Extreme Engineering 14 Statically Determinant Close Brisbane, Queensland
4th June, 2012 Kail, Project Manager Capital works, Extreme Engineering To Whom It May Concern: This letter confirms our mutual intent with respect to the potential contract described below, being between Black Suit Infrastructure (hereafter “The Client”) and Extreme Engineering (hereafter “The Contractor”). This document does not represent a legally binding contract. 1. of contract: The of the proposed contract are as follows: (a) Design. Contractor will provide a design for construction of a bridge and all ing structures, per client’s specifications document. Design shall cover engineering analysis, and the appropriate safety and environmental processes. The design shall adhere to all applicable Australian and International standards for same. (b) Construction. Contractor will act as a consultant for the construction process, acting as project management. The Client shall source and engage appropriate contractors to perform the construction, with specific details to be refined upon the Client’s acceptance of this proposal. (c) Deliverables. The Contractor shall deliver to the Client the following items: i.
A full design report;
ii.
A scale model of the bridge design;
iii.
Construction drawings for the bridge design.
Extreme Engineering 14 Statically Determinant Close Brisbane, Queensland
6. Miscellaneous. This letter constitutes the entire understanding and agreement between the Client and Contractor with respect to its content, hereby invalidating any extant agreements regarding said content. No agreement, other than as expressly stated above has been made to or by the parties hereto. This letter may be amended only by written agreement, signed by the parties to be bound by the amendment. 7. No Binding Obligation. THIS IS IN NO MANNER LEGALLY BINDING OR AN ENFORCEABLE OBLIGATION ON THE PART OF EITHER THE CONTRACTOR OR THE CLIENT. If the foregoing and conditions are acceptable to you, please so indicate by initialing each page and g the enclosed copy of this letter and returning it to the attention of the undersigned. Sincerely,
______________________________ Kail Sholz Project Manager, Extreme Engineering
ACCEPTED AND AGREED Blacksuit Infrastructure Name: Title:
______________________________
Date:
______________________________