RfX Process Training RfX definitions & process Bonn, 28. April 2008
RfX stands for a series of tactical processes that allow buyers and sellers to conduct business. The abbreviations stands for „Request for …“ Definition of the RfX process
Demand
RfX internal client
Contract
purchasing professional
Commonly used RfX processes A set of general processes or mechanisms that provide a structured way for buyers and suppliers to interact with each other and conduct business: often the exchange of specific items or services for a specific price, but also the exchange of information, such as capabilities or willingness.
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
RfD – Request for Demand RfI – Request for Information RfP – Request for Proposal RfQ – Request for Quotation RfB – Request for Bid Negotiations
Page 2
Through clarification and bundling of demand in an organisation, an internal Request for Demand can greatly enhance the value obtained from an RfX Process Definition of the RfD / Request for Demand process
“
!
“
”
internal client
purchasing professional
The RfD aims to understand internal demand & needed requirements and addresses the stakeholders.
Source: BrainNet
?
”
What kind of a laptop?
Target groups, specifications?
How many?
Is there more demand in the company?
Can demand be bundled or otherwise managed?
BrainNet “Purchasing 101” Training : DRAFT
Page 3
Request for Information (RfI) provide a way to research the supplier market before a binding RfP/RfQ/RfB is issued Definition of RfI
“hmm …” purchasing professional
A Request for Information (RfI) is a way for buyers to gather information about prospective suppliers and the items they can provide. Buyers often use the information gathered by an RfI as input for deg a future sourcing activity, i.e. as an initial stage of a multistage RfX activity. Benefits identification of interested sellers
Source: BrainNet
match between products requested and offered
info about current market trends & history
typical delivery conditions
identification of problems with provided product specs
BrainNet “Purchasing 101” Training : DRAFT
Page 4
RfI is particularily helpful in case of first-time purchases, where internal know-how is not yet available When to use RfI
“hmm …”
Typically designed as a questionnaire for suppliers to complete
Suppliers generally indicate interest, without entering prices, quantities, or any other specific item .
However: general information about price ranges can be asked to the business case
Can be augmented by telephone discussions / personal meetings
RfI results in no contractual obligation
purchasing professional
When to use RfI? first-of-a-type purchase
little information about suppliers
complex products
product specification perceived as incomplete – internal client without expertise
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 5
Subsequent RfX stages can be seen as quality gates that not only ensure lowest possible price but also quality of the product. Sample supplier screening process First set of criteria: Company size Relevant experience General quality levels Some suppliers may have a “preferred bidder status” Second set of criteria
First stage filter e.g. RfI
Source: BrainNet
Second stage filter
Final negotiations
e.g. RfP / RfQ / Auction
BrainNet “Purchasing 101” Training : DRAFT
Price Non-price issues (organisation, operations / quality, systems, strategic fit)
Page 6
RfPs/RfQs are the most widely used RfX processes. Definition of RfP/RfQ
“
“
”
€
purchasing professional
suppliers
Description of the buyer's specific needs.
Request for pricing and delivery proposal.
Additionally, an extensive questionnaire is used, so that thebuyer can determine the capabilities and flexibility of potential suppliers.
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
”
Proposal collection is typically a sealed process, where participants know very little if anything about other participants and the proposals they submit.
Page 7
The RfP and RfQ are often used interchangeably and there is a great confusion in the field as to their definition. There are some subtle differences, though. Differences between RfP and RfQ process Request for Proposal
Source: BrainNet
Request for Quotation
Best suited for more complex products / services, where price is just one of the factors General structure provided, however suppliers can extend the offer with extras More of a “here’s my problem, give me a solution with price” approach.
RfP vs
Used for straightforward situations, where price plays the key role
Product is well known and can be described in detail
Rigid structure, suppliers merely to provide price with some background information
Can be a follow-up to an RfP
RfQ
More difficult to compare offers.
BrainNet “Purchasing 101” Training : DRAFT
Page 8
Overview RfP process RfP Criteria Definition Commercial Price Quality Warranty Maintenance Supplier ability Technical Specifications Drawings Configurations
RfP Generation Cover letter Commercial information Technical information Additional information & conditions
RfP Distribution Supplier notification RfP distribution Supplier communication RfP communication RfP return
Response guidelines Response from
RfP Return Analytical tool development Quotes analysis and benchmarking Best case savings calculation Non-price criteria evaluation and scoring
Catalogue
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 9
The RfP Process should be managed as if it were a separate project Hints and tips for the RfP process
Plan a schedule and stick to it Schedule adequate time for collection of internal information, i.e. drawings, specifications, and other requirements Proofread RfP packages before issuing them to suppliers Schedule adequate time for suppliers to respond to the level of detail required (Be careful not to overcompensate) Keep a log of pertinent information, eg. date RfP issued, date received, questions asked by suppliers, subsequent answers and how it is communicated to the bidding community Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 10
There is no set RFP format, however, there are recommendations on formats that have been successful Introduction
Overview
Goals of the RFP Process
Rules of the RFP
Request for Proposal Objectives
Information
References Request for Proposal Background Information
Source: BrainNet
Financial Position and Performance
Primary Markets Served
Production Facilities
Procurement Information
Negotiating Team
Quality Data BrainNet “Purchasing 101” Training : DRAFT
Request for Proposal Background Information (ctd.)
Quality Data
Inventory & Inventory Management
Cost Reduction Opportunities
Performance Measurement and Reporting ()
Request for Proposal Pricing Information
Pricing
Future Pricing
Payment Issues
Discounts & Rebates
Page 11
Suppliers have to be managed during the RfP process Hints and tips for the RfP process
Alert suppliers as to RfP issuance and expected timeline.
Target the appropriate senior management at the supplier organization.
Ensure executive management at supplier is involved if sourcing group spend is significant and complex.
It may be helpful to distribute the RfP to suppliers (senior and executives) during a Supplier conference explaining the process and expectations.
Source: BrainNet
Suppliers must comply with the requested format, diversions make it more difficult to evaluate and consume time.
Once RfP’s are issued, respond back to all suppliers for any questions received. This promotes fairness in the process and minimizes redundant questions.
Irrelevant questions or areas to be discussed during negotiations should be identified and appropriately differed.
BrainNet “Purchasing 101” Training : DRAFT
Page 12
The supplier orientation meeting / supplier conference is an important step in the process, an opportunity for two-way dialog Directions for organising a supplier conference Purpose Convey the total scope of the sourcing project to all suppliers Get the “Key Messages” out to everyone and ensure understanding Time saving (no need to repeat the message to each separately) Attendees Senior/Executive management of suppliers selected Sourcing Team + other involved stakeholders Shows to the suppliers that not Procurement alone but also other departments agree with the objectives and content of the RFP (supplier won’t be able to play them off against each other) Topics for Discussion Overall procurement strategy Sourcing Teams objectives and goals History of market, category breakdown, cost structure Review the Request for Proposal Expectations for completed RFP
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 13
RfP responses can be evaluated quickly and efficiently provided that you enforce reply standards in the RfP Steps in RfP evaluation
Compile all data in a database Reveal cost, capacity and capability Narrow the scope of potential suppliers Prepare the team for negotiations Look for new discoveries Identify areas where suppliers differentiate Check the results
DESIGN YOUR RFP WITH THE END RESULT IN MIND! If you don’t specify the format for answers / prices, every supplier will do it differently and it will take you weeks to collate the data and compare them! Apart from the proposal in the standard format, request that the suppliers enter the prices in an Excel template you sent them. Failure to comply = Exclusion from RfX
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 14
Several models for RfP Evaluation/Comparison exist RfP evaluation methodologies
Weighted rating Arithmetic result Key differentiators Stress test (Weight, Rating)
+/x
Model supplier (Best of Best) Killer criteria Key functions/criteria Threshold values (min/max)
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 15
Request for Bid (RfB) is issued when the buyer decided to use a reverse auction as a primary sourcing method Definition of an RfB
€5
€3
€ purchasing professional
suppliers
Detailed description of buyer’s needs is presented to the bidding participants (respondents) Price, quantity, quality (specs), delivery time, starting price Buyer determines the parameters of the auction
Suppliers present price offers Lowest-priced offer usually wins
Auction type, start price, time, communication tools Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 16
Auctions are most beneficial in case of generic products in competitive environments. Application and benefits of auctions Benefits €5
€3
Objective decision of contract awarding
Detailed overview / comparison of prices (including partial price comparisons)
Market price determination
When to use RfB? standard / comparable product
Reduction of price
relatively large total purchasing amount
Reduction of cycle time
Baseline for savings tool
competitive market
suppliers
a number of alternative suppliers
cost of an auction offset by price reduction
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 17
Whenever the word „auction“ is used in the purchasing context, a „reverse auction“ is meant. Difference between auction and reverse auction
€3 €3
Auction
€5
€5
Reverse auction
SELLER wishes to sell an item
BUYER wishes to purchase an item
Aim is to obtain the HIGHEST PRICE
Aim is to obtain the LOWEST PRICE
Each consecutive bid is HIGHER
Each consecutive bid is LOWER
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 18
English reverse auction is a “typical” reverse auction – suppliers submit progressively decreasing bids, with the lowest bidder winning.
price
English Reverse Auction
auto-accept level
accepted by buyer t
Price determined by SUPPLIERS Potential suppliers submit progressively decreasing bids, with the lowest bidder winning.
Source: BrainNet
Used when price is the sole consideration for awarding winners Very open level of information disclosure (or information release), where participant's bid details (like price and quantity) are revealed to competitors Sometimes an immediate win price is set, where a bid at the specified price immediately wins the quantity bid and cannot be outbid.
BrainNet “Purchasing 101” Training : DRAFT
Page 19
In the Dutch Reverse Auction the buyer steadily increases price throughout a time period (e.g. 5 minuten). Whichever seller reacts first, receives the contract.
price
Dutch Reverse Auction
RfX owner specifies: accepted by supplier t Price determined by the BUYER Items steadily increase in price until the first supplier agrees to sell some quantity of the item at the current price. Items open and close in serial order (consecutively), and only one line is open for bidding at any time.
Source: BrainNet
the initial price that bidding starts. the ceiling price that bidding stops (optional). the time interval to increment the item price. The total quantity desired. Whether participants must bid the entire quantity for each item, or can bid a partial quantity for a line item.
BrainNet “Purchasing 101” Training : DRAFT
Page 20
In the Japanese Reverse Auction, the buyer steadily decreases the price throughout a time period (e.g. 5 minuten). Whichever seller is the last to bid, receives the contract.
price
Japanese Reverse Auction
RfX owner specifies:
last bidding supplier left
t Price determined by the BUYER Items steadily decrease in price until there remains only one bidding supplier. Items open and close in serial order (consecutively), and only one line is open for bidding at any time.
Source: BrainNet
the initial price that bidding starts. the floor price that bidding stops (optional). the time interval to decrease the item price. The total quantity desired. Whether participants must bid the entire quantity for each item, or can bid a partial quantity for a line item.
BrainNet “Purchasing 101” Training : DRAFT
Page 21
To obtain the maximum benefit, auctions must be properly structured an organised. Preparing for an auction: Process view
Auction Suitability and Structuring
Determination of Auction Tactics and Setup
Publishing and Execution
Analysis of Results and Documentation
Objectives Outcomes and criteria are determined
Auction is checked and published
Results are checked and analyzed
Bundles/lots created
Auction basic data is set up
Auction has been run, winner can be determined
Auction results and decisions documented
Bidders selected
Auction line item details are set up
Suitability of items checked
Auction start decided
Source: BrainNet
Final approval and communication to participants
BrainNet “Purchasing 101” Training : DRAFT
Page 22
Sub-Process 1: “Auction Suitability and Structuring” I. Goods/Services suitability check
II. Bundling auction lots
Check the goods/ services suitability for auctioning according to criteria like degree of standardization (comparability), saving potential, total purchasing amount.
Bundle the products and services that have to be purchased offline. For each of the bundles the supplier is able to enter a specific price information.
Often the product is too complex and cannot exactly be purchased from different vendors. Then auctioning is not the suitable tool.
In case there is an inside structuring of the bundles necessary, the purchase has to structure the bundles in competitive lots (e.g. laptops split into executive laptops and employee laptops).
Source: BrainNet
III. Bidder Selection
on to Sub-process 2
Select appropriate suppliers for your RfB Check the supplier with your team. Approval of suppliers beforehand is necessary to avoid supplier disqualification afterwards. Evaluate potential deliverables to check how realistic they are.
BrainNet “Purchasing 101” Training : DRAFT
Page 23
Sub-Process 2: “Determination of Auction, Tactics and Setup” I. Set up outcomes and criteria
Determine potential outcomes and targets of the auction (e.g. target price or better market overview). Evaluate and if necessary weight all auction criteria (i.e. targets and potential outcomes) in regard to competitive pricing, competitive contract baseline and competitive product and services.
Source: BrainNet
II. Define auction type
Select the auction type most suitable for the items you wish to purchase. Decide whether the auction should be open or closed, define bid placement structure (e.g. decrements, etc.) and the auction timeline.
III. Set up auction on-line
on to Sub-process 3
Set up the auction in the eSourcing platform. Make sure to let a second person double check the entries you’ve made
BrainNet “Purchasing 101” Training : DRAFT
Page 24
Sub-Process 3 & 4: “Analysis of Results and Documentation”
I. Run the Auction
Perform the auction, monitoring the results and moderating wherever necessary.
Check auction result validity, analyze the auction results and find out the best fitting supplier (normally based on lowest price offer). In case results are not acceptable or the validity of some bids is not given you have to decide whether a new auction has to be run or not. Maybe it is sufficient to clarify invalidity with supplier. If the clarification with the supplier does not lead to an agreement, a bidder disqualification can be made by the purchaser.
Source: BrainNet
III. Document auction results and decisions
II. Result Analysis
Evaluate the recommendation for performance metrics and describe potential benefits in saving tool. Prepare final decision meeting with details of the auction results and completed guideline. After the meeting, document the final decision of the meeting within a meeting minutes and send it out to the participants via email. Attach the guideline template of the auction to that email. Wait for the approval of the Business Owner (and other stakeholders) via email before creating contract or purchase order.
BrainNet “Purchasing 101” Training : DRAFT
Page 25
When making the analysis of either RfP/RfQ or RfB, make sure you consider the total cost of the product / service Elements to take into consideration: Total Cost of Ownership („TCO“)
„Purchase costs“
Visible
Often invisible / difficult to calculate
Price
Cost of Capital
Customs
Internal Handling
Packaging
Operating costs
Transport
Effort to use
Insurance
Energy usage Maintenance / Repair
Total Cost
Spare parts Length of product life Cost of disposal
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 26
Gerne stehe ich Ihnen für Rückfragen zur Verfügung. Kontakt Information
Matt Zaleski
[email protected]
BrainNet Management Consultants GmbH
www.brainnet.com
Willy-Brandt-Allee 12 D-53113 Bonn / Tel. +49 228 725 37 0 Fax +49 228 725 37 37
Source: BrainNet
BrainNet “Purchasing 101” Training : DRAFT
Page 27
BrainNet Management Consultants GmbH Willy-Brandt-Allee 12 53113 Bonn, Fon: +49 (0) 228 72537-0 Fax: +49 (0) 228 72537-37
BrainNet Campus GmbH
BrainNet USA
BrainNet Wentech Kft.
BrainNet USA
Willy-Brandt-Allee 12 53113 Bonn,
Independence Wharf, 470 Atlantic Ave. Boston, MA 02210, USA
Bécsi út 3-5 H-1023 Budapest
203 North LaSalle Street, Suite 2100 Chicago, IL 60601, USA
Fon: +49 (0) 228 72537-0 Fax: +49 (0) 228 72537-37
Fon: +1 (617) 2738388 Fax: +1 (617) 2738001
Fon: +36 1 8019445 Fax: +36 1 3450729
BrainNet Hong Kong Ltd.
BrainNet China
BrainNet USA
BrainNet Sp. z.o.o.
59th Floor, Central Plaza 18 Harbour Road, Wanchai, Hong Kong
31/F, Jin Mao Tower, 88 Shi Ji Avenue Pudong, Shanghai, 200120 China
2202 N West Shore Blvd., Suite 200 Tampa, FL 33607, USA
Rynek 39 / 40 PL-50-102 Wrocław
Fon: +852 2594 8088 Fax: +852 2594 8099
Fon: +86 21 28909072 Fax: +86 21 28909999
Fon: +1 (813) 2884669 Fax: +1 (813) 6397501
Fon: +1 (312) 8277964 Fax: +1 (312) 3469603 BrainNet Switzerland GmbH
Utoquai 39 CH-8008 Zürich Fon: +48 (0) 71 344908-0 Fon: +41 (0) 44 Fax: +48 (0) 71 344908-9 38078-14 Fax: +41 (0) 44 www.brainnet.c 38078-16
om