009
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Eternit tebal 2,7 mm, rangka kayu kls. III 1 M2 Eternit tebal 3,5 mm, rangka kayu kls. III
65,800.00 70,200.00
9.7 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. II a. Bahan 0.012 M3 Kayu Kls. II, Balok 0.060 Kg Paku Biasa 0.360 Kpg Kalsiboard tebal 3,5 mm 0.360 Kpg Kalsiboard tebal 4,5 mm
6,500,000.00 15,000.00 55,000.00 58,000.00 Tebal 3,5 mm Tebal 4,5 mm
b. Tenaga 0.270 0.400 0.040 0.014
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
98,700.00 99,780.00
9.8 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. III a. Bahan 0.012 M3 Kayu Kls. III, Balok 0.060 Kg Paku Biasa 0.360 Kpg Kalsiboard tebal 3,5 mm 0.360 Kpg Kalsiboard tebal 4,5 mm
3,300,000.00 15,000.00 55,000.00 58,000.00 Tebal 3,5 mm Tebal 4,5 mm
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. III 1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. III
60,300.00 61,380.00
9.9 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 3 mm a. Bahan 0.360 Lbr Plywood 4' x 8' x 3 mm 0.030 Kg Paku
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
42,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.10 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 4 mm a. Bahan 0.360 Lbr Plywood 4' x 8' x 4 mm 0.030 Kg Paku
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
15,660.00
68,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.11 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 6 mm a. Bahan 0.360 Lbr Plywood 4' x 8' x 6 mm 0.030 Kg Paku
25,020.00
88,000.00 18,000.00
- 61 -
110,810.00 115,210.00
78,000.00 900.00 19,800.00 20,880.00 98,700.00 99,780.00 17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
59,435.00 59,435.00
158,135.00 159,215.00
39,600.00 900.00 19,800.00 20,880.00 60,300.00 61,380.00 17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
59,435.00 59,435.00
119,735.00 120,815.00
15,120.00 540.00 15,660.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
24,480.00 540.00 25,020.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
45,010.00 45,010.00
15,120.00 540.00 15,660.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
11,700.00 28,800.00 3,520.00 990.00 45,010.00
39,600.00 900.00 19,800.00 20,880.00 60,300.00 61,380.00
65,000.00 90,000.00 110,000.00 110,000.00
31,680.00 540.00 32,220.00
Jumlah Bahan+Tenaga (Rp) 6
11,700.00 28,800.00 3,520.00 990.00 45,010.00
78,000.00 900.00 19,800.00 20,880.00 98,700.00 99,780.00
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. II 1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. II
b. Tenaga 0.270 0.400 0.040 0.014
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
4,550.00 9,000.00 1,100.00 385.00 15,035.00 30,695.00
24,480.00 540.00 25,020.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 40,055.00
31,680.00 540.00 32,220.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 9.12 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 9 mm a. Bahan 0.360 Lbr Plywood 4' x 8' x 9 mm 0.030 Kg Paku b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
32,220.00
125,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
9.13 1 M Langit-langit Plywood ( 120 x 240 ) cm, Tebal 12 mm a. Bahan 0.360 Lbr Plywood 4' x 8' x 12 mm 0.030 Kg Paku
4,550.00 9,000.00 1,100.00 385.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00
15,035.00
47,255.00
45,000.00 540.00 45,540.00
65,000.00 90,000.00 110,000.00 110,000.00 45,540.00
Jumlah Bahan+Tenaga (Rp) 6
45,000.00 540.00 45,540.00 4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 60,575.00
2
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
160,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
57,600.00 540.00 58,140.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 9.14 1 M Langit-langit Teakwood (120 X 240), Tebal 3 mm a. Bahan 1.000 M2 Teakwood 4' x 8' x 3 mm 0.030 Kg Paku
58,140.00
57,600.00 540.00 58,140.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00
15,035.00
73,175.00
2
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
36,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
9.15 1 M2 Langit-langit Teakwood ( 120 x 240 ) cm, Tebal 4 mm a. Bahan 1.000 M2 Teakwood 4' x 8' x 4 mm 0.030 Kg Paku
b. Tenaga 0.070 0.100 0.010 0.004
Oh Oh Oh Oh
36,000.00 540.00 36,540.00
36,540.00
40,000.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.16 1 M2 Langit-langit Plywood + Rangka Kayu Kls. II a. Bahan 0.012 M3 Kayu Kls.II, Balok 0.060 Kg Paku Biasa 2" - 5" 0.360 Lbr Plywood 4' x 8' x 3 mm 0.360 Lbr Plywood 4' x 8' x 4 mm 0.360 Lbr Plywood 4' x 8' x 6 mm 0.360 Lbr Plywood 4' x 8' x 9 mm 0.360 Lbr Plywood 4' x 8' x 12 mm
40,540.00
6,500,000.00 15,000.00 42,000.00 68,000.00 88,000.00 125,000.00 160,000.00 Tebal 3 Tebal 4 Tebal 6 Tebal 9 Tebal 12
- 62 -
mm mm mm mm mm
4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
40,000.00 540.00 40,540.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
36,000.00 540.00 36,540.00
78,000.00 900.00 15,120.00 24,480.00 31,680.00 45,000.00 57,600.00 94,020.00 103,380.00 110,580.00 123,900.00 136,500.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 51,575.00
40,000.00 540.00 40,540.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 15,035.00
4,550.00 9,000.00 1,100.00 385.00 15,035.00 55,575.00
78,000.00 900.00 15,120.00 24,480.00 31,680.00 45,000.00 57,600.00 94,020.00 103,380.00 110,580.00 123,900.00 136,500.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.270 0.400 0.040 0.014
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Plywood tebal 3 mm, rangka kayu kls. II 1 M2 Plywood tebal 4 mm, rangka kayu kls. II 1 M2 Plywood tebal 6 mm, rangka kayu kls. II 1 M2 Plywood tebal 9 mm, rangka kayu kls. II 1 M2 Plywood tebal 12 mm, rangka kayu kls. II
94,020.00 103,380.00 110,580.00 123,900.00 136,500.00
9.17 1 M2 Langit-langit Plywood + Rangka Kayu Kls. III a. Bahan 0.012 M3 Kayu Kls.III, Balok 0.060 Kg Paku Biasa 2" - 5" 0.360 Lbr Plywood 4' x 8' x 3 mm 0.360 Lbr Plywood 4' x 8' x 4 mm 0.360 Lbr Plywood 4' x 8' x 6 mm 0.360 Lbr Plywood 4' x 8' x 9 mm 0.360 Lbr Plywood 4' x 8' x 12 mm
3,300,000.00 15,000.00 42,000.00 68,000.00 88,000.00 125,000.00 160,000.00 Tebal 3 Tebal 4 Tebal 6 Tebal 9 Tebal 12
b. Tenaga 0.270 0.400 0.040 0.014
Oh Oh Oh Oh
mm mm mm mm mm
Pekerja Tukang Kayu Kepala Tukang Mandor
55,620.00 64,980.00 72,180.00 85,500.00 98,100.00
9.18 1 M2 Langit-langit Lat Kayu Jati a. Bahan 0.024 M3 Kayu Jati, Papan 0.010 Kg Paku 0.050 Kg Paku Sekrup
Oh Oh Oh Oh
8,250,000.00 15,000.00 45,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
9.19 1 M2 Langit-langit Soft Board a. Bahan 0.350 Lbr Soft Board 4' x 8' x 4 mm 0.030 Kg Paku Biasa b. Tenaga 0.600 0.100 0.010 0.003
Oh Oh Oh Oh
198,150.00
67,500.00 18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.20 1 M' List Langit-langit Gypsum a. Bahan 1.100 M' List Gypsum Besar 1.100 M' List Gypsum Kecil 0.010 Kg Paku Gypsum
23,625.00
22,000.00 12,000.00 25,000.00 List Gypsum besar List Gypsum kecil
b. Tenaga 0.050 0.050 0.005 0.003
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
- 63 -
153,455.00 162,815.00 170,015.00 183,335.00 195,935.00
39,600.00 900.00 15,120.00 24,480.00 31,680.00 45,000.00 57,600.00 55,620.00 64,980.00 72,180.00 85,500.00 98,100.00 17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
59,435.00 59,435.00 59,435.00 59,435.00 59,435.00
115,055.00 124,415.00 131,615.00 144,935.00 157,535.00
198,000.00 150.00 2,250.00 198,150.00
13,000.00 54,000.00 6,600.00 1,100.00 74,700.00 74,700.00
24,450.00 13,450.00
13,000.00 54,000.00 6,600.00 1,100.00 74,700.00 272,850.00
23,625.00 540.00 23,625.00 39,000.00 9,000.00 1,100.00 330.00 49,430.00 49,430.00
24,200.00 13,200.00 250.00 24,450.00 13,450.00
65,000.00 90,000.00 110,000.00 110,000.00 List Gypsum Besar List Gypsum Kecil
59,435.00 59,435.00 59,435.00 59,435.00 59,435.00
23,625.00 540.00 23,625.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
198,000.00 150.00 2,250.00 198,150.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
17,550.00 36,000.00 4,400.00 1,485.00 59,435.00
39,600.00 900.00 15,120.00 24,480.00 31,680.00 45,000.00 57,600.00 55,620.00 64,980.00 72,180.00 85,500.00 98,100.00
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Plywood tebal 3 mm, rangka kayu kls. III 1 M2 Plywood tebal 4 mm, rangka kayu kls. III 1 M2 Plywood tebal 6 mm, rangka kayu kls. III 1 M2 Plywood tebal 9 mm, rangka kayu kls. III 1 M2 Plywood tebal 12 mm, rangka kayu kls. III
b. Tenaga 0.200 0.600 0.060 0.010
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
39,000.00 9,000.00 1,100.00 330.00 49,430.00 73,055.00
24,200.00 13,200.00 250.00 24,450.00 13,450.00 3,250.00 4,500.00 550.00 330.00 8,630.00 8,630.00 8,630.00
3,250.00 4,500.00 550.00 330.00 8,630.00 33,080.00 22,080.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 9.21 1 M2 Langit-langit Gypsum Board, Tebal 9 mm a. Bahan 0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm 0.300 Kg Cornes 0.025 roll Textile Tape 0.110 Kg Paku Sekrup 0.060 Kg Paku Biasa 2" - 5" 0.040 Kg Paku Gypsum
b. Tenaga 0.100 0.050 0.005 0.005
Oh Oh Oh Oh
63,000.00 7,000.00 6,850.00 45,000.00 15,000.00 25,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
9.22 1 M2 Langit-langit Gypsum Board 9 mm + Rangka Kayu a. Bahan 0.012 M3 Kayu Kls.III, Balok 0.012 M3 Kayu Kls.II, Balok 0.300 Kg Cornes 0.025 roll Textile Tape 0.110 Kg Paku Sekrup 0.060 Kg Paku Biasa 2" - 5" 0.040 Kg Paku Gypsum 0.364 Lbr Gypsum Board x 9 mm
32,053.25
3,300,000.00 6,500,000.00 7,000.00 6,850.00 45,000.00 15,000.00 25,000.00 63,000.00 Kayu Kls.II, Balok Kayu Kls.III, Balok
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
71,653.25 110,053.25
9.23 1 M2 Langit-langit Gypsum Board 9 mm + Rangka besi hollow a. Bahan 2.500 Btg Besi hollow galvanis 2/4 0.300 Kg Cornes 0.025 roll Textile Tape 0.110 Kg Paku Sekrup 0.060 Kg Paku Biasa 2" - 5" 0.040 Kg Paku Gypsum 0.364 Lbr Gypsum Board x 9 mm
Oh Oh Oh Oh
25,000.00 7,000.00 6,850.00 45,000.00 15,000.00 25,000.00 63,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
1 M2 Gypsum Board 9 mm, rangka besi hollow 2/4 galvanis X
30,153.25
6,500.00 4,500.00 550.00 550.00 12,100.00 12,100.00
94,553.25
6,500.00 4,500.00 550.00 550.00 12,100.00 44,153.25
39,600.00 78,000.00 2,100.00 171.25 4,950.00 900.00 1,000.00 22,932.00 110,053.25 71,653.25
16,900.00 36,000.00 4,400.00 1,430.00 58,730.00
16,900.00 36,000.00 4,400.00 1,430.00 58,730.00
58,730.00 58,730.00
130,383.25 168,783.25
62,500.00 2,100.00 171.25 4,950.00 900.00 1,000.00 22,932.00 94,553.25
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
22,932.00 2,100.00 171.25 4,950.00
39,600.00 78,000.00 2,100.00 171.25 4,950.00 900.00 1,000.00 22,932.00 110,053.25 71,653.25
65,000.00 90,000.00 110,000.00 110,000.00
1 M2 Gypsum Board 9 mm, rangka kayu kls. III 1 M2 Gypsum Board 9 mm, rangka kayu kls. II
b. Tenaga 0.260 0.400 0.040 0.013
22,932.00 2,100.00 171.25 4,950.00 900.00 1,000.00 32,053.25
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.260 0.400 0.040 0.013
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
62,500.00 2,100.00 171.25 4,950.00 900.00 1,000.00 22,932.00 94,553.25 16,900.00 36,000.00 4,400.00 1,430.00 58,730.00 58,730.00
16,900.00 36,000.00 4,400.00 1,430.00 58,730.00 153,283.25
PEKERJAAN SANITASI
10.1 Memasang 1 Buah Kloset Duduk Me Bahan 1.000 Bh Kloset Duduk ex toto Perlengkapan ( 6 % Harga Kloset ) b. Tenaga 3.300 1.100 0.001 0.160
Oh Oh Oh Oh
2,250,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
2,250,000.00 135,000.00 2,385,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.2 Memasang 1 Buah Kloset Jongkok Porselen a. Bahan 1.000 Bh Kloset Jongkok Porselen 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang
2,385,000.00
160,000.00 1,250.00 92,500.00
- 64 -
160,000.00 7,500.00 925.00 168,425.00
2,250,000.00 135,000.00 2,385,000.00 214,500.00 99,000.00 110.00 17,600.00 331,210.00 331,210.00
214,500.00 99,000.00 110.00 17,600.00 331,210.00 2,716,210.00
160,000.00 7,500.00 925.00 168,425.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 1.000 1.500 1.500 0.160
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.3 Memasang 1 Buah Kloset Jongkok Teraso a. Bahan 1.000 Bh Kloset Jongkok Teraso 7.000 Bh Bata Merah/kecil 5 x 10x 20 cm 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang
b. Tenaga 1.000 1.500 0.300 0.110
Oh Oh Oh Oh
168,425.00
32,000.00 1,250.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.4 Memasang 1 Buah Urinoir a. Bahan 1.000 Bh Urinoir Perlengkapan ( 30 % Harga Urinoir ) 6.000 Kg Semen Portland 3 0.010 M Pasir Pasang
Oh Oh Oh Oh
49,175.00
1,400,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.5 Memasang 1 Buah Wastafel a. Bahan 1.000 Bh Wastafel Perlengkapan ( 12 % Harga Wastafel ) 6.000 Kg Semen Portland 3 0.010 M Pasir Pasang
b. Tenaga 1.200 1.450 0.150 0.100
Oh Oh Oh Oh
1,828,425.00
450,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
10.6 Memasang 1 Buah Bak Mandi Teraso Volume 0,30 m3 a. Bahan 1.000 Bh Bak Teraso 6.000 Kg Semen Portland 0.010 M3 Pasir Pasang
b. Tenaga 2.100 0.750 0.070 0.110
Oh Oh Oh Oh
512,425.00
180,000.00 1,250.00 92,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.7 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 m3 a. Bahan 1.000 Bh Bak Fibreglass Perlengkapan ( 18 % Harga Bak Fibreglass )
188,425.00
180,000.00
- 65 -
180,000.00 32,400.00 212,400.00
65,000.00 135,000.00 165,000.00 17,600.00 382,600.00 551,025.00
65,000.00 135,000.00 33,000.00 12,100.00 245,100.00 294,275.00
1,400,000.00 420,000.00 7,500.00 925.00 1,828,425.00
65,000.00 90,000.00 11,000.00 11,000.00 177,000.00
65,000.00 90,000.00 11,000.00 11,000.00 177,000.00
177,000.00
2,005,425.00
450,000.00 54,000.00 7,500.00 925.00 512,425.00
78,000.00 130,500.00 16,500.00 11,000.00 236,000.00 236,000.00
180,000.00 7,500.00 925.00 188,425.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
65,000.00 135,000.00 33,000.00 12,100.00 245,100.00 245,100.00
450,000.00 54,000.00 7,500.00 925.00 512,425.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
32,000.00 8,750.00 7,500.00 925.00 49,175.00
1,400,000.00 420,000.00 7,500.00 925.00 1,828,425.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
65,000.00 135,000.00 165,000.00 17,600.00 382,600.00 382,600.00
32,000.00 8,750.00 7,500.00 925.00 49,175.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.000 1.000 0.100 0.100
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
78,000.00 130,500.00 16,500.00 11,000.00 236,000.00 748,425.00
180,000.00 7,500.00 925.00 188,425.00
136,500.00 67,500.00 7,700.00 12,100.00 223,800.00 223,800.00
136,500.00 67,500.00 7,700.00 12,100.00 223,800.00 412,225.00
180,000.00 32,400.00 212,400.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 1.800 2.700 0.540 0.110
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.8 Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3 a. Bahan 0.400 M3 Batu Bata 120.000 Kg Semen Portland 0.300 M3 Pasir Pasang 360.000 Bh Porselen ( 11 x 11 ) cm 6.000 Kg Semen Nat b. Tenaga 6.000 3.000 0.300 0.300
Oh Oh Oh Oh
212,400.00
512,000.00 1,250.00 92,500.00 700.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.9 Memasang 1 Buah Bak Beton Volume 1 m3 Air a. Bahan 0.900 M3 Beton 1 : 1,5 : 2,5 180.000 Kg Besi Beton 8.000 M3 Kayu Cetakan 5.000 M2 Ubin Porselen Perlengkapan ( 10 % Harga Total Bahan )
Oh Oh Oh Oh
706,550.00
1,197,096.40 19,000.00 11,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.10 Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air a. Bahan 1.000 Bh Bak Fibreglass Perlengkapan ( 12 % Harga Bak Fibreglass ) b. Tenaga 3.000 4.500 0.900 0.900
Oh Oh Oh Oh
4,675,096.40
180,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
10.11 Memasang 1 M' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia. 15 cm a. Bahan 1.600 M' Pipa Tanah (Paralon) dia. 15 cm 0.680 Kg Semen Portland 0.013 M3 Pasir Pasang 0.011 M3 Pasir Urug b. Tenaga 0.060 0.030 0.003 0.003
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
201,600.00
123,750.00 1,250.00 92,500.00 65,000.00
10.12 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30) cm, Tinggi 35 cm a. Bahan 0.145 M3 Batu Bata 44.000 Kg Semen Portland 0.070 M3 Pasir Pasang 0.070 M3 Batu Kerikil 1.600 Kg Besi Beton 0.060 M3 Pasir Beton
- 66 -
200,767.50
512,000.00 1,250.00 92,500.00 400,000.00 19,000.00 92,500.00
74,240.00 55,000.00 6,475.00 28,000.00 30,400.00 5,550.00 199,665.00
117,000.00 243,000.00 59,400.00 12,100.00 431,500.00 643,900.00
390,000.00 270,000.00 33,000.00 33,000.00 726,000.00 1,432,550.00
1,077,386.76 3,420,000.00 55,000.00 122,709.64 4,675,096.40 227,500.00 405,000.00 99,000.00 99,000.00 830,500.00
227,500.00 405,000.00 99,000.00 99,000.00 830,500.00
830,500.00
5,505,596.40
180,000.00 21,600.00 201,600.00 195,000.00 405,000.00 99,000.00 99,000.00 798,000.00 798,000.00
198,000.00 850.00 1,202.50 715.00 200,767.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
390,000.00 270,000.00 33,000.00 33,000.00 726,000.00 726,000.00
180,000.00 21,600.00 201,600.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
204,800.00 150,000.00 27,750.00 252,000.00 72,000.00 706,550.00
1,077,386.76 3,420,000.00 55,000.00 122,709.64 4,675,096.40
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
117,000.00 243,000.00 59,400.00 12,100.00 431,500.00 431,500.00
204,800.00 150,000.00 27,750.00 252,000.00 72,000.00 706,550.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 3.500 4.500 0.900 0.900
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
195,000.00 405,000.00 99,000.00 99,000.00 798,000.00 999,600.00
198,000.00 850.00 1,202.50 715.00 200,767.50 3,900.00 2,700.00 330.00 275.00 7,205.00 7,205.00
3,900.00 2,700.00 330.00 275.00 7,205.00 207,972.50
74,240.00 55,000.00 6,475.00 28,000.00 30,400.00 5,550.00 199,665.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 3.200 1.015 0.002 0.016
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.13 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45) cm, Tinggi 50 cm a. Bahan 0.250 M3 Batu Bata 77.000 Kg Semen Portland 0.130 M3 Pasir Pasang 0.020 M3 Batu Kerikil 2.600 Kg Besi Beton 0.090 M3 Pasir Beton b. Tenaga 1.420 0.473 0.047 0.071
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
199,665.00
512,000.00 1,250.00 92,500.00 400,000.00 19,000.00 92,500.00
10.14 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60) cm, Tinggi 65 cm a. Bahan 0.371 M3 Batu Bata 114.000 Kg Semen Portland 0.184 M3 Pasir Pasang 0.033 M3 Batu Kerikil 4.850 Kg Besi Beton 0.120 M3 Pasir Beton
Oh Oh Oh Oh Oh
Pekerja Tukang Batu Tukang Gali Kepala Tukang Mandor
302,000.00
512,000.00 1,250.00 92,500.00 400,000.00 19,000.00 92,500.00
10.15 Memasang 1 m' Pipa Galvanis Dia. /2" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis )
465,922.00
Jumlah Bahan+Tenaga (Rp) 6 208,000.00 91,350.00 165.00 1,760.00 301,275.00 500,940.00
128,000.00 96,250.00 12,025.00 8,000.00 49,400.00 8,325.00 302,000.00 92,300.00 42,570.00 5,170.00 7,810.00 147,850.00 147,850.00
189,952.00 142,500.00 17,020.00 13,200.00 92,150.00 11,100.00 465,922.00
65,000.00 90,000.00 90,000.00 110,000.00 110,000.00 Jumlah
208,000.00 91,350.00 165.00 1,760.00 301,275.00 301,275.00
128,000.00 96,250.00 12,025.00 8,000.00 49,400.00 8,325.00 302,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 2.160 0.720 0.100 0.072 0.108
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
92,300.00 42,570.00 5,170.00 7,810.00 147,850.00 449,850.00
189,952.00 142,500.00 17,020.00 13,200.00 92,150.00 11,100.00 465,922.00
140,400.00 64,800.00 9,000.00 7,920.00 11,880.00 234,000.00 234,000.00
140,400.00 64,800.00 9,000.00 7,920.00 11,880.00 234,000.00 699,922.00
1
b. Tenaga 0.054 0.090 0.009 0.027
Oh Oh Oh Oh
18,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.16 Memasang 1 m' Pipa Galvanis Dia. 3/4" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis )
b. Tenaga 0.054 0.090 0.009 0.027
Oh Oh Oh Oh
22,200.00 6,475.00 28,675.00
28,675.00
23,400.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.17 Memasang 1 m' Pipa Galvanis Dia. 1" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis )
36,270.00
29,175.00
- 67 -
3,510.00 8,100.00 990.00 2,970.00 15,570.00 15,570.00
28,080.00 8,190.00 36,270.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
22,200.00 6,475.00 28,675.00
35,010.00 10,211.25 45,221.25
3,510.00 8,100.00 990.00 2,970.00 15,570.00 44,245.00
28,080.00 8,190.00 36,270.00
3,510.00 8,100.00 990.00 2,970.00 15,570.00
3,510.00 8,100.00 990.00 2,970.00 15,570.00
15,570.00
51,840.00
35,010.00 10,211.25 45,221.25
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.054 0.090 0.009 0.027
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 10.18 Memasang 1 m' Pipa Galvanis Dia. 1 1/2" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis )
b. Tenaga 0.108 0.180 0.018 0.005
Oh Oh Oh Oh
45,221.25
41,700.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.19 Memasang 1 m' Pipa Galvanis Dia. 3" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis )
Oh Oh Oh Oh
64,635.00
108,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
10.20 Memasang 1 m' Pipa Galvanis Dia. 4" a. Bahan 1.200 M' Pipa Galvanis Perlengkapan ( 35 % Harga Pipa Galvanis ) b. Tenaga 0.135 0.225 0.023 0.007
Oh Oh Oh Oh
168,175.00
141,400.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.21 Memasang 1 m' Pipa PVC Tipe AW Dia. /2" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis )
15,570.00
60,791.25
50,040.00 14,595.00 64,635.00
7,020.00 16,200.00 1,980.00 594.00 25,794.00
7,020.00 16,200.00 1,980.00 594.00 25,794.00
25,794.00
90,429.00
130,200.00 37,975.00 168,175.00
7,020.00 16,200.00 1,980.00 594.00 25,794.00 25,794.00
169,680.00 49,490.00 219,170.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
3,510.00 8,100.00 990.00 2,970.00 15,570.00
130,200.00 37,975.00 168,175.00
65,000.00 90,000.00 110,000.00 110,000.00
219,170.00
Jumlah Bahan+Tenaga (Rp) 6
3,510.00 8,100.00 990.00 2,970.00 15,570.00
50,040.00 14,595.00 64,635.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.108 0.180 0.018 0.005
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
7,020.00 16,200.00 1,980.00 594.00 25,794.00 193,969.00
169,680.00 49,490.00 219,170.00 8,775.00 20,250.00 2,475.00 748.00 32,248.00 32,248.00
8,775.00 20,250.00 2,475.00 748.00 32,248.00 251,418.00
1
b. Tenaga 0.036 0.060 0.006 0.002
Oh Oh Oh Oh
4,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.22 Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis ) b. Tenaga 0.036 0.060 0.006 0.002
Oh Oh Oh Oh
4,800.00 1,400.00 6,200.00
6,200.00
5,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.23 Memasang 1 m' Pipa PVC Tipe AW Dia. 1" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis )
8,525.00
7,500.00
- 68 -
2,340.00 5,400.00 660.00 198.00 8,598.00 8,598.00
6,600.00 1,925.00 8,525.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
4,800.00 1,400.00 6,200.00
9,000.00 2,625.00 11,625.00
2,340.00 5,400.00 660.00 198.00 8,598.00 14,798.00
6,600.00 1,925.00 8,525.00 2,340.00 5,400.00 660.00 198.00 8,598.00 8,598.00
2,340.00 5,400.00 660.00 198.00 8,598.00 17,123.00
9,000.00 2,625.00 11,625.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.036 0.060 0.006 0.002
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.24 Memasang 1 m' Pipa PVC Tipe AW Dia. 11/2" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis ) b. Tenaga 0.036 0.060 0.006 0.002
Oh Oh Oh Oh
11,625.00
13,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.25 Memasang 1 m' Pipa PVC Tipe AW Dia. 2" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis )
Oh Oh Oh Oh
20,150.00
16,375.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.26 Memasang 1 m' Pipa PVC Tipe AW Dia. 3" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis ) b. Tenaga 0.081 0.135 0.014 0.004
Oh Oh Oh Oh
25,381.25
32,125.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
10.27 Memasang 1 m' Pipa PVC Tipe AW Dia. 4" a. Bahan 1.200 M' Pipa PVC Perlengkapan ( 35 % Harga Pipa Galvanis )
b. Tenaga 0.081 0.135 0.014 0.004
Oh Oh Oh Oh
49,793.75
52,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.28 Memasang 1 Buah Bak Cuci Piring Stainless Steel a. Bahan 1.000 Bh Bak Cuci Stainless Steel 1.000 Set Kran air+ Asesories b. Tenaga 0.030 0.300 0.030 0.002
Oh Oh Oh Oh
80,600.00
193,000.00 25,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
10.29 Memasang 1 Buah Bak Cuci Piring Teraso a. Bahan 1.000 Bh Bak Cuci Teraso 1.000 Set Kran air+ Asesories 20.000 Kg Semen Portland 0.050 M3 Pasir pasang
218,000.00
325,000.00 25,000.00 1,250.00 92,500.00
- 69 -
3,510.00 8,100.00 990.00 297.00 12,897.00 12,897.00
325,000.00 25,000.00 25,000.00 4,625.00 379,625.00
2,340.00 5,400.00 660.00 198.00 8,598.00 28,748.00
3,510.00 8,100.00 990.00 297.00 12,897.00 38,278.25
38,550.00 11,243.75 49,793.75 5,265.00 12,150.00 1,485.00 451.00 19,351.00 19,351.00
5,265.00 12,150.00 1,485.00 451.00 19,351.00 69,144.75
62,400.00 18,200.00 80,600.00
5,265.00 12,150.00 1,485.00 451.00 19,351.00 19,351.00
193,000.00 25,000.00 218,000.00
65,000.00 90,000.00 110,000.00 110,000.00
2,340.00 5,400.00 660.00 198.00 8,598.00 20,223.00
19,650.00 5,731.25 25,381.25
62,400.00 18,200.00 80,600.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
2,340.00 5,400.00 660.00 198.00 8,598.00 8,598.00
38,550.00 11,243.75 49,793.75
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
15,600.00 4,550.00 20,150.00
19,650.00 5,731.25 25,381.25
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
2,340.00 5,400.00 660.00 198.00 8,598.00 8,598.00
15,600.00 4,550.00 20,150.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.054 0.090 0.009 0.003
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
5,265.00 12,150.00 1,485.00 451.00 19,351.00 99,951.00
193,000.00 25,000.00 218,000.00 1,950.00 27,000.00 3,300.00 165.00 32,415.00 32,415.00
1,950.00 27,000.00 3,300.00 165.00 32,415.00 250,415.00
325,000.00 25,000.00 25,000.00 4,625.00 379,625.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.050 0.500 0.050 0.003
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
10.30 Memasang 1 Buah Kran Dia. 3/4" atau 1/2" a. Bahan 1.000 Bh Kran Air 0.025 Bh Seal Tape
b. Tenaga 0.010 0.100 0.010 0.005
Oh Oh Oh Oh
379,625.00
10,000.00 3,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
10.31 1 Bh Septictank 1,5 m x 2,0 m x 1 m dan Resapan 10.500 M3 Galian Tanah 2.625 M3 Urugan Kembali 8.400 M2 Pas. Batu Bata 1 : 3 0.300 M3 Beton Tumbuk 1 : 3 : 5 13.500 M2 Plesteran 1 : 2 0.200 M3 Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 1.000 Bh Pipa Hawa 2"
M3 M3 M' Bh Kg
Koral Beton Pasir Pasang Pipa dia. 4" Buis Beton dia. 50 cm Ijuk
10,087.50
Jumlah Bahan+Tenaga (Rp) 6 3,250.00 45,000.00 5,500.00 275.00 54,025.00 433,650.00
10,000.00 87.50 10,087.50
650.00 9,000.00 1,100.00 550.00 11,300.00
650.00 9,000.00 1,100.00 550.00 11,300.00
11,300.00
21,387.50
30,400.00 14,570.00 141,712.50 828,764.21 41,472.50 3,470,212.74 20,000.00
319,200.00 38,246.25 1,190,385.00 248,629.26 559,878.75 694,042.55 20,000.00
319,200.00 38,246.25 1,190,385.00 248,629.26 559,878.75 694,042.55 20,000.00
421,683.00 92,500.00 52,000.00 75,000.00 9,000.00
316,262.25 92,500.00 208,000.00 150,000.00 90,000.00 3,927,144.06 3,927,144.06
316,262.25 92,500.00 208,000.00 150,000.00 90,000.00 3,927,144.06 3,927,144.06
17,000.00 42,000.00
18,700.00 3,360.00 22,060.00
18,700.00 3,360.00 22,060.00
Jumlah XI
3,250.00 45,000.00 5,500.00 275.00 54,025.00 54,025.00
10,000.00 87.50 10,087.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
Resapan 0.750 1.000 4.000 2.000 10.000
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
PEKERJAAN BESI DAN ALUMINIUM
11.1 1 Kg Pasang besi WF dan Rangka Atap Baja a. Bahan 1.100 Kg Besi Profil WF 0.080 Kg Meni Besi
b. Tenaga 0.006 0.060 0.006 0.000
Oh Oh Oh Oh
Tukang Besi Pekerja Kepala Tukang Mandor
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
11.2 1 Kg Pasang besi CNP,INP,L dan Rangka Atap Baja a. Bahan 1.100 Kg Besi CNP,INP dan L 0.080 Kg Meni Besi b. Tenaga 0.006 0.006 0.060 0.000
Oh Oh Oh Oh
22,060.00
15,000.00 42,000.00
Tukang Kepala Tukang Pekerja Mandor
11.3 1 m2 Pasang Pintu Besi Baja a. Bahan 1.000 M2 Pintu Besi Baja
b. Tenaga 0.650 0.650 0.065 0.032
Oh Oh Oh Oh
16,500.00 3,360.00 19,860.00
90,000.00 110,000.00 65,000.00 110,000.00 Jumlah
19,860.00
1,950,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
- 70 -
1,950,000.00
540.00 3,900.00 660.00 33.00 5,133.00 27,193.00
16,500.00 3,360.00 19,860.00 540.00 660.00 3,900.00 33.00 5,133.00 5,133.00
1,950,000.00 1,950,000.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
540.00 3,900.00 660.00 33.00 5,133.00 5,133.00
540.00 660.00 3,900.00 33.00 5,133.00 24,993.00
1,950,000.00 1,950,000.00
58,500.00 42,250.00 7,150.00 3,520.00 111,420.00 111,420.00
58,500.00 42,250.00 7,150.00 3,520.00 111,420.00 2,061,420.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1 11.4 1 m2 Pasang Jendela Besi a. Bahan 1.000 M2 Jendela Besi
b. Tenaga 1.050 1.050 0.105 0.005
Oh Oh Oh Oh
2
300,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
11.5 1 m2 Pasang Pintu Lipat a. Bahan 1.000 M2 Pintu Lipat
Oh Oh Oh Oh
300,000.00
380,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
11.6 1 m2 Pasang Pintu Sunscreen Alluminium a. Bahan 1.000 M2 Sunscreen Alluminium
Oh Oh Oh Oh
380,000.00
375,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor Jumlah
11.7 1 m Pasang Sunscreen Besi Holo 30/30 a. Bahan 1.000 Btg Besi Holo 30/30
94,500.00 68,250.00 11,550.00 577.50 174,877.50 174,877.50
375,000.00
94,500.00 68,250.00 11,550.00 577.50 174,877.50 474,877.50
380,000.00 380,000.00 94,500.00 68,250.00 11,550.00 572.00 174,872.00
94,500.00 68,250.00 11,550.00 572.00 174,872.00
174,872.00
554,872.00
375,000.00 375,000.00
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
300,000.00 300,000.00
380,000.00 380,000.00
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.800 0.080 0.080 0.004
300,000.00 300,000.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.050 1.050 0.105 0.005
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
375,000.00 375,000.00
72,000.00 5,200.00 8,800.00 440.00 86,440.00 86,440.00
72,000.00 5,200.00 8,800.00 440.00 86,440.00 461,440.00
2
b. Tenaga 0.800 0.080 0.080 0.004
Oh Oh Oh Oh
140,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
11.8 1 m2 Pasang Rolling Door a. Bahan 1.000 M2 Roll Door
b. Tenaga 1.500 1.050 0.105 0.005
Oh Oh Oh Oh
140,000.00
585,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
11.9 1 m2 Pasang Pintu Alluminium a. Bahan 1.000 M2 Pintu Alluminium
Oh Oh Oh Oh
585,000.00
640,000.00
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
11.10 1 m Pasang Hordeng Vertikals Blinds Bahan 1.000 M2 Vertikals Blinds
72,000.00 5,200.00 8,800.00 440.00 86,440.00 86,440.00
640,000.00
72,000.00 5,200.00 8,800.00 440.00 86,440.00 226,440.00
585,000.00 585,000.00
135,000.00 68,250.00 11,550.00 572.00 215,372.00 215,372.00
640,000.00 640,000.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
140,000.00 140,000.00
585,000.00 585,000.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.050 1.050 0.105 0.005
140,000.00 140,000.00
135,000.00 68,250.00 11,550.00 572.00 215,372.00 800,372.00
640,000.00 640,000.00
94,500.00 68,250.00 11,550.00 572.00 174,872.00 174,872.00
94,500.00 68,250.00 11,550.00 572.00 174,872.00 814,872.00
2
95,000.00
- 71 -
95,000.00 95,000.00
95,000.00 95,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.350 0.350 0.035 0.002
Oh Oh Oh Oh
Tukang Kayu Pekerja Kepala Tukang Mandor
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
11.11 1 m2 Pasang Hordeng Horizontal Blinds (aluminium) Bahan 1.000 M2 Horizontal Blinds
b. Tenaga 0.350 0.350 0.035 0.002
Oh Oh Oh Oh
95,000.00
92,000.00
Tukang Kayu Pekerja Kepala Tukang Mandor
11.12 1 m2 Pasang Terali Besi Strip a. Bahan 11.500 M' Besi Strip 2 x 3
Oh Oh Oh Oh
92,000.00
5,000.00
Tukang Las Pekerja Kepala Tukang Mandor
11.13 1 m Pasang Kawat Harmonika a. Bahan 1.100 M2 Kawat Harmonika 0.020 Kg Paku Biasa 1/2" - 1"
57,500.00
Jumlah Bahan+Tenaga (Rp) 6
31,500.00 22,750.00 3,850.00 192.50 58,292.50 153,292.50
92,000.00 92,000.00
31,500.00 22,750.00 3,850.00 192.50 58,292.50 58,292.50
57,500.00 57,500.00
90,000.00 65,000.00 110,000.00 110,000.00
Jumlah
31,500.00 22,750.00 3,850.00 192.50 58,292.50 58,292.50
92,000.00 92,000.00
90,000.00 65,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 1.200 1.200 0.012 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
31,500.00 22,750.00 3,850.00 192.50 58,292.50 150,292.50
57,500.00 57,500.00
108,000.00 78,000.00 1,320.00 66.00 187,386.00
108,000.00 78,000.00 1,320.00 66.00 187,386.00
187,386.00
244,886.00
2
0.002 b. Tenaga 0.100 0.100 0.010 0.001
39,000.00 18,000.00 3,300,000.00
M3 Kayu Kls.III, Papan
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
11.14 1 m2 Pasang Kawat Nyamuk a. Bahan 1.100 M2 Kawat Nyamuk 0.020 Kg Paku Biasa 1/2" - 1" 0.002
b. Tenaga 0.100 0.100 0.010 0.001
49,200.00
18,000.00 18,000.00 3,300,000.00
M3 Kayu Kls.III, Papan
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
Oh Oh Oh Oh
26,100.00
15,000.00 18,000.00 3,300,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 72 -
6,500.00 9,000.00 1,100.00 55.00 16,655.00 16,655.00
22,800.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 65,855.00
19,800.00 360.00 5,940.00 26,100.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 16,655.00
16,500.00 360.00 5,940.00 22,800.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
42,900.00 360.00 5,940.00 49,200.00
19,800.00 360.00 5,940.00 26,100.00
65,000.00 90,000.00 110,000.00 110,000.00
11.15 1 m2 Pasang Kawat Kassa a. Bahan 1.100 M2 Kawat Kassa 0.020 Kg Paku Biasa 1/2" - 1" 0.002 M3 Kayu Kls.III, Papan
b. Tenaga 0.100 0.100 0.010 0.001
42,900.00 360.00 5,940.00 49,200.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 42,755.00
16,500.00 360.00 5,940.00 22,800.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 16,655.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 39,455.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 11.16 1 m2 Pasang Kawat Burung a. Bahan 1.100 M2 Kawat Burung 0.020 Kg Paku Biasa 1/2" - 1" 0.002 b. Tenaga 0.100 0.100 0.010 0.001
20,000.00 18,000.00 3,300,000.00
M3 Kayu Kls.III, Papan
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
22,000.00 360.00 5,940.00 28,300.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
11.17 1 m Pasang Jendela Nako dan Tralis a. Bahan 1.100 M2 Jendela Nako 0.020 Kg Paku Biasa 1/2" - 1" atau Sekrup 0.025 Kg Besi Strip
28,300.00
Jumlah Bahan+Tenaga (Rp) 6
22,000.00 360.00 5,940.00 28,300.00 6,500.00 9,000.00 1,100.00 55.00 16,655.00 16,655.00
6,500.00 9,000.00 1,100.00 55.00 16,655.00 44,955.00
2
b. Tenaga 0.200 0.200 0.020 0.001
Oh Oh Oh Oh
135,000.00 18,000.00 10,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 11.18 1 m' Pasang Talang Datar, Seng BJLS a. Bahan 0.500 Lbr Seng Plat 3' x 6' bjls 0.015 Kg Paku Biasa 1/2" - 1" 0.010 0.250
b. Tenaga 0.150 0.400 0.025 0.001
149,110.00
106,000.00 18,000.00 3,300,000.00 42,000.00
M3 Kayu Kls.III, Papan Kg Flincote / Meni Besi
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
11.19 1 m' Pasang Talang Miring, Seng BJLS a. Bahan 0.500 Lbr Seng Plat 3' x 6' bjls 0.015 Kg Paku Biasa 1/2" - 1" 0.019 M3 Kayu Kls.III, Papan 0.300 Kg Flincote / Meni Besi
Oh Oh Oh Oh
95,450.00
106,000.00 18,000.00 3,300,000.00 42,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
11.20 1 m' Pasang Talang 1/2 Lingkaran Dia. 10 cm, Seng BJLS a. Bahan 0.300 Lbr Seng Plat 3' x 6' bjls 0.100 Kg Paku Biasa 1/2" - 1" 0.019 0.500
b. Tenaga 0.150 0.250 0.025 0.001
M3 Kayu Kls.III, Papan Kg Besi Strip
Oh Oh Oh Oh
128,570.00
106,000.00 18,000.00 3,300,000.00 10,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
- 73 -
13,000.00 18,000.00 2,200.00 110.00 33,310.00
33,310.00
182,420.00
53,000.00 270.00 31,680.00 10,500.00 95,450.00
9,750.00 36,000.00 2,750.00 137.50 48,637.50 48,637.50
101,300.00
9,750.00 36,000.00 2,750.00 137.50 48,637.50 144,087.50
53,000.00 270.00 62,700.00 12,600.00 128,570.00
2,600.00 36,000.00 2,750.00 137.50 41,487.50
2,600.00 36,000.00 2,750.00 137.50 41,487.50
41,487.50
170,057.50
31,800.00 1,800.00 62,700.00 5,000.00 101,300.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
13,000.00 18,000.00 2,200.00 110.00 33,310.00
53,000.00 270.00 62,700.00 12,600.00 128,570.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
148,500.00 360.00 250.00 149,110.00
53,000.00 270.00 31,680.00 10,500.00 95,450.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.040 0.400 0.025 0.001
148,500.00 360.00 250.00 149,110.00
31,800.00 1,800.00 62,700.00 5,000.00 101,300.00
9,750.00 22,500.00 2,750.00 137.50 35,137.50
9,750.00 22,500.00 2,750.00 137.50 35,137.50
35,137.50
136,437.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
URAIAN
Analisa 1 XII
Harga Satuan (Rp) 3
2
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
Jumlah Bahan+Tenaga (Rp) 6
PEKERJAAN KUNCI DAN KACA
12.1 1 Buah Pasang Kunci Tanam mutu B a. Bahan 1.000 Bh Kunci Tanam mutu B
b. Tenaga 0.060 0.600 0.060 0.003
Oh Oh Oh Oh
90,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
12.2 1 Buah Pasang Kunci Tanam Hotel a. Bahan 1.000 Bh Kunci Tanam Biasa b. Tenaga 0.010 0.500 0.010 0.005
Oh Oh Oh Oh
90,000.00
400,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.3 1 Buah Pasang Kunci Tanam Kamar Mandi a. Bahan 1.000 Bh Kunci Tanam Kamar Mandi
Oh Oh Oh Oh
400,000.00
27,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.4 1 Buah Pasang Engsel Pintu a. Bahan 1.000 Bh Engsel Pintu
b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
27,000.00
18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.5 1 Buah Pasang Engsel Jendela Kuningan a. Bahan 1.000 Bh Engsel Kuningan Jendela b. Tenaga 0.010 0.100 0.010 0.001
Oh Oh Oh Oh
18,000.00
30,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
12.6 1 Buah Pasang Engsel Angin a. Bahan 1.000 Bh Engsel Angin b. Tenaga 0.020 0.200 0.020 0.010
Oh Oh Oh Oh
30,000.00
18,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
18,000.00
15,000.00
- 74 -
15,000.00 15,000.00
650.00 45,000.00 1,100.00 550.00 47,300.00 447,300.00
27,000.00 27,000.00
325.00 45,000.00 550.00 275.00 46,150.00
325.00 45,000.00 550.00 275.00 46,150.00
46,150.00
73,150.00
18,000.00 18,000.00
975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
975.00 13,500.00 1,650.00 82.50 16,207.50 34,207.50
30,000.00 30,000.00 650.00 9,000.00 1,100.00 55.00 10,805.00 10,805.00
18,000.00 18,000.00
65,000.00 90,000.00 110,000.00 110,000.00
12.7 1 Buah Pasang Kait Angin a. Bahan 1.000 Bh Kait Angin
650.00 45,000.00 1,100.00 550.00 47,300.00 47,300.00
30,000.00 30,000.00
65,000.00 90,000.00 110,000.00 110,000.00
3,900.00 54,000.00 6,600.00 330.00 64,830.00 154,830.00
400,000.00 400,000.00
18,000.00 18,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
3,900.00 54,000.00 6,600.00 330.00 64,830.00 64,830.00
27,000.00 27,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
90,000.00 90,000.00
400,000.00 400,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.005 0.500 0.005 0.003
90,000.00 90,000.00
650.00 9,000.00 1,100.00 55.00 10,805.00 40,805.00
18,000.00 18,000.00 1,300.00 18,000.00 2,200.00 1,100.00 22,600.00
1,300.00 18,000.00 2,200.00 1,100.00 22,600.00
22,600.00
40,600.00
15,000.00 15,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
Pekerja Tukang Kayu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
12.8 1 Buah Pasang Door Closer a. Bahan 1.000 Bh Door Closer b. Tenaga 0.050 0.500 0.050 0.003
Oh Oh Oh Oh
15,000.00
240,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.9 1 Buah Pasang Kunci Selot a. Bahan 1.000 Bh Kunci Selot
Oh Oh Oh Oh
240,000.00
13,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.10 1 Buah Pasang Pegangan Pintu / Door Holder a. Bahan 1.000 Bh Door Holder b. Tenaga 0.050 0.500 0.050 0.003
Oh Oh Oh Oh
13,000.00
30,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
12.11 1 Buah Pasang Door Stop a. Bahan 1.000 Bh Door Stop b. Tenaga 0.010 0.100 0.010 0.001
Oh Oh Oh Oh
30,000.00
22,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
12.12 1 Buah Pasang Rel Pintu Dorong a. Bahan 1.000 Bh Rel Pintu Dorong b. Tenaga 0.060 0.600 0.060 0.003
Oh Oh Oh Oh
22,000.00
240,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah
12.13 1 Buah Pasang Kunci Lemari a. Bahan 1.000 Bh Kunci Lemari b. Tenaga 0.025 0.250 0.025 0.001
Oh Oh Oh Oh
240,000.00
8,000.00
Pekerja Tukang Kayu Kepala Tukang Mandor
Jumlah
- 75 -
1,300.00 18,000.00 2,200.00 110.00 21,610.00
21,610.00
34,610.00
30,000.00 30,000.00 3,250.00 45,000.00 5,500.00 275.00 54,025.00 54,025.00
8,000.00
3,250.00 45,000.00 5,500.00 275.00 54,025.00 84,025.00
22,000.00 22,000.00 650.00 9,000.00 1,100.00 55.00 10,805.00
650.00 9,000.00 1,100.00 55.00 10,805.00
10,805.00
32,805.00
240,000.00 240,000.00 3,900.00 54,000.00 6,600.00 330.00 64,830.00 64,830.00
8,000.00 8,000.00
65,000.00 90,000.00 110,000.00 110,000.00
3,250.00 45,000.00 5,500.00 275.00 54,025.00 294,025.00
1,300.00 18,000.00 2,200.00 110.00 21,610.00
240,000.00 240,000.00
65,000.00 90,000.00 110,000.00 110,000.00
975.00 13,500.00 1,650.00 82.50 16,207.50 31,207.50
13,000.00 13,000.00
22,000.00 22,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
3,250.00 45,000.00 5,500.00 275.00 54,025.00 54,025.00
30,000.00 30,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
240,000.00 240,000.00
13,000.00 13,000.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
240,000.00 240,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.020 0.200 0.020 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
3,900.00 54,000.00 6,600.00 330.00 64,830.00 304,830.00
8,000.00 8,000.00 1,625.00 22,500.00 2,750.00 137.50 27,012.50
1,625.00 22,500.00 2,750.00 137.50 27,012.50
27,012.50
35,012.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 12.14 1 m2 Pasang Kaca, Tebal 3 mm a. Bahan 1.100 M2 Kaca Tebal 3 mm b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
65,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
12.15 1 m2 Pasang Kaca, Tebal 5 mm a. Bahan 1.100 M2 Kaca Tebal 5 mm
Oh Oh Oh Oh
71,500.00 71,500.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.015 0.150 0.015 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
71,500.00
110,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor Jumlah
12.16 1 m Pasang Kaca, Tebal 8 mm a. Bahan 1.100 M2 Kaca Polos
71,500.00 71,500.00 975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
121,000.00 121,000.00
65,000.00 90,000.00 110,000.00 110,000.00 121,000.00
Jumlah Bahan+Tenaga (Rp) 6
975.00 13,500.00 1,650.00 82.50 16,207.50 87,707.50
121,000.00 121,000.00
975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
975.00 13,500.00 1,650.00 82.50 16,207.50 137,207.50
2
b. Tenaga 0.017 0.165 0.017 0.001
Oh Oh Oh Oh
200,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 12.17 1 m2 Pasang Kaca Buram, Tebal 12 mm a. Bahan 1.100 M2 Kaca Buram 0.050 Kg Sealent
b. Tenaga 0.025 0.250 0.025 0.001
Oh Oh Oh Oh
220,000.00
390,000.00 45,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor Jumlah
Oh Oh Oh Oh
431,250.00
124,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
12.19 1 m2 Pasang Kaca Cermin, Tebal 5 mm a. Bahan 1.100 M2 Kaca Cermin Tebal 5 mm b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
136,400.00
325,000.00
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
12.20 1 m2 Pasang Kaca Patri, Tebal 5 mm a. Bahan 1.100 M2 Kaca Patri
357,500.00
1,600,000.00
- 76 -
1,072.50 14,850.00 1,815.00 88.00 17,825.50
17,825.50
237,825.50
429,000.00 2,250.00 431,250.00
1,625.00 22,500.00 2,750.00 137.50 27,012.50 27,012.50
1,760,000.00 1,760,000.00
1,625.00 22,500.00 2,750.00 137.50 27,012.50 458,262.50
136,400.00 136,400.00
975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
357,500.00 357,500.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
1,072.50 14,850.00 1,815.00 88.00 17,825.50
136,400.00 136,400.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
220,000.00 220,000.00
429,000.00 2,250.00 431,250.00
65,000.00 90,000.00 110,000.00 110,000.00
12.18 1 m2 Pasang Kaca Cermin, Tebal 3 mm a. Bahan 1.100 M2 Kaca Cermin Tebal 3 mm
b. Tenaga 0.015 0.150 0.015 0.001
220,000.00 220,000.00
975.00 13,500.00 1,650.00 82.50 16,207.50 152,607.50
357,500.00 357,500.00 975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
975.00 13,500.00 1,650.00 82.50 16,207.50 373,707.50
1,760,000.00 1,760,000.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
12.21 1 Set Pekerjaan Pasang Jendela Kaca Nako Biasa a. Bahan 1.000 Set Bingkai Nako 1.000 Set Kaca Nako 6 daun 1.000 Set Kaca Nako 8 daun
1,760,000.00
14,000.00 54,000.00 62,000.00 Nako 6 daun Nako 8 daun
b. Tenaga 0.015 0.150 0.015 0.001
Oh Oh Oh Oh
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
12.22 1 Set Pekerjaan Pasang Jendela Kaca Nako Rayben a. Bahan 1.000 Set Bingkai Naco 1.000 Set Kaca Naco 6 daun Rayben 1.000 Set Kaca Naco 8 daun Rayben
68,000.00 76,000.00
14,000.00 54,000.00 61,000.00 Nako 6 daun Nako 8 daun
Oh Oh Oh Oh
Pekerja Tukang Kayu/kaca Kepala Tukang Mandor
XIII
68,000.00 75,000.00
Jumlah Bahan+Tenaga (Rp) 6
975.00 13,500.00 1,650.00 82.50 16,207.50 1,776,207.50
14,000.00 54,000.00 62,000.00 68,000.00 76,000.00 975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50 16,207.50
14,000.00 54,000.00 61,000.00 68,000.00 75,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Nako 6 daun Rayben Nako 8 daun Rayben
975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50
14,000.00 54,000.00 62,000.00 68,000.00 76,000.00
65,000.00 90,000.00 110,000.00 110,000.00 Nako 6 daun Nako 8 daun
b. Tenaga 0.015 0.150 0.015 0.001
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
975.00 13,500.00 1,650.00 82.50 16,207.50 84,207.50 92,207.50
14,000.00 54,000.00 61,000.00 68,000.00 75,000.00 975.00 13,500.00 1,650.00 82.50 16,207.50 16,207.50 16,207.50
975.00 13,500.00 1,650.00 82.50 16,207.50 84,207.50 91,207.50
PEKERJAAN PENUTUP LANTAI DAN DINDING
13.1 1 m2 Pasang Lantai Granito Ukuran 60 x 60 cm a. Bahan 3.080 Bh Ubin Granito 60 x 60 cm 9.800 Kg Semen Portland 0.022 M3 Pasir Pasang 1.300 Kg Semen Warna b. Tenaga 0.250 0.120 0.012 0.013
Oh Oh Oh Oh
117,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
360,360.00 12,250.00 1,988.75 15,600.00 390,198.75
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 13.2 1 m Pasang Lantai Granito Ukuran 30 x 30 cm a. Bahan 11.870 Bh Ubin Granito 30 x 30 cm 10.000 Kg Semen Portland 0.022 M3 Pasir Pasang 1.500 Kg Semen Warna
390,198.75
360,360.00 12,250.00 1,988.75 15,600.00 390,198.75 16,250.00 10,800.00 1,320.00 1,375.00 29,745.00
16,250.00 10,800.00 1,320.00 1,375.00 29,745.00
29,745.00
419,943.75
2
b. Tenaga 0.260 0.125 0.013 0.013
Oh Oh Oh Oh
20,500.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
243,335.00 12,500.00 1,988.75 18,000.00 275,823.75
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.3 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm a. Bahan 3.000 Bh Ubin Teralux Marmer 60 x 60 cm 8.190 Kg Semen Portland 0.045 M3 Pasir Pasang 1.000 Kg Semen Warna
275,823.75
100,000.00 1,250.00 92,500.00 12,000.00
- 77 -
300,000.00 10,237.50 4,162.50 12,000.00 326,400.00
243,335.00 12,500.00 1,988.75 18,000.00 275,823.75 16,900.00 11,250.00 1,375.00 1,430.00 30,955.00 30,955.00
16,900.00 11,250.00 1,375.00 1,430.00 30,955.00 306,778.75
300,000.00 10,237.50 4,162.50 12,000.00 326,400.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.250 0.120 0.012 0.013
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.4 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm a. Bahan 6.250 Bh Ubin Teralux Marmer 40 x 40 cm 8.800 Kg Semen Portland 0.022 M3 Pasir Pasang 1.300 Kg Semen Warna b. Tenaga 0.672 0.224 0.022 0.034
Oh Oh Oh Oh
326,400.00
48,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.5 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm a. Bahan 11.870 Bh Ubin Teralux Marmer 30 x 30 cm 10.000 Kg Semen Portland 0.022 M3 Pasir Pasang 1.500 Kg Semen Warna
Oh Oh Oh Oh
328,588.75
25,273.80 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.6 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 30 cm a. Bahan 3.530 Bh Plint Ubin Teraso 10 x 30 cm 1.560 Kg Semen Portland 0.003 M3 Pasir Pasang 0.190 Kg Semen Warna
b. Tenaga 0.080 0.040 0.004 0.004
Oh Oh Oh Oh
332,488.75
850.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah 13.7 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 40 cm a. Bahan 2.650 Bh Plint Ubin Teraso 10 x 40 cm 1.200 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna
b. Tenaga 0.800 0.040 0.004 0.004
Oh Oh Oh Oh
7,508.00
875.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah
5,296.25
29,250.00 1,250.00 92,500.00 12,000.00
- 78 -
51,772.50 1,500.00 277.50 1,200.00 54,750.00
16,250.00 10,800.00 1,320.00 1,375.00 29,745.00 356,145.00
43,680.00 20,160.00 2,420.00 3,740.00 70,000.00 398,588.75
300,000.00 12,500.00 1,988.75 18,000.00 332,488.75 45,500.00 30,600.00 3,740.00 3,850.00 83,690.00 83,690.00
45,500.00 30,600.00 3,740.00 3,850.00 83,690.00 416,178.75
3,000.50 1,950.00 277.50 2,280.00 7,508.00
5,200.00 3,600.00 440.00 440.00 9,680.00
5,200.00 3,600.00 440.00 440.00 9,680.00
9,680.00
17,188.00
2,318.75 1,500.00 277.50 1,200.00 5,296.25
65,000.00 90,000.00 110,000.00 110,000.00
13.8 1 m' Pasang Plint Ubin Granito Ukuran 10 x 60 cm a. Bahan 1.770 Bh Plint Ubin Granito 10 x 60 cm 1.200 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna
43,680.00 20,160.00 2,420.00 3,740.00 70,000.00 70,000.00
3,000.50 1,950.00 277.50 2,280.00 7,508.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
300,000.00 11,000.00 1,988.75 15,600.00 328,588.75
300,000.00 12,500.00 1,988.75 18,000.00 332,488.75
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
16,250.00 10,800.00 1,320.00 1,375.00 29,745.00 29,745.00
300,000.00 11,000.00 1,988.75 15,600.00 328,588.75
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.700 0.340 0.034 0.035
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
2,318.75 1,500.00 277.50 1,200.00 5,296.25
52,000.00 3,600.00 440.00 440.00 56,480.00
52,000.00 3,600.00 440.00 440.00 56,480.00
56,480.00
61,776.25
51,772.50 1,500.00 277.50 1,200.00 54,750.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.060 0.030 0.003 0.003
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.9 1 m' Pasang Plint Ubin Granito Ukuran 10 x 30 cm a. Bahan 3.330 Bh Plint Ubin Granito 10 x 30 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna
b. Tenaga 0.900 0.090 0.009 0.005
Oh Oh Oh Oh
54,750.00
6,833.33 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.10 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm a. Bahan 1.700 Bh Plint Ubin Teralux Marmer 10 x 60 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna
Oh Oh Oh Oh
26,313.50
16,666.67 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.11 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm a. Bahan 2.500 Bh Plint Ubin Teralux Marmer 10 x 40 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna b. Tenaga 0.900 0.090 0.009 0.005
Oh Oh Oh Oh
31,891.83
12,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
13.12 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm a. Bahan 3.330 Bh Plint Ubin Teralux Marmer 10 x 30 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna
b. Tenaga 0.900 0.090 0.009 0.005
Oh Oh Oh Oh
33,558.50
8,424.60 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
13.13 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 20 cm a. Bahan 25.000 Bh Ubin Keramik Artistik 10 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
31,612.42
6,100.00 1,250.00 92,500.00 12,000.00
- 79 -
58,500.00 8,100.00 990.00 495.00 68,085.00
68,085.00
94,398.50
28,333.33 2,062.50 296.00 1,200.00 31,891.83
58,500.00 8,100.00 990.00 495.00 68,085.00
58,500.00 8,100.00 990.00 495.00 68,085.00
68,085.00
99,976.83
30,000.00 2,062.50 296.00 1,200.00 33,558.50 58,500.00 8,100.00 990.00 495.00 68,085.00 68,085.00
28,053.92 2,062.50 296.00 1,200.00 31,612.42
65,000.00 90,000.00 110,000.00 110,000.00
152,500.00 14,225.00 3,885.00 18,000.00 188,610.00
3,900.00 2,700.00 330.00 330.00 7,260.00 62,010.00
58,500.00 8,100.00 990.00 495.00 68,085.00
30,000.00 2,062.50 296.00 1,200.00 33,558.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
22,755.00 2,062.50 296.00 1,200.00 26,313.50
28,333.33 2,062.50 296.00 1,200.00 31,891.83
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
3,900.00 2,700.00 330.00 330.00 7,260.00 7,260.00
22,755.00 2,062.50 296.00 1,200.00 26,313.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
b. Tenaga 0.900 0.090 0.009 0.005
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
58,500.00 8,100.00 990.00 495.00 68,085.00 101,643.50
28,053.92 2,062.50 296.00 1,200.00 31,612.42
58,500.00 8,100.00 990.00 495.00 68,085.00 68,085.00
58,500.00 8,100.00 990.00 495.00 68,085.00 99,697.42
152,500.00 14,225.00 3,885.00 18,000.00 188,610.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.14 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 10 cm a. Bahan 50.000 Bh Ubin Keramik Artistik 10 x 10 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 2.000 Kg Semen Warna b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
188,610.00
6,100.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.15 1 m2 Pasang Lantai Keramik Artistik Ukuran 5 x 20 cm a. Bahan 100.000 Bh Ubin Keramik Artistik 5 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
Oh Oh Oh Oh
347,110.00
6,100.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.16 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 20 cm a. Bahan 5.000 Bh Plint Keramik Artistik 10 x 20 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.100 Kg Semen Warna b. Tenaga 0.090 0.090 0.009 0.005
Oh Oh Oh Oh
646,110.00
6,100.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
13.17 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 10 cm a. Bahan 5.000 Bh Plint Keramik Artistik 10 x 10 cm 1.650 Kg Semen Portland 0.003 M3 Pasir Pasang 0.120 Kg Semen Warna
b. Tenaga 0.090 0.090 0.009 0.005
Oh Oh Oh Oh
34,058.50
6,100.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
b. Tenaga 0.090 0.090 0.009 0.005
Oh Oh Oh Oh
34,298.50
6,100.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
- 80 -
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
32,726.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 426,060.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 725,060.00
30,500.00 2,062.50 296.00 1,200.00 34,058.50 5,850.00 8,100.00 990.00 495.00 15,435.00 15,435.00
5,850.00 8,100.00 990.00 495.00 15,435.00 49,493.50
30,500.00 2,062.50 296.00 1,440.00 34,298.50
5,850.00 8,100.00 990.00 495.00 15,435.00 15,435.00
30,500.00 1,062.50 203.50 960.00 32,726.00
65,000.00 90,000.00 110,000.00 110,000.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 267,560.00
610,000.00 14,225.00 3,885.00 18,000.00 646,110.00
30,500.00 2,062.50 296.00 1,440.00 34,298.50
65,000.00 90,000.00 110,000.00 110,000.00
13.18 1 m2 Pasang Plint Keramik Artistik Ukuran 5 x 20 cm a. Bahan 5.000 Bh Plint Keramik Artistik 5 x 20 cm 0.850 Kg Semen Portland 0.002 M3 Pasir Pasang 0.080 Kg Semen Warna
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
30,500.00 2,062.50 296.00 1,200.00 34,058.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
305,000.00 14,225.00 3,885.00 24,000.00 347,110.00
610,000.00 14,225.00 3,885.00 18,000.00 646,110.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
305,000.00 14,225.00 3,885.00 24,000.00 347,110.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.620 0.350 0.035 0.030
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
5,850.00 8,100.00 990.00 495.00 15,435.00 49,733.50
30,500.00 1,062.50 203.50 960.00 32,726.00 5,850.00 8,100.00 990.00 495.00 15,435.00 15,435.00
5,850.00 8,100.00 990.00 495.00 15,435.00 48,161.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
13.19 1 m2 Pasang Lantai Keramik Ukuran 10 x 20 cm a. Bahan 50.000 Bh Ubin Keramik 10 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
1,040.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
52,000.00 14,225.00 3,885.00 18,000.00 88,110.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 13.20 1 m Pasang Lantai Keramik Ukuran 20 x 20 cm a. Bahan 25.000 Bh Ubin Keramik 20 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
88,110.00
Jumlah Bahan+Tenaga (Rp) 6
52,000.00 14,225.00 3,885.00 18,000.00 88,110.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
78,950.00
167,060.00
2
b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
2,080.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
52,000.00 14,225.00 3,885.00 18,000.00 88,110.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.21 1 m Pasang Lantai Keramik Ukuran 25 x 20 cm a. Bahan 20.000 Bh Ubin Keramik 25 x 20 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
88,110.00
52,000.00 14,225.00 3,885.00 18,000.00 88,110.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 167,060.00
2
b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
3,400.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.22 1 m2 Pasang Lantai Keramik Warna Ukuran 30 x 30 cm a. Bahan 11.110 Bh Ubin Keramik Warna 30 x 30 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
104,110.00
4,320.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.23 1 m2 Pasang Lantai Keramik Putih Ukuran 30 x 30 cm a. Bahan 11.110 Bh Ubin Keramik Putih 30 x 30 cm 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
Oh Oh Oh Oh
84,105.20
4,320.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
- 81 -
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
84,105.20
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 183,060.00
47,995.20 14,225.00 3,885.00 18,000.00 84,105.20
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
47,995.20 14,225.00 3,885.00 18,000.00 84,105.20
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
68,000.00 14,225.00 3,885.00 18,000.00 104,110.00
47,995.20 14,225.00 3,885.00 18,000.00 84,105.20
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.620 0.350 0.035 0.030
68,000.00 14,225.00 3,885.00 18,000.00 104,110.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 163,055.20
47,995.20 14,225.00 3,885.00 18,000.00 84,105.20 40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
78,950.00
163,055.20
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa
1 2 13.24 1 m2 Pasang Lantai Keramik Warna Ukuran 40 x 40 cm a. Bahan 6.250 Bh Keramik Warna 40 x 40 cm mutu C 6.250 Bh Keramik Warna 40 x 40 cm mutu B 11.380 Kg Semen Portland 0.042 M3 Pasir Pasang 1.500 Kg Semen Warna
8,320.00 10,400.00 1,250.00 92,500.00 12,000.00 Mutu C Mutu B
b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
13.25 1 m' Pasang Plint Keramik a. Bahan 3.000 Bh Plint Keramik Putih 10 x 30 cm 3.000 Bh Plint Keramik Warna 10 x 30 cm 2.500 Bh Plint Keramik Warna 10 x 40 cm mutu C 2.500 Bh Plint Keramik Warna 10 x 40 cm mutu B 0.850 Kg Semen Portland 0.002 M3 Pasir Pasang 0.080 Kg Semen Warna Plint keramik putih 10 X 30 cm Plint keramik Warna 10 X 30 cm Plint keramik Warna 10 X 40 cm, mutu C Plint keramik Warna 10 X 40 cm, mutu B b. Tenaga 0.090 Oh Pekerja 0.090 Oh Tukang Batu 0.009 Oh Kepala Tukang 0.005 Oh Mandor
88,110.00 101,110.00
1,440.00 1,440.00 3,328.00 4,160.00 1,250.00 92,500.00 12,000.00
13.26 1 m2 Pasang Lantai Marmer a. Bahan 1.052 M2 Marmer 14.150 Kg Semen Portland 0.039 M3 Pasir Pasang 2.000 Kg Semen Warna
6,546.00 6,546.00 10,546.00 12,626.00
300,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
13.27 1 m2 Pasang Lantai Karpet 6 mm a. Bahan 1.050 M2 Carpet 6 mm 0.350 Kg Lem Vinyl b. Tenaga 0.170 0.170 0.017 0.009
Oh Oh Oh Oh
360,895.00
75,000.00 8,500.00
Pekerja Tukang Batu Kepala Tukang Mandor Jumlah
b. Tenaga 0.170 0.170 0.017 0.009
Oh Oh Oh Oh
81,725.00
280,000.00 8,500.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.29 1 m2 Pasang Lantai Parquet Jati a. Bahan
- 82 -
78,950.00 78,950.00
167,060.00 180,060.00
4,320.00 4,320.00 8,320.00 10,400.00 1,062.50 203.50 960.00 6,546.00 6,546.00 10,546.00 12,626.00 5,850.00 8,100.00 990.00 495.00 15,435.00
5,850.00 8,100.00 990.00 495.00 15,435.00
15,435.00 15,435.00 15,435.00 15,435.00
21,981.00 21,981.00 25,981.00 28,061.00
315,600.00 17,687.50 3,607.50 24,000.00 360,895.00 40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
288,575.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 439,845.00
78,750.00 2,975.00 81,725.00 11,050.00 15,300.00 1,870.00 935.00 29,155.00 29,155.00
285,600.00 2,975.00 288,575.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
78,750.00 2,975.00 81,725.00
65,000.00 90,000.00 110,000.00 110,000.00
13.28 1 m2 Pasang dinding Wallpaper a. Bahan 1.020 M2 Wallpaper 0.350 Kg Lem Vinyl
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00
315,600.00 17,687.50 3,607.50 24,000.00 360,895.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
52,000.00 65,000.00 14,225.00 3,885.00 18,000.00 88,110.00 101,110.00
4,320.00 4,320.00 8,320.00 10,400.00 1,062.50 203.50 960.00 6,546.00 6,546.00 10,546.00 12,626.00
65,000.00 90,000.00 110,000.00 110,000.00
Plint keramik putih 10 X 30 cm Plint keramik Warna 10 X 30 cm Plint keramik Warna 10 X 40 cm, mutu C Plint keramik Warna 10 X 40 cm, mutu B
Oh Oh Oh Oh
52,000.00 65,000.00 14,225.00 3,885.00 18,000.00 88,110.00 101,110.00
65,000.00 90,000.00 110,000.00 110,000.00
Mutu C , Jumlah Mutu B , Jumlah
b. Tenaga 0.620 0.350 0.035 0.030
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
11,050.00 15,300.00 1,870.00 935.00 29,155.00 110,880.00
285,600.00 2,975.00 288,575.00 11,050.00 15,300.00 1,870.00 935.00 29,155.00 29,155.00
11,050.00 15,300.00 1,870.00 935.00 29,155.00 317,730.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3 385,000.00 8,500.00
URAIAN
Analisa 1
2 1.050 0.600 b. Tenaga 0.650 0.350 0.035 0.033
M2 Parquet Jati Kg Lem Vinyl
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5 404,250.00 5,100.00 409,350.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.30 1 m Pasang Dinding Porselin 10 x 10 cm, putih a. Bahan 100.000 Bh Porselin 11 x 11 cm, Putih 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Puith
409,350.00
42,250.00 31,500.00 3,850.00 3,575.00 81,175.00 81,175.00
Jumlah Bahan+Tenaga (Rp) 6 404,250.00 5,100.00 409,350.00 42,250.00 31,500.00 3,850.00 3,575.00 81,175.00 490,525.00
2
b. Tenaga 0.620 0.500 0.050 0.030
Oh Oh Oh Oh
700.00 1,250.00 92,500.00 2,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
70,000.00 11,625.00 1,665.00 3,000.00 86,290.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.31 1 m Pasang Dinding Porselin 10 x 10 cm, Warna a. Bahan 100.000 Bh Porselin 11 x 11 cm warna/setara disesuaikan 9.300 Kg Semen Abu-abu 0.018 M3 Pasir Pasang 1.500 Kg Semen Warna
86,290.00
70,000.00 11,625.00 1,665.00 3,000.00 86,290.00 40,300.00 45,000.00 5,500.00 3,300.00 94,100.00 94,100.00
40,300.00 45,000.00 5,500.00 3,300.00 94,100.00 180,390.00
2
b. Tenaga 0.620 0.500 0.050 0.030
Oh Oh Oh Oh
1,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
100,000.00 11,625.00 1,665.00 18,000.00 131,290.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.32 1 m Pasang Dinding Marmer a. Bahan 1.020 M2 Marmer 2.000 Bh Paku Pancing 60 x 230 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 1.500 Kg Semen Warna
131,290.00
100,000.00 11,625.00 1,665.00 18,000.00 131,290.00 40,300.00 45,000.00 5,500.00 3,300.00 94,100.00 94,100.00
40,300.00 45,000.00 5,500.00 3,300.00 94,100.00 225,390.00
2
b. Tenaga 0.720 0.650 0.065 0.035
Oh Oh Oh Oh
300,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.33 1 m2 Pasang Dinding Batu Tempel Hitam/Kali + anti lumut (vernis) a. Bahan 1.050 M2 Batu Tempel Hitam 0.100 Kg Anti Lumut/Vernis batu 11.750 Kg Semen Abu-abu 0.035 M3 Pasir Pasang b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
306,000.00 15,550.00 2,312.50 18,000.00 341,862.50
Pekerja Tukang Batu Kepala Tukang Mandor
341,862.50
93,000.00 65,000.00 1,250.00 92,500.00
13.34 1 m2 Pasang Dinding Batu Candi Hitam + anti lumut (vernis) a. Bahan 1.050 M2 Batu Candi hitam 0.100 Kg Anti Lumut/Vernis batu 11.750 Kg Semen Abu-abu 0.035 M3 Pasir Pasang
122,075.00
225,000.00 65,000.00 1,250.00 92,500.00
- 83 -
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00 116,300.00
97,650.00 6,500.00 14,687.50 3,237.50 122,075.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
306,000.00 15,550.00 2,312.50 18,000.00 341,862.50
236,250.00 6,500.00 14,687.50 3,237.50 260,675.00
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00 458,162.50
97,650.00 6,500.00 14,687.50 3,237.50 122,075.00 40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 201,025.00
236,250.00 6,500.00 14,687.50 3,237.50 260,675.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.620 0.350 0.035 0.030
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
13.35 1 m2 Pasang Dinding batu Alam / Palimanan + anti lumut(vernis) a. Bahan 1.020 M2 Batu alam/Palimanan 0.100 Kg Anti Lumut/Vernis batu 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 1.500 Kg Semen Warna b. Tenaga 0.720 0.650 0.065 0.035
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
260,675.00
168,000.00 65,000.00 1,250.00 92,500.00 12,000.00
13.36 1 m2 Pasang Dinding batu Alam/KarangPilang + anti lumut(vernis) a. Bahan 1.020 M2 Batu alam/KarangPilang 0.100 Kg Anti Lumut/Vernis batu 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 1.500 Kg Semen Warna
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
213,722.50
594,000.00 65,000.00 1,250.00 92,500.00 12,000.00
13.37 1 m2 Pasang Dinding batu Alam/Andesit + anti lumut(vernis) a. Bahan 1.020 M2 Batu alam/Andesit(garis-garis) 0.100 Kg Anti Lumut/Vernis batu 12.440 Kg Semen Abu-abu 0.025 M3 Pasir Pasang 1.500 Kg Semen Warna b. Tenaga 0.720 0.650 0.065 0.035
Oh Oh Oh Oh
648,242.50
190,000.00 65,000.00 1,250.00 92,500.00 12,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
Jumlah 13.38 1 m2 plint Kayu 2 x 10 cm a. Bahan 0.002 M3 Kayu Jati Papan 0.050 Kg Paku Skrup 3,5"
b. Tenaga 0.120 0.120 0.012 0.006
Oh Oh Oh Oh
236,162.50
8,250,000.00 45,000.00
Pekerja Tukang Batu Kepala Tukang Mandor
13.39 1 m2 Pas. Lantai Batu Bata Diplester a. Bahan 58.500 Bh Bata Lobang 9 x 9 x 19 cm 70.000 Bh Bata Lobang 5 x 11 x 22 cm 0.248 Zak Semen Portland (PC) 0.047 M3 Pasir Pasang
22,050.00
725.00 1,250.00 62,000.00 92,500.00
- 84 -
42,412.50 87,500.00 15,376.00 4,347.50 62,136.00 107,223.50
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 339,625.00
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00 330,022.50
605,880.00 6,500.00 15,550.00 2,312.50 18,000.00 648,242.50 46,800.00 58,500.00 7,150.00 3,850.00 116,300.00
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00
116,300.00
764,542.50
193,800.00 6,500.00 15,550.00 2,312.50 18,000.00 236,162.50 46,800.00 58,500.00 7,150.00 3,850.00 116,300.00
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00
116,300.00
352,462.50
19,800.00 2,250.00 22,050.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
46,800.00 58,500.00 7,150.00 3,850.00 116,300.00 116,300.00
193,800.00 6,500.00 15,550.00 2,312.50 18,000.00 236,162.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
171,360.00 6,500.00 15,550.00 2,312.50 18,000.00 213,722.50
605,880.00 6,500.00 15,550.00 2,312.50 18,000.00 648,242.50
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
40,300.00 31,500.00 3,850.00 3,300.00 78,950.00 78,950.00
171,360.00 6,500.00 15,550.00 2,312.50 18,000.00 213,722.50
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.720 0.650 0.065 0.035
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
19,800.00 2,250.00 22,050.00
7,800.00 10,800.00 1,320.00 660.00 20,580.00 20,580.00
7,800.00 10,800.00 1,320.00 660.00 20,580.00 42,630.00
42,412.50 87,500.00 15,376.00 4,347.50 62,136.00 107,223.50
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 b. Tenaga 0.250 0.160 0.076 0.025
Oh Oh Oh Oh
Pekerja Tukang Batu Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Bata lobang Bata merah/kecil
13.40 1 m2 Pas. Coneblock, tebal 8 cm a. Bahan 50.000 Bh Conblock 8 cm biasa, 10 X 20 cm 50.000 Bh Conblock 8 cm Warna, 10 X 20 cm 0.100 M3 Pasir Pasang
62,136.00 107,223.50
2,450.00 3,000.00 92,500.00 Coneblock biasa 8 cm Coneblock warna 8 cm
b. Tenaga 0.350 0.018
Oh Pekerja Oh Mandor
13.41 1 m2 Pas. Coneblock, tebal 6 cm a. Bahan 50.000 Bh Coneblock 6 cm biasa, 10 X 20 cm 50.000 Bh Coneblock 6 cm Warna, 10 X 20 cm 0.100 M3 Pasir Pasang
131,750.00 159,250.00
1,800.00 2,400.00 92,500.00
Oh Pekerja Oh Mandor
13.42 1 m2 Pas. Lantai Mozaik 30/30 a. Bahan 11.100 Bh Mozaik uk. 30 x 30 0.096 Zak Semen Portland (PC) 0.050 M3 Perekat b. Tenaga 0.250 0.025 0.500 0.025
Oh Oh Oh Oh
99,250.00 129,250.00
7,500.00 62,000.00 756,356.00
Tukang Batu Kepala Tukang Pekerja Mandor Jumlah
XIV
22,750.00 1,925.00 24,675.00 24,675.00 24,675.00
127,019.80
16,250.00 14,400.00 8,360.00 2,750.00 41,760.00 103,896.00 148,983.50
22,750.00 1,925.00 24,675.00 156,425.00 183,925.00
90,000.00 120,000.00 9,250.00 99,250.00 129,250.00 22,750.00 1,925.00 24,675.00
22,750.00 1,925.00 24,675.00
24,675.00 24,675.00
123,925.00 153,925.00
83,250.00 5,952.00 37,817.80 127,019.80
90,000.00 110,000.00 65,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
122,500.00 150,000.00 9,250.00 131,750.00 159,250.00
90,000.00 120,000.00 9,250.00 99,250.00 129,250.00
65,000.00 110,000.00
Coneblock biasa 6 cm Coneblock warna 6 cm
16,250.00 14,400.00 8,360.00 2,750.00 41,760.00 41,760.00 41,760.00
122,500.00 150,000.00 9,250.00 131,750.00 159,250.00
65,000.00 110,000.00 Coneblock biasa, tbl 8 cm Coneblock warna, tbl. 8 cm
b. Tenaga 0.350 0.018
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
83,250.00 5,952.00 37,817.80 127,019.80 22,500.00 2,750.00 32,500.00 2,750.00 60,500.00 60,500.00
22,500.00 2,750.00 32,500.00 2,750.00 60,500.00 187,519.80
PEKERJAAN PENGECATAN
14.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama a. Bahan 0.050 Kg Soda Api b. Tenaga 0.150
0.003
Oh Oh Oh Oh
30,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
1,500.00 1,500.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah
1,500.00
1,500.00 1,500.00 9,750.00 275.00 10,025.00
9,750.00 275.00 10,025.00
10,025.00
11,525.00
14.2 1 m2 Mencuci bidang permukaan tembok yang pernah di cat a. Bahan 0.050 b. Tenaga 0.150
0.003
Kg Sabun
Oh Oh Oh Oh
11,200.00
Pekerja Tukang Cat Kepala Tukang Mandor
560.00 560.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
- 85 -
560.00
560.00 560.00 9,750.00 275.00 10,025.00 10,025.00
9,750.00 275.00 10,025.00 10,585.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
URAIAN
Analisa
1 2 14.3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual a. Bahan 0.050 Kg Sabun b. Tenaga 0.150
0.003
Oh Oh Oh Oh
Pekerja Tukang Cat Kepala Tukang Mandor
Harga Satuan (Rp) 3
11,200.00
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
560.00 560.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.4 1 m Menyabun Permukaan Tembok Lama a. Bahan 0.050 Kg Sabun
560.00
Jumlah Bahan+Tenaga (Rp) 6
560.00 560.00 9,750.00 275.00 10,025.00 10,025.00
9,750.00 275.00 10,025.00 10,585.00
2
b. Tenaga 0.150
0.003
Oh Oh Oh Oh
11,200.00
Pekerja Tukang Cat Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.5 1 m2 Mendempul dan Menggosok Kayu a. Bahan 0.080 Kg Dempul Jadi 0.020 Kg Minyak Cat 0.010 Kg Batu Apung b. Tenaga 0.040 0.040 0.004 0.003
Oh Oh Oh Oh
560.00 560.00
560.00
20,000.00 6,000.00 2,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
14.6 1 m Pengecatan Bidang Kayu Lama a. Bahan 0.150 Kg Plamir 0.170 Kg Cat Dasar 0.170 Kg Cat Penutup
9,750.00 275.00 10,025.00 10,025.00
1,600.00 120.00 20.00 1,740.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
560.00 560.00
1,740.00
9,750.00 275.00 10,025.00 10,585.00
1,600.00 120.00 20.00 1,740.00 2,600.00 3,600.00 440.00 275.00 6,915.00 6,915.00
2,600.00 3,600.00 440.00 275.00 6,915.00 8,655.00
2
b. Tenaga 0.070 0.075 0.008 0.003
Oh Oh Oh Oh
17,000.00 32,000.00 82,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.7 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup ) a. Bahan 0.200 Kg Cat Meni 0.150 Kg Plamir 0.170 Kg Cat Dasar 0.260 Kg Cat Penutup 2 Kali b. Tenaga 0.070 0.009 0.006 0.003
Oh Oh Oh Oh
21,930.00
37,000.00 17,000.00 32,000.00 82,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
14.8 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat Dasar, 3 Lapis Cat Penutup ) a. Bahan 0.200 Kg Cat Meni 0.150 Kg Plamir 0.170 Kg Cat Dasar 0.350 Kg Cat Penutup 2 Kali
Oh Oh Oh Oh
36,710.00
37,000.00 17,000.00 32,000.00 82,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
- 86 -
4,550.00 6,750.00 825.00 275.00 12,400.00 12,400.00
44,090.00
4,550.00 6,750.00 825.00 275.00 12,400.00 34,330.00
7,400.00 2,550.00 5,440.00 21,320.00 36,710.00 4,550.00 810.00 660.00 275.00 6,295.00 6,295.00
7,400.00 2,550.00 5,440.00 28,700.00 44,090.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
2,550.00 5,440.00 13,940.00 21,930.00
7,400.00 2,550.00 5,440.00 21,320.00 36,710.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
b. Tenaga 0.070 0.105 0.004 0.003
2,550.00 5,440.00 13,940.00 21,930.00
4,550.00 810.00 660.00 275.00 6,295.00 43,005.00
7,400.00 2,550.00 5,440.00 28,700.00 44,090.00 4,550.00 9,450.00 440.00 275.00 14,715.00 14,715.00
4,550.00 9,450.00 440.00 275.00 14,715.00 58,805.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2
14.9 1 m2 Pelaburan Bidang Kayu dengan Politur a. Bahan 0.150 Ltr Politur 0.372 Ltr Politur Jadi 2.000 Lbr Ampelas
49,000.00 53,000.00 3,500.00
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
7,350.00 19,716.00 7,000.00 34,066.00
Jumlah Bahan+Tenaga (Rp) 6
7,350.00 19,716.00 7,000.00 34,066.00
b. Tenaga 0.060 0.016 0.003
Oh Oh Oh Oh
Pekerja Tukang Cat Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.10 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter a. Bahan 0.350 Ltr Residu atau Ter
b. Tenaga 0.100
0.006
Oh Oh Oh Oh
34,066.00
45,000.00
Pekerja Tukang Cat Kepala Tukang Mandor
15,750.00 15,750.00
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.11 1 m Pelaburan Bidang Kayu dengan Vernis a. Bahan 0.150 Ltr Vernis 0.050 Kg Dempul 0.100 Lbr Ampelas 0.010 Bh Kuas
5,400.00 1,760.00 275.00 7,435.00 7,435.00
15,750.00
5,400.00 1,760.00 275.00 7,435.00 41,501.00
15,750.00 15,750.00
6,500.00 660.00 7,160.00 7,160.00
6,500.00 660.00 7,160.00 22,910.00
2
b. Tenaga 0.160 0.160 0.016 0.003
Oh Oh Oh Oh
25,000.00 20,000.00 3,500.00 12,500.00
Pekerja Tukang Cat Kepala Tukang Mandor
65,000.00 90,000.00 110,000.00 110,000.00 Jumlah
14.12 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 lapis Cat Dasar, 2 Lapis Cat Penutup ) a. Bahan 0.100 Kg Plamir 0.100 Kg Cat Dasar 0.260 Kg Cat Penutup 2 Kali, mutu C 0.260 Kg Cat Penutup 2 Kali, mutu B 0.260 Kg Cat Penutup 2 Kali, mutu B anti lumut/jamur 0.260 Kg Cat Penutup 2 Kali, mutu A anti lumut/jamur
5,225.00
8,000.00 32,000.00 12,500.00 26,000.00 27,500.00 95,000.00
Cat Mutu C Cat Mutu B Cat Mutu B, anti lumut/jamur Cat Mutu A, anti lumut/jamur b. Tenaga 0.020 0.063 0.006 0.003
Oh Oh Oh Oh
3,750.00 1,000.00 350.00 125.00 5,225.00
Pekerja Tukang Cat Kepala Tukang Mandor
14.13 1 m2 Pengecatan Tembok Lama ( 1 lapis Cat Dasar, 2 Lapis cat Penutup ) a. Bahan 0.120 Kg Cat Dasar 0.180 Kg Cat Penutup 2 Kali, mutu C 0.180 Kg Cat Penutup 2 Kali, mutu B 0.180 Kg Cat Penutup 2 Kali, Mutu B, anti lumut/jamur Cat Mutu C Cat Mutu B Cat Mutu B, anti lumut/jamur b. Tenaga 0.028 Oh Pekerja 0.042 Oh Tukang Cat 0.004 Oh Kepala Tukang 0.003 Oh Mandor
- 87 -
7,250.00 10,760.00 11,150.00 28,700.00
32,000.00 12,500.00 26,000.00 27,500.00
65,000.00 90,000.00 110,000.00 110,000.00
10,400.00 14,400.00 1,760.00 275.00 26,835.00 26,835.00
800.00 3,200.00 3,250.00 6,760.00 7,150.00 24,700.00 7,250.00 10,760.00 11,150.00 28,700.00
65,000.00 90,000.00 110,000.00 110,000.00
Cat Tembok/plafond Mutu C Cat tembok/plafond Mutu B Cat tembok/plafond Mutu B, anti lumut/jamur Cat tembok/plafond Mutu A, anti lumut/jamur
3,750.00 1,000.00 350.00 125.00 5,225.00 10,400.00 14,400.00 1,760.00 275.00 26,835.00 32,060.00
800.00 3,200.00 3,250.00 6,760.00 7,150.00 24,700.00 7,250.00 10,760.00 11,150.00 28,700.00 1,300.00 5,670.00 693.00 275.00 7,938.00 7,938.00 7,938.00 7,938.00 7,938.00
3,840.00 2,250.00 4,680.00 4,950.00 6,090.00 8,790.00 8,340.00
1,300.00 5,670.00 693.00 275.00 7,938.00 15,188.00 18,698.00 19,088.00 36,638.00
3,840.00 2,250.00 4,680.00 4,950.00 6,090.00 8,790.00 8,340.00 1,820.00 3,780.00 462.00 275.00 6,337.00
1,820.00 3,780.00 462.00 275.00 6,337.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
Harga Satuan (Rp) 3
URAIAN
Analisa 1
2 Cat Tembok/plafond Mutu C Cat tembok/plafond Mutu B Cat tembok/plafond Mutu B, anti lumut/jamur
14.14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi a. Bahan 0.100 Kg Meni Besi 0.010 Bh Kuas b. Tenaga 0.020 0.200 0.020 0.010
Oh Oh Oh Oh
6,090.00 8,790.00 8,340.00
42,000.00 12,500.00
Pekerja Tukang Cat Kepala Tukang Mandor
4,325.00
a. Bahan 0.100 0.010 0.002
Kg Meni Besi Bh Kuas M3 Perancah Kayu/Gelam dia. 8
42,000.00 12,500.00 290,000.00
b. Tenaga 0.250 0.225 0.023 0.008
Oh Oh Oh Oh
65,000.00 90,000.00 110,000.00 110,000.00
Pekerja Tukang Cat Kepala Tukang Mandor Jumlah
14.16 10 m2 Cat Semprot minyak Chames Stones ( 1/2 Ducco ) a. Bahan 7.560 Kg Cat Kilat 5.320 Ltr Thinner 5.000 Kg Ross Polac 4.000 Kg Isamu 4.000 Kg Epoxi 4.000 Lbr Amplas Niken 1.000 Ls Alat Bantu / Compressor
Oh Oh Oh Oh
Tukang Cat Kepala Tukang Pekerja Mandor Jumlah
Untuk 1 M2 14.17 1 M2 Cat tembok/Plafond Chames Stone (berkerikil) a. Bahan 0.466 Kg Cat Tembok mutu B, anti lumut/jamur 0.100 Kg Epoxi 0.233 Kg Mill 1.000 Ls Alat Bantu / Compressor b. Tenaga 0.524 0.080 0.400 0.020
929,740.00 92,974.00
Jumlah
Oh Oh Oh Oh
27,500.00 50,000.00 33,000.00 550.00
Tukang Cat Kepala Tukang Pekerja Mandor Jumlah
b. Tenaga 12.000 1.200 2.000 0.100
Untuk 1 M2
Oh Oh Oh Oh
26,054.00
32,000.00 60,000.00 38,000.00 60,000.00 35,000.00 6,500.00 5,500.00
Tukang Cat Kepala Tukang Pekerja Mandor Jumlah Jumlah
- 88 -
16,250.00 20,250.00 2,475.00 825.00 39,800.00 39,800.00
453,500.00 45,350.00
1,300.00 18,000.00 2,200.00 1,100.00 22,600.00 26,925.00
16,250.00 20,250.00 2,475.00 825.00 39,800.00 44,705.00
302,400.00 63,840.00 140,000.00 192,000.00 200,000.00 26,000.00 5,500.00 929,740.00 720,000.00 88,000.00 260,000.00 22,000.00 1,090,000.00 1,090,000.00 109,000.00
720,000.00 88,000.00 260,000.00 22,000.00 1,090,000.00 2,019,740.00 201,974.00
12,815.00 5,000.00 7,689.00 550.00 26,054.00 47,116.80 8,800.00 26,000.00 2,200.00 84,116.80 84,116.80
48,000.00 90,000.00 57,000.00 144,000.00 70,000.00 39,000.00 5,500.00 453,500.00
90,000.00 110,000.00 65,000.00 110,000.00
12,427.00 15,127.00 14,677.00
4,200.00 125.00 580.00 4,905.00
12,815.00 5,000.00 7,689.00 550.00 26,054.00
90,000.00 110,000.00 65,000.00 110,000.00
14.18 10 m2 Cat Melamic a. Bahan 1.500 Kg Wood Filler ( dempul) 1.500 Kg Wood Stain ( pewarna) 1.500 Kg Sanding Sealer ( Cat dasar ) 2.400 Kg Melamic Clear 2.000 Ltr Thinner 6.000 Lbr Amplas Niken 1.000 Ls Alat Bantu / Compressor
1,300.00 18,000.00 2,200.00 1,100.00 22,600.00 22,600.00
302,400.00 63,840.00 140,000.00 192,000.00 200,000.00 26,000.00 5,500.00 929,740.00
90,000.00 110,000.00 65,000.00 110,000.00
Jumlah Bahan+Tenaga (Rp) 6
4,200.00 125.00 4,325.00
4,200.00 125.00 580.00 4,905.00
4,905.00
40,000.00 12,000.00 28,000.00 48,000.00 50,000.00 6,500.00 5,500.00
6,337.00 6,337.00 6,337.00
4,200.00 125.00 4,325.00
65,000.00 90,000.00 110,000.00 110,000.00
Jumlah 14.15 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan perancah
b. Tenaga 8.000 0.800 4.000 0.200
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
47,116.80 8,800.00 26,000.00 2,200.00 84,116.80 110,170.80
48,000.00 90,000.00 57,000.00 144,000.00 70,000.00 39,000.00 5,500.00 453,500.00 1,080,000.00 132,000.00 130,000.00 11,000.00 1,353,000.00 1,353,000.00 135,300.00
1,080,000.00 132,000.00 130,000.00 11,000.00 1,353,000.00 1,806,500.00 180,650.00
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I NO.
URAIAN
Analisa 1 XV
Harga Satuan (Rp) 3
2
Jumlah Bahan+Tenaga (Rp) 6
PEKERJAAN INSTALASI LISTRIK GEDUNG
15.1 1 Titik Pemasangan Saklar Lampu a. Bahan 3.000 btg Pipa listrik 5/8" 24.000 m' Kabel NYA 1,5 mm 3.000 Buah T Duss 4.000 Buah L Bow 3.000 Buah Las dop 1.000 Buah Saklar Ganda 24.000 Buah Klem biasa 1.000 Buah Mangkok 1.000 Buah Fitting b. Upah 1.000
ls
6,000.00 3,900.00 1,200.00 2,500.00 500.00 13,500.00 140.00 1,800.00 9,000.00
Tukang Instalasi listrik
15.2 1 Titik Pemasangan Stop Kontak Biasa a. Bahan 2.000 btg Pipa listrik 5/8" 15.000 m' Kabel NYA 2,5 mm 1.000 Buah T Duss 1.000 Buah L Bow 2.000 Buah Las dop 1.000 Buah Stop kontak biasa 16.000 Buah Klem biasa 1.000 Buah Mangkok
b. Upah 1.000
ls
154,360.00
6,000.00 5,200.00 1,200.00 2,500.00 500.00 6,000.00 140.00 1,800.00
Tukang Instalasi listrik
15.3 1 Titik Pemasangan Stop Kontak AC a. Bahan 25.000 m' Kabel NYM 2 X 2,5 mm 1.000 Buah Stop kontak AC 50.000 Buah Klem biasa
ls
104,740.00
13,000.00 75,000.00 140.00
Tukang Instalasi listrik
15.4 1 Titik Pemasangan MCB a. Bahan 3.000 btg Pipa listrik 5/8" 15.000 m' Kabel NYA 2,5 mm 1.000 Buah T Duss 2.000 Buah L Bow 24.000 Buah Klem biasa 1.000 Buah MCB
b. Upah 1.000
ls
407,000.00
6,000.00 5,200.00 1,200.00 2,500.00 140.00 44,000.00
Tukang Instalasi listrik
149,560.00
85,000.00 85,000.00 239,360.00
12,000.00 78,000.00 1,200.00 2,500.00 1,000.00 6,000.00 2,240.00 1,800.00 104,740.00
85,000.00 85,000.00 85,000.00
85,000.00 85,000.00 189,740.00
325,000.00 75,000.00 7,000.00 407,000.00 85,000.00 85,000.00
85,000.00 85,000.00
85,000.00
492,000.00
18,000.00 78,000.00 1,200.00 5,000.00 3,360.00 44,000.00 149,560.00
85,000.00
Jumlah
85,000.00 85,000.00 85,000.00
325,000.00 75,000.00 7,000.00 407,000.00
85,000.00
Jumlah
18,000.00 93,600.00 3,600.00 10,000.00 1,500.00 13,500.00 3,360.00 1,800.00 9,000.00 154,360.00
12,000.00 78,000.00 1,200.00 2,500.00 1,000.00 6,000.00 2,240.00 1,800.00 104,740.00
85,000.00 Jumlah
b. Upah 1.000
18,000.00 93,600.00 3,600.00 10,000.00 1,500.00 13,500.00 3,360.00 1,800.00 9,000.00 154,360.00
85,000.00 Jumlah
XVI
SATUAN HARGA Jumlah Harga Jumlah Bahan Tenaga (Rp) (Rp) 4 5
18,000.00 78,000.00 1,200.00 5,000.00 3,360.00 44,000.00 149,560.00
85,000.00 85,000.00
85,000.00 85,000.00
85,000.00
234,560.00
PEKERJAAN RANGKA KUDA KUDA IWF a. Bahan 1.150
Kg Besi Baja IWF
b. Tenaga 0.060 0.060 0.006 0.003
Oh Oh Oh Oh
15,750.00
Pekerja Tukang Las Konstruksi Kepala Tukang Mandor
18,112.50
75,000.00 90,000.00 110,000.00 110,000.00
4,500.00 5,400.00 660.00 330.00 18,112.50
- 89 -
10,890.00
29,002.50
NO
URAIAN PEKERJAAN
I. 1. 2. 3. 4.
PEKERJAAN PERSIAPAN Pek. Pembersihan lokasi Pek. Pembuatan bowplank Pek. Gudang direksi / keet Pek. Pagar keliling
II. 1. 2. 3. 4.
PEKERJAAN TANAH DAN PONDASI Pek. Galian Tanah Pek. Volume Pondasi Pek. Timbunan Pasir Pek. Timbunan tanah kembali
III. 1. 2. 3. 3.
PEKERJAAN DINDING Pek. Pasangan dinding 1/2 bata Pek. Plesteran dalam Pek. Plesteran luar Pek. Cat
IV. 1. 2. 3. 4. 5.
PEKERJAAN BETON Pek. Sloof Pek. Kolom Pek. Balok Pek. Plat dag Pek. Kanopy
V. 1. 2. 3.
PEKERJAAN ATAP BAJA Pek. Luas atap Pek. Bubungan Pek. Listplank
VI. 1. 2.
PEKERJAAN PLAFOND Pek. Luas plafond Pek. List plafond
VII. 1. 2. 3. 4. 5.
PEKERJAAN LANTAI Pek. Timbunan tanah dibawah lantai Pek. Timbunan pasir Pek. Cor lantai Pek. Penutup lantai keramik Pek. Flint
VIII.
PEKERJAAN KUSEN PINTU DAN KUSEN JENDELA
VOLUME
144 47 4 48
59.769 31.538 3.995 24.236
281.497 327.902 235.092 562.994
3.125 2.440
1.776 0.720 2.135
109.177 11.170 37.654
76.975 84.45
18.627 14.901 3.725 7.935
1. 2.
Pek. Kusen pintu Pek. Kusen jendela
IX. 1. 2.
PEKERJAAN DAUN PINTU DAN DAUN JENDELA Pek. Daun pintu Pek. Daun jendela
X. 1. 2. 3. 4. 5. 6.
PEKERJAAN KUNCI DAN GANTUNGAN Pek. Engsel pintu Pek. Rel pintu sliding Pek. Kunci taman Pek. Flush handle Pek. Door stop Pek. Grendel
XI. 1. 2. 3. 4. 5. 6. 7.
PEKERJAAN INSTALASI LISTRIK Pek. MCB dan BOX Pek. Titik lampu Pek. Stop kontak Pek. Saklar Pek. Instalasi AC Pek. Instalasi TV Pek. Meteran
XII. 1. 2.
PEKERJAAN SANITASI Pek. Instalasi air bersih Pek. Instalasi air kotor
0.300 0.305
9.517 8.770
1
SATUAN
m2 m' m2 m'
m3 m3 m3 m3
m2 m m
m2 m2
m3 m3 m3 m3 m3
m3 m3
m3 m3
Buah
NO
URAIAN PEKERJAAN
VOLUME
1 I. 1. 2. 3. 4.
2
3
PEKERJAAN PERSIAPAN Pek. Pembersihan lokasi Pek. Pembuatan bowplank Pek. Gudang direksi / keet Pek. Pagar keliling
II. 1. 2. 3. 4.
PEKERJAAN TANAH DAN PONDASI Pek. Galian Tanah Pek. Volume Pondasi Pek. Timbunan Pasir Pek. Timbunan tanah kembali
III. 1. 2. 3.
PEKERJAAN DINDING Pek. Pasangan dinding 1/2 bata Pek. Plesteran dinding Pek. Cat
IV. 1. 2. 3. 4. 5.
PEKERJAAN BETON Pek. Sloof Pek. Kolom Pek. Balok Pek. Plat dag Pek. Kanopy
V. 1. 2. 3. 4. 5.
PEKERJAAN ATAP BAJA Pek. Luas atap Pek. Bubungan Pek. Penutup atap Pek. Rangka atap Pek. Listplank
VI. 1. 2.
PEKERJAAN PLAFOND Pek. Luas plafond Pek. List plafond
VII. 1. 2. 3.
PEKERJAAN LANTAI Pek. Timbunan tanah dibawah lantai Pek. Timbunan pasir Pek. Cor lantai
144 47 4 48
59.769 31.538 3.995 24.236
2.135
4. 5. VIII. 1. 2.
Pek. Penutup lantai keramik Pek. Flint PEKERJAAN KUSEN PINTU DAN KUSEN JENDELA Pek. Kusen pintu Pek. Kusen jendela
0.300
IX. 1. 2.
PEKERJAAN DAUN PINTU DAN DAUN JENDELA Pek. Daun pintu Pek. Daun jendela
9.517
X. 1. 2. 3. 4. 5. 6.
PEKERJAAN KUNCI DAN GANTUNGAN Pek. Engsel pintu Pek. Rel pintu sliding Pek. Kunci taman Pek. Flush handle Pek. Door stop Pek. Grendel
XI. 1. 2. 3. 4. 5. 6. 7.
PEKERJAAN INSTALASI LISTRIK Pek. MCB dan BOX Pek. Titik lampu Pek. Stop kontak Pek. Saklar Pek. Instalasi AC Pek. Instalasi TV Pek. Meteran
XII. 1. 2.
PEKERJAAN SANITASI Pek. Instalasi air bersih Pek. Instalasi air kotor
0.305
8.770
SATUAN 4
HARGA SATUAN (RP) 5
m2
12,000
1,728,000
m'
58,550
2,751,850
m2
653,722
2,614,887
m'
200,243
9,611,647
m3
30,400
1,816,978
3
803,200
25,331,322
3
m
98,600
393,907
m3
14,570
353,119
m
JUMLAH HARGA (RP) 6=5 x 3
m3
10,063,000
3,018,900
3
10,063,000
3,069,215
m3
653,000
6,214,601
3
653,000
5,726,810
m
m
NO
URAIAN PEKERJAAN
VOLUME
SATUAN
ANALISA SATUAN BAHAN
A SATUAN BAHAN
Nama : Meri Anggeraini Kelas : 4 SD Nim : 061630100761
Tabel Perhitungan Volume Rumah Type 70 (estim NO I
Uraian Pekerjaan Pekerjaan Persiapan 1. Pembersihan 2. Pagar Keliling
II
3. Direksi Keet/ Gudang 4.Pemasangan Bowplank Pek. Pondasi 1. Pek. Galian Tanah -Galian Tanah Pondasi A-A Panjang = 48 m -Galian Tanah Pondasi B-B Panjang = 56,32 m 2. Pek Volume Pondasi -Pondasi A-A Panjang = 48 m volume pasangan batu kali volume lantai kerja -Pondasi B-B Panjang = 56,32 m volume pasangan batu kali volume lantai kerja 3. Pek Timbunan Pasir -Timbunan Pasir Pondasi A-A Panjang = 48 m -Timbunan Pasir Pondasi B-B Panjang = 56,32 m
4. Pekerjaan Timbunan Tanah Kembali -Timbunan Pondasi A-A Panjang = 48 m -Timbunan Pondasi B-B Panjang = 56,32 m III
Pek Dinding 1. Pek Pasangan Dinding 1/2 Bata -tinggi dinding = 3,7 m -tinggi dinding = 3,65 m -tinggi dinding = 3,6 m -tinggi dinding = 0,7 m -Tebeng layar Bukaan -Kusen PJ= 1 Unit -Kusen P1 = 2 Unit -Kusen P2 = 3 Unit -Kusen P3 = 2 Unit -Kusen J1 = 1 Unit -Kusen J2 = 3 Unit -Kusen J3 = 1 Unit -Kusen J4 = 2 Unit -Kusen JA1 = 1 Unit -Kusen JA2 = 1 Unit Kolom Kolom K2 ( 15 x 20 ) -tinggi dinding = 3,7 m -tinggi dinding = 3,65 m -tinggi dinding = 3,7 m -tinggi dinding = 3,65 m Kolom KP (15 x 15 ) -tinggi dinding = 3,7 m
-tinggi dinding = 3,65 m Balok - Balok B1( 15 x 20 ) Panjang = 56,45 m Luas Balok + Luas Kolom Luas Pasangan Bata Ringan Luas Dinding Nekto 2. Pek Plesteran Dinding -luas Plesteran Luar -Dinding 1 -Dinding 2 -Dinding 3 -Tebeng layar Plesteran dalam 3. Cat - Cat Luar - Cat Dalam IV
Pek Beton 1. Beton Sloof 15/20 -Panjang = 104, 17 m 2. kolom -kolom k1 (15x40) -kolom k2 (15x20) -kolom kp (15x15)
3. Ring Balok
-Ring Balok 15/20 Panjang = 59,2 m 4. Plat Dak 5. Kanopy -Detail 1 -Detail 2 -Detail 3 -Detail 4 V
Pek Atap Baja 1. Luas Atap Atap 1 -luas datar -miring - luas miring Atap 2 -luas datar -miring - luas miring
VI
VII
2. Bubungan/ Nok 3. Listplank Pek Plafond 1.Luas Plafond 2. List Pek Lantai 1. Timbunan tanah dibawah lantai 2. Timbunan Pasir 3. Cor Lantai 4. Penutup lantai keramik 5. Flint
VIII
Pek Kusen Pintu & Jendela
1. Pek Kusen Pintu - PJ = 1 unit
- P1 = 2 unit
- P2 = 3 unit
2. Pek Kusen Jendela - J1 = 1 unit
- J2 = 3 Unit
- J3 = 1 Unit
- JA1 = 1 Unit
- JA2 = 1 Unit
IX
Pek Daun Pintu & Jendela 1. Pek Daun Pintu - P1 = 3 unit - P2 = 3 unit 2. Pek Daun Jendela
- J = 1 unit - J1 = 1 unit - J2 = 3 Unit - J3 = 2 Unit - J4 = 4 Unit IX
Pek Kunci & Gantungan 1. Engsel - Engsel Pintu = 6 Unit - Engsel Jendela = 5 Unit
XI
XII
2. Kunci Tanam 3. Handle Pintu 6. Door Stop 7. Grendel - Grendel Jendela - Grendel Pintu 8. Tunjang Jendela Pek Instalasi Listrik 1. MCB+BOX 2. Titik lampu - Lampu downlight - Lampu Pijar 18 watt - Lampu Pijar 12 watt 3. Stop Kontak 4. Saklar - Saklar Tunggal - Saklar Ganda - Saklar triple 5. Intalasi Ac 6. Intalasi TV 7. Meteran Pek Sanitasi
1. Instalasi Air Bersih - Kran air - Floor Drain - Shower - Closed Duduk - Kitchen Sink - Meteran Air - Wastaffel - Pompa Air Bersih 2. Instalasi Air Kotor - Bak Kontrol
Tabel Perhitungan Volume Rumah Type 70 (estimasi Biaya) Perhitungan
12 m x 12 m 12 m + 12 m + 12 m + 12 m 2mx2m 12 m + 12 m + 11,5 m + 11,5 m
{( 0,70 m + 0,55 m)/2} x 0,65 m x 48 m volume galian {( 0,95 m + 1,25 m)/2} x 0,65 m x 56,32 m volume galian
{( 0,2416 m + 0,45 m)/2} x 0,50 m x 48 m 0,10 m x 0,55 m x 48 m volume pondasi
{( 0,75 m + 0,333 m)/2} x 0,50 m x 56,32 m 0,10 m x 0,95 m x 56,32 m volume pondasi
0,55 m x 0,05 m x 48 m volume pasir 0,95 m x 0,05 m x 56,32
volume pasir
19,5 m³ - (10,939 m³ + 1,32 m³) volume timbunan tanah kembali 40,269 m³ - (20,599 m³ + 2,675 m³) volume timbunan tanah kembali
3,7 m x 35,9 m 3,65 m x 47,05 m 3,6 m x 2,75 m 0,7 m x 4,75 m 3 x 1/2 x 6,68 m x 2,12 m Luas Bruto {(2,1 m x 1,4 m ) - ( 0,5 m x 0,5 m)} x1 0,90 m x 2,10 m x 2 0,80 m x 2,10 m x 3 0,80 m x 2,10 m x 2 0,80 m x 1,60 m x 1 0,6 m x 1,6 m x 3 1,2 m x 1,5 m x 1 1,2 m x 1,8 m x 2 2,05 m x 0,5 m x 1 0,6 m x 0,5 m x 1 Luas Bukaan
0,20 m x 3,7 m x 2 0,20 m x 3,65 m x 13 0,15 m x 3,7 m x 2 0,15 m x 3,65 m x 6 0,15 m x 3,7 m x 3
0,15 m x 3,65 m x 5 Luas kolom
0,20 m x 56,45 m Luas Balok
281,497m² x 2 (3,7 m x 29,2 m) - 2,16 (3,65 m x 33,03 m) - 15,915 (0,7 m x 4,75 m) 3 x 1/2 x 6,68 m x 2,12 m luas plesteran luar 625,11 m² - 235,092 m² luas plesteran dalam
total cat
0,15 m x 0,2 m x 104,17m 0,15 m x 0,4 m x 2,23 m x 1 0,15 m x 0,2 m x 3,7 m x 2 0,15 m x 0,2 m x 3,65 m x 13 0,15 m x 0,15 m x 3,7 m x 3 0,15 m x 0,15 m x 3,65 m x 5 total
0,15 m x 0,20 m x 59,2 m 0,15 m x 3,20 m x 1,50 m 1,55 m x 0,2 m x 3,8 m 1,38m x 0,2 m x 2,37 m 0,15m x 0,2 m x 2,58 m 0,2 m x 0,15 m x (3,35 m + 0,8 m + 3,35 m)
total
9,02 m x 8,05 m 4,51 m / cos 30° 2 x 8,05 m x 5,208 m 3,515 m x 3,12 m 3,515 m / cos 30° 2 x 4,059 m x 3,12 m luas atap 8,05 m + 3,12 m 8,05 m + ( 2 x 5,208 m) + 8,05 m + ( 3,12 m - 0,75 m) + (5,028 m + 0,62 m ) + 3,12 m
Luas Bangunan =74,506 74,506 m² x 0,25 m Luas Bangunan =74,506 74,506 m² x 0,2 m Luas Bangunan =74,506 74,506 m² x 0,05 m
0,1 m x ( 84,45 m - 5,1 m)
1,4 + 1,6 + 2,1 (2) + 0,55 = 7,75 m' 7,75 x 0,07 x 0,13 x 1 = 0,071 m³
2,1 m (2) + 0,9 m = 5,1 m' 5,1 x 0,07 x 0,13 x 2 = 0,093 m³
2,1 m (2) + 0,8 m = 5 m' 5 x 0,07 x 0,13 x 3 = 0,137 m³ total
0,8 m (3) + 1,6 m (2) = 5,6 m' 5,6 x 0,07 x 0,13 x 1= 0,051 m³
0,6 (2) + 1,6 (2) = 4,4 m' 4,4 x 0,07 x 0,13 x 3 = 0,120 m³
1,5 m (3) + 1,2 m (2) = 6,9 m' 6,9 x 0,07 x 0,13 x 1 = 0,063 m³
2,05 m (2) + 0,5m (3) = 5,6 m' 5,6 x 0,07 x 0,13 x 1 = 0,051 m³ 0,6 m (2) + 0,5 m (2) = 2,2 m' 2,2 x 0,07 x 0,13 x 1 = 0,020 m³ total
0,82 m x 2,06 m x 3 0,72 m x 2,06 m x 3 total
0,47 m x 1,52 m x 1 0,47 m x 0,72 m x 1 1,52 m x 0,52 m x 3 1,42 m x 0,55 m x 2 1,72 m x 0,55 m x 4 total
6x3 7x2
Total
Satuan
Volume
m2 m'
144 48
m2 m'
4 47
m3
19.500
m3
19.500
m3
40.269
m3
40.269
m3
8.2992
m
2.64
m3
10.939
m3
15.249
m3
5.350
m3
20.599
m3
1.32
m3
1.32
m3
2.675
3
m3
2.675
m3
7.241
m3
7.241
m3
16.995
m3
16.995
m2
132.830
m2
171.733
2
m
9.900
m2
3.325
m2
21.242
m2
339.030
m2
2.690
2
m
3.780
m2
5.040
m2
3.360
2
m
1.280
m2 m² m² m² m²
2.880 1.800 4.320 1.025 0.300
m2
26.475
m2
1.480
m2
9.490
2
m
1.110
m2
3.285
m2
1.665
m2
2.738 19.768
m2
11.290
m2
11.290
m2
31.058
m2
312.555
m2
281.497
m2
562.994
m2
105.880
m2
104.645
m
3.325
m2
21.242
m2
235.092
m2
327.902
m2
327.902
m2
235.092
m2
327.902
m2
562.994
m3
3.125
m3
0.134
m3
0.222
m3
1.424
m3
0.250
m3
0.411 2.440
2
m3
1.776
m3
0.720
m3
1.178
m3
0.654
3
m
0.077
m3
0.225
2.135
m2 m
72.611 5.208
m2
83.849
m2 m
10.967 4.059
m2
25.328
m2 m m
109.177 11.170 37.654 76.975 84.45
m2 m3
18.627
m2 m3
14.901
m2 m3
3.725
m2
7.935
m3
0.071
m3
0.093
m3
0.137 0.300
m3
0.051
m3
0.120
m3
0.063
m3
0.051
m3
0.020 0.305
m2
5.068
m2
4.450 9.517
m2
0.714
m2
0.338
m2
2.371
m2
1.562
m2
3.784 8.770
Buah
18
Buah
14
Buah
32
Set Set Set
6 6 6
Set Set Set
8 9 20
Buah
1
Buah Buah Buah Buah
15 17 2 22
Buah Buah Buah Buah Buah Buah
2 5 4 3 4 1
Buah Buah Buah Buah Buah Buah Buah Buah
2 2 2 2 1 1 1 1
Buah
1