Customer
:
TATA PROJECTS LIMITED
Project
:
STANDARD QUALITY ASSURANCE PLAN for (BUS DUCT-SPBD)
Consultant : S.No. 1.0
1.1
STAGE / COMPONENT OPERATION
Approved Contract Drawings and Rev.Control
Erection Key Drawings
2.0
Raw Materials
2.2
3.0
TYPE / METHOD OF CHECK
EXTENT OF CHECK
Bus Duct layout
Major
Verification
100%
Structure Layout
Major
Verification
100%
Sub-Assembly Details
Major
Verification
100%
REFERENCE DOCUMENTS
ACCEPTANCE NORMS
Rev.No.: 0 Date: FORMAT OF RECORD
INSPECTION BY SUB-VENDOR / MFR.
TPL
CUSTOMER /TPIA
P
R
R
P
R
R
P
R
R
P
R
R
P
R
R
P
R
R
P
R
R
P
R
R
REMARKS
Engineering Review
1.2
2.1
CATEGORY
CHARACTERISTICS
Doc No: TPL / QMD / Mech / SQAP /00
Aluminium Alloy Sheets / Laminations
Equipment Termination Drawings Guaranteed Technical Particulars
Drawing Approval Major
Verification
100%
Major
Verification
100%
Cross Section Drawing
Major
Verification
100%
Bus Duct
Major
Verification
100% Drawing Approval
Customer / Design Approval
Customer / Design Approval
Approved Drawing Approved Drawing Approved Drawing Approved Drawing Approved Drawing Approved Drawing Approved Drawing Approved Drawing
Structure
Major
Verification
100%
Surface Finish
Major
Visual
100%
IR
P
R
R
Dimensions
Major
Measurement
10%
IR
P
R
R
Chemical Composition
Major
Chem. Analysis
1 / Lot
MTC
P
R
R
Electrical Conductivity, Grade
Major
Verification
1 / Lot
MTC
P
R
R
% of Elongation
Major
Testing
1 / Lot
MTC
P
R
R
Tensile Strength
Major
Testing
1 / Lot
MTC
P
R
R
Surface Finish
Major
Visual
100%
IR
P
R
R
Dimensions
Major
Measurement
10%
IR
P
R
R
Chemical Composition
Major
Chem. Analysis
1 / Lot
MTC
P
R
R
Electrical Conductivity, Grade
Major
Verification
1 / Lot
MTC
P
R
R
% of Elongation
Major
Testing
1 / Lot
MTC
P
R
R
Tensile Strength
Major
Testing
1 / Lot
MTC
P
R
R
Surface Finish
Major
Visual
100%
IR
P
R
R
Dimensions
Major
Measurement
100%
IR
P
R
R
Hardness
Major
Testing
Sample
MTC
P
R
R
Aluminium Extrusions
PO, IS-5082, IS-737 & PO, IS-5082, IS-737 & Approved Specification Approved Specification
PO, IS-5082 & Approved PO, IS-5082 & Approved Specification Specification
Components
Rubber Bellows (Visual & Dimensions)
PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet
3.1
Rubber Bellows (Routine Tests) She:1of5
Customer
:
TATA PROJECTS LIMITED
Project
:
STANDARD QUALITY ASSURANCE PLAN for (BUS DUCT-SPBD)
Consultant : S.No.
STAGE / COMPONENT OPERATION
3.1
Rubber Bellows (Routine Tests)
3.2
Gaskets (Visual & Dimensions) Gaskets (Routine Tests) Insulators (Epoxy) (Visual & Dimensions)
3.3
Insulators (Epoxy) (Routine Tests)
Insulators (Epoxy) (Type Tests)
3.4
3.5
Paints
Cu. Flexible
CATEGORY
TYPE / METHOD OF CHECK
EXTENT OF CHECK
IR Test
Major
Testing
10%
Aging Test
Major
Testing
Flame Test
Major
Compressibility Surface Finish
CHARACTERISTICS
REFERENCE DOCUMENTS
Doc No: TPL / QMD / Mech / SQAP /00
ACCEPTANCE NORMS
Rev.No.: 0 Date: FORMAT OF RECORD
INSPECTION BY SUB-VENDOR / MFR.
TPL
CUSTOMER /TPIA
MTC
P
R
R
Sample
MTC
P
R
R
Testing
Sample
MTC
P
R
R
Major
Measurement
Sample
IR
P
R
R
Major
Visual
100%
IR
P
R
R
IR
P
R
R
PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet
PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet
REMARKS
Dimensions
Major
Measurement
100%
Hardness
Major
Testing
Sample
MTC
P
R
R
Surface Finish
Major
Visual
100%
IR
P
R
R
Dimensions
Major
Measurement
10%
IR
P
R
R
Creep age Distance
Major
Testing
Sample
MTC
P
R
R
IR Test
Major
Testing
100%
MTC
P
R
R
100 Mohm
Dry powder freq.Voltage
Major
Testing
100%
MTC
P
R
R
NO Flashover
Mechanical Strength (Compression & Cantilever)
Major
Testing
Sample
MTC
P
R
R
Rating Type
Major
Testing
Sample
MTC
P
R
R
Impulse Test
Major
Testing
Sample
MTC
P
R
R
Temperature Cycle Test
Major
Testing
Sample
MTC
P
R
R
Partial Discharge Test
Major
Testing
Sample
MTC
P
R
R
Finish
Major
Visual
100%
IR
P
R
R
Shade
Major
Visual
100%
IR
P
R
R
MTC / IR
P
R
R
MTC / IR
P
R
R
MTC / IR
P
R
R
IR
P
R
R
MTC
P
R
R
MTC
P
R
R
Viscosity
Major
Testing
Sample
Flash Paint
Major
Testing
Sample
All Routine Test
Major
Testing
Sample
Dimension
Major
Measurement
100%
Flexibility
Major
Visual
1 / Lot
Plating Finish
Major
Verification
100%
PO, IS-9431, Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
PO, IS-9431, Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet 25 mm in any Plane PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet
She:2of5
Customer
:
TATA PROJECTS LIMITED
Project
:
STANDARD QUALITY ASSURANCE PLAN for (BUS DUCT-SPBD)
Consultant : S.No. 3.5
3.6
STAGE / COMPONENT OPERATION Cu. Flexible
Space heater / Thermostat
3.7
Adopter Box
4.0
In Process Inspection
4.1
4.2
4.3
5.0
CATEGORY
TYPE / METHOD OF CHECK
EXTENT OF CHECK
Chemical composition
Major
Verification
1 / Lot
Electrical Conductivity
Major
Measurement
1 / Lot
Visual, Rating, Type
Major
Visual
100%
CHARACTERISTICS
Functional Test
Major
Testing
100%
IR, Hv
Major
Testing
100%
Visual & Dimension
Major
Visual & Measurement
100%
Dimensions
Major
Measurement
100%
Finish
Major
Visual
100%
Major
Visual
100%
Major
Scrutiny & Physical Test
100%
DP Test on Fillet t (Bus bar & Expansion t weld)
Major
Testing
100%
RT on Butt weld ts (Enclosures)
Major
Testing
10%
Surface Preparation & Primer Application
Major
Visual
100%
Uniformity and Coverage
Major
Visual
100%
Fabrication of Drilling & Dressing Enclosures, Bus bars, & Weld Inspection Al.Flexibles
Painting of Enclosure and Bus bar
IS-191 / Approved Specification IS-191 / Approved Specification
ACCEPTANCE NORMS
IS-191 / Approved Specification IS-191 / Approved Specification
PO, Approved Drawing PO, Approved Drawing & Approved Datasheet & Approved Datasheet
Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet Approved Drawing & Approved Datasheet Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet Approved Drawing & Approved Datasheet Approved Drawing & Approved Datasheet
Approved Procedure
Approved Procedure
ASTM E 165 & Approved Procedure ASME Sec.V & Approved Procedure
ASME Sec.VIII Div.I & Approved Procedure ASME Sec.VIII Div.I & Approved Procedure
Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
Rev.No.: 0 Date: FORMAT OF RECORD
INSPECTION BY SUB-VENDOR / MFR.
TPL
CUSTOMER /TPIA
MTC
P
R
R
MTC / IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
Dry Film Thickness (DFT)
Major
Measurement
100%
Colour / Shade
Major
Verification
100%
IR
P
R
R
Adhesion Test
Major
Testing
1 / Lot
IR
P
R
R
Tightness of s
Major
Measurement
100%
IR
P
R
R
Clearances
Major
Measurement
100%
IR
P
R
R
Surface Preparation for t
Major
Visual
100%
IR
P
R
R
Tightness of ts
Major
Measurement
100%
IR
P
R
R
Major
Measurement
Random
IR
P
W
W
Major
Measurement
Random
IR
P
W
W
Bus bar Assembly
Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
REMARKS
WPS / PQR / WPQ shall be submitted for Review.
Final Inspection
Bus bar span distance Phase to Phase & Phase to Earth clearance
5.1
REFERENCE DOCUMENTS
Doc No: TPL / QMD / Mech / SQAP /00
Bus Ducts (Visual / Dimensions / Testing)
Approved Drawing & Approved Procedure
Approved Drawing & Approved Datasheet
She:3of5
Customer
:
TATA PROJECTS LIMITED
Project
:
STANDARD QUALITY ASSURANCE PLAN for (BUS DUCT-SPBD)
Consultant : S.No.
5.1
5.2
5.3
5.4
5.5
STAGE / COMPONENT OPERATION
Bus Ducts (Visual / Dimensions / Testing)
Routine Test
Type Test
MS structures (Hot Dip Galvanized)
Packing and Dispatch
CATEGORY
TYPE / METHOD OF CHECK
EXTENT OF CHECK
Surface Finish & Workmanship
Major
Visual
100%
Erection & Direction Marking
Major
Visual
100%
Paint Shade, uniformity
Major
Visual & Measurement
100%
CHARACTERISTICS
DFT & Peel of Test
Major
Adhesion Test
Major
Space Heater wiring Functional Test (HV & IR)
Major
PF Voltage withstand Test
Major
IR before and after HV Test
Major
Water & Air Tightness Test (Degree of Protection)
Major
Mill Volt Drop Test
Major
Short Time Current Test
Major
Final Documentation
Verification Testing & Measurement Testing & Measurement Testing & Measurement
P
W
W
IR
P
W
W
IR
P
W
W
Sample
IR
P
W
W
Sample
IR
P
W
W
100%
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
R
R
IR
P
R
R
IR
P
W
W
IR
P
R
R
IR
P
W
W
IR
P
W
W
IR
P
W
W
IR
P
R
R
IR
P
R
R
IR
P
R
R
IR
P
R
R
Dimensions
Major
Measurement
100%
Surface Finish
Major
Visual
100% 2 Sample / Lot
Measurement
Hammer Test
Major
Testing
striping Test
Major
Testing
Preece Test
Major
Testing
Cleaning of the Duct
Major
Measurement
Covering of Silver plated Area
Review of all the stages of documents
Major Major Major
100%
100% 2 Sample / Lot 2 Sample / Lot 2 Sample / Lot
IS-8084 / Approved Datasheet
IS-8084 / Approved Datasheet
Approved Drawing & Approved Datasheet
Approved Drawing & Approved Datasheet
IS-4759 & Approved data sheet Approved drawing & Approved data sheet
IS-4759 & Approved data sheet Approved drawing & Approved Specification
IS-2629 & Approved data sheet
IS-2629 & Approved data sheet
IS-2633 & Approved data sheet
IS-2633 & Approved data sheet
Approved Drawing & Approved Procedure
Approved Drawing & Approved Procedure
Approved drawing & Approved data sheet
Approved drawing & Approved Specification
100%
Visual
100%
Measurement
2 Sample / Lot
Verification
Approved Drawing & Approved Datasheet
100%
Sample / Lot
Major
Approved Drawing & Approved Procedure
28 KV / Approved 100% No Flashover Datasheet 100 M ohm / Approved 100 M ohm / Approved 100% Datasheet Datasheet IS-8084 / Approved IS-8084 / Approved Sample / Lot Datasheet Datasheet IS-8084 / Approved IS-8084 / Approved 1 / Rating Datasheet Datasheet
Verification
Testing
INSPECTION BY
IR
Major
Major
FORMAT OF RECORD
CUSTOMER /TPIA
Impulse Test
Weight & Uniformity of Zinc coating
Date:
TPL
Major
Galvanizing Thickness
ACCEPTANCE NORMS
Rev.No.: 0
SUB-VENDOR / MFR.
Temperature rise Test
Covering of shipping sections 5.6
Testing & Measurement Testing & Measurement Testing & Measurement Testing & Measurement Testing & Measurement
REFERENCE DOCUMENTS
Doc No: TPL / QMD / Mech / SQAP /00
100%
REMARKS
Similar rated Bus duct Type test conducted in third party lab report to be verified.
She:4of5
Customer
:
TATA PROJECTS LIMITED
Project
:
STANDARD QUALITY ASSURANCE PLAN for (BUS DUCT-SPBD)
Consultant : S.No.
5.7
STAGE / COMPONENT OPERATION
CHARACTERISTICS
CATEGORY
TYPE / METHOD OF CHECK
EXTENT OF CHECK
REFERENCE DOCUMENTS
Inspection Release Note (IRN) or ACRN
Doc No: TPL / QMD / Mech / SQAP /00
ACCEPTANCE NORMS
Rev.No.: 0 Date: FORMAT OF RECORD
INSPECTION BY SUB-VENDOR / MFR.
TPL
CUSTOMER /TPIA
P
H
H
REMARKS
Note's
Legend: H= Hold, W= Witness, P= Perform, R= Review of Documents, IR= Inspection Report, TR= Test Reports, ACRN= Acceptance-Cum-Release Note, Mfr = Manufacturer, UT = Ultrasonic Testing, RT = Radiography Testing, Testing, MT - Magnetic Testing, TPL = Tata Projects Limited, TPIA = Third Party Inspection Agency
Prepared by
Reviewed by
Reviewed by
Approved by
S. SIVA RAMA KRISHNA Sr. Engineer - QMD
GSV MANIKYALA RAO QA Coordinator- QMD
Projects
GVRRN ACHARYULU Head- QMD
PT = Penetrant
She:5of5