Incident ReportReport Incident For Internal Use Only Report Date: Feb. 12, 2014 Start Date: Feb. 12, 2014 Report Number: 1 I. Problem Definition What: Unit #7 Tripped When: 1/1/2013 @ 10:14 am Where: HTPS Significance: Costs of Maintenance & Lost Revenues of 29,000 JD Safety: N/A Environment: Gas Emissions, Noise from Startup Revenue: -20,000 JD Availability Cost: 9,000 JD Maintenance Spare Parts Used & Startup Costs Frequency: Once II. Executive Summary Unit #7 Tripped, caused by C.B. opened, caused by 86U activated, caused by electrical generator protection, caused by AVR system failed, caused by 60-90 relay operated, caused by 90 lead relay operated, caused by frequency converter failed, caused by no maintenance & Aging. III. Solutions Causes Causes Frequency Converter Failed No Maintenance No Maintenance No Maintenance
Aging
IV. Team Name Sultan Al-Sharary Ahmad Al-Ghodran Shehadeh Seaifan Izzeddeen Rabbaa Hasan Al-Salhi I&C Section Head V. Notes
Solutions Solutions Frequency Converter Replacement Implementing New PM schedule Check Further Maintenance from OEM Check Further Maintenance from Electronics Section Using Air Conditioning for the AVR to cool down electronic components to increase life expectancy
Owner Owner Shehadeh Seaifan
Due Date Feb. 12, 2014
Shehadeh Seaifan
Feb. 19, 2014
Shehadeh Seaifan
Feb. 19, 2014
I&C Section Head
Feb. 19, 2014
Shehadeh Seaifan
Feb. 19, 2014
Email Email
[email protected]
Member Member Info Info Electrical Protection Section Head HTPS Plant Manager HTPS Electrical Maintenance Section Head HTPS HSE Engineer HTPS Shift Charge Engineer
1. The Realitychart and Incident Report have been finalized. 2. Some causes have been purposefully left off the chart. VI. References 1. Deleted