Taurus Powertronics – Presentation WELCOME TO ALL TANTRANSCO OFFICIALS
Taurus Confidential Document
9/5/15
Comprehensive Bouquet of Product Offline Overhead Transmission Line Analyser System
Offline Overhead HVDC Line Analyser System Offline Overhead Distribution Line Analyser System DC Earth Fault Locator Tower Footing Earth Impedance Tester Earth Tester Insulation Analyser upto 30kV Corona Imaging Camera SF6 Gas Leak Detector Taurus Confidential Document
9/5/15
DC Earth Fault Locator
Application: •
To Locate Earth Faults / Earth leakages in floating DC system of a power station.
Taurus Confidential Document
9/5/15
DC Floating System In Generation and Transmission substations the
entire system of the DC Source along with connecting cables, battery charger and control equipment forms DC floating system i.e. at no point it is electrically connected to earth.
Taurus Confidential Document
9/5/15
Problems with Earth fault on a DC Floating System
In case of a earth fault either in positive or negative
due to a cable damage or insulation failure the entire control system gets electrically connected to earth and no more remains a floating system Further, a fault happening to this earthed system in the opposite polarity results in overloading of DC source, which results in cable burning and disruption of power to the control equipment and also malfunctioning of DC System may occur.
Taurus Confidential Document
9/5/15
Healthy DC System single line Diagram
X k LOAD
BATTERY
CHARGER
X k
Taurus Confidential Document
9/5/15
DC System with Positive fault
Y k
Battery
Charger
Load
X k X k
Equivalent CKT Y k LOAD
Battery
X k
Charger X k
Taurus Confidential Document
9/5/15
DC System with Negative fault X k Battery
Load
Charger X k
Y k
Equivalent CKT X k Load
Battery
Charger Y k
Taurus Confidential Document
9/5/15
X k
Principle of Operation Injects low frequency coded pulses into the DCDB
main bus. Injected signal is traced using receiver unit. Once there is a ground fault, the injected signals will get a closed loop to the transmitter ground through fault ground The systematic approach of noting where pulses have been detected, then moving down the feeder up to the point where pulses are not detected, pinpoints the ground fault location. Taurus Confidential Document
9/5/15
DC Earth Fault Locator along with accessories
Transmitter Unit
15 sq.mm sensor CT
Receiver Unit
50 sq.mm sensor CT
Taurus Confidential Document
Two core connecting cable
DCDB Connecting Cable
9/5/15
Earthing Cable
Connection Diagram Batter y Bank
Negative Bus Connection Positive Bus Connection Station Ground
Charge r
Taurus DC Transmitter Unit Taurus Confidential Document
Fault Indicatio n
Taurus DC Receiver Unit
Faul t 9/5/15
Relay
No Fault Indicatio n
Demo Pic
Taurus Confidential Document
9/5/15
Demo Pic
Taurus Confidential Document
9/5/15
Demo Pic
Taurus Confidential Document
9/5/15
USP/Product Highlights Online fault finding Automatic Capacitance Balancing Multiple fault detection Detection of point of mixing in dual Battery system Noise and harmonics suppression Exactly pin points the fault Long duration, service free rechargeable battery Additional filters in Receiver Unit for AC Noise Suppression for
trouble free operation in Generating Station Complies & certified as per IEC 61000-4-2, IEC 61000-4-3, IEC 61000-4-8, IEC 60068-2-6, IEC 60068-2-27, IEC 60068-2-78 IP67 Protection (Pelican casing)
Taurus Confidential Document
9/5/15
Specifications Resistance Range: Up to 400K Ohms Suitable for DC floating system from 48 to 300V DC Sensitivity < 1mA Output Voltage: Auto selectable Power Supply: Built in Rechargeable Battery Sensor probes: 2 nos. of 15 & 50 sg. mm Fault distance: Up to 3KM. Input signal: LF/LV Pulse
Taurus Confidential Document
9/5/15
s NTPC State Generating companies Private Generating Companies POWERGRID State Transmission Companies private Transmission Companies Captive Power Plants Process Industries Mining Industries Railways Taurus Confidential Document
9/5/15
Case Study
Taurus Confidential Document
9/5/15
Case Study - 1 Customer: Rourkela Steel Plant. Customer Problem: Problem in 220V system, with voltage conditions as SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
1
0
220
220
Taurus Confidential Document
9/5/15
Fault Tracing With our kit, it was found that feeder no.M9 was
having earth fault. Further traced in sub feeder we found Fault in Relay of bay three. But after all these exercises we found no improvement in the voltage. Once again we started with the DCDB and feeder No M10 was showing faulty. After isolating the same system voltage got balanced. SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
1
110
110
220
Taurus Confidential Document
9/5/15
Case Study - 2 Customer: JSPL. Demo Place: JSPL, Angul. Customer System Status: SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
1 2
130 130
100 100
230 230
After testing each feeders in both the sources below mentioned
feeders found to be faulty. S-1=2F-A, 5R-C,5R-D and 1R-D. S-2=2F-A,5R-C,5R-D and 1R-E. Customer preferred to switch off the feeders due to lack of coordination with other Team. After Switching them OFF system voltage got balanced. Taurus Confidential Document
9/5/15
Case Study - 3 Customer: EMCO ENERGY LTD. Demo Place: 600MW Thermal Power Plant, Warora.
Customer System Status: SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
1
0
220
220
Taurus Confidential Document
9/5/15
Positive Dead Fault After testing each feeder for fault, its finally found in
feeder No. 2.4F which was feeding 6.6KV Control . Feeder C1A of 6.6KV Control found to be faulty. Tracing further through inside circuitry found insulation damage on the wire connected between Relay and CB. After improving its insulation with help of a insulation Tape system voltage got balanced. Taurus Confidential Document
9/5/15
Taurus Confidential Document
9/5/15
Case Study - 4 Customer – CESC Ltd. Demo Place- 750MW BBGS, Kolkata. Equipment was tested on Unit-3 220V DCDB.
SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
DCDB Unit#3
239
1
240
Taurus Confidential Document
9/5/15
Negative Dead Fault Each feeder was tested for earth fault and fault found
in feeder No’s 14F-B & 14F-D. Both the above feeders were feeding unit#3 6.6KV Bus Transfer . And further traced to a ABB make SUE 3000 HMI Unit (A monitoring system). Visibly able to identify the carbon deposition on the front door display unit (power circuitry). After replacing it with a new one , system voltage got improved. Taurus Confidential Document
9/5/15
System Voltage after Fault rectification Unit is replaced with a new one and observed the
improved voltage level.
SOURCE
Positive to Ground
Negative to Ground
Positive to Negative
DCDB Unit#3
124
116
240
Taurus Confidential Document
9/5/15
Taurus Confidential Document
9/5/15
THANK YOU FOR YOUR VALUABLE TIME
FOR APPLICATION Mr. Ganapathy M-Sr.Technical Engineer No:09900046970 Taurus Confidential Document
9/5/15