NO.
I.
EQUIPMENT NAME
MODEL
Evaporation Pressure Parallel Control Experimental Equipment (E.P.R Control)
KTE-2000EP
IMAGE
(1) Being practicable to measure temperature at each of compressor inlet and outlet, condenser inlet and outlet, expansion V/V inlet and outlet, evaporator outlet, inside chamber, and outside using thermo couples of T-type. (2) Measure of pressure: Being practicable to measure within the range of -1bar ~ 35bar at each of compressor inlet and outlet, condenser outlet, expansion V/V outlet, and evaporator inlet by pressure sensors which are installed. (3) Experiment factors: Being practicable to calculate each factor of like as refrigeration effect, compressor work, condensing effect, evaporating latent heat, amount of flash gas at expansion V/V outlet, dry rate and humidity at expansion V/V outlet, and coefficient of performance in the abstract with temperature and pressure data which are measure. (4) Saving: Being saved on every minute until 1440min as excel file after click the icon ‘SAVE’. III. SPECIFICATION
Appearance and specifications may be changed by the upgrade.
II. FEATURE 1. Cycle composition: Compressor - Condenser - Receiver - Sight Glass – Filter Dryer - Solenoid Valve - Manual Expansion Value - Automatic Expansion Valve - Low temperature Evaporator (installed a check valve at outlet) High Temperature Evaporator (installed an E.P.R at outlet) - Accumulator Compressor. 2. Being practicable to operate on manual, thermal control or pump down with connecting by sequence or PLC control system (Include a textbook), and function for Specification of Refrigerator Performance Automatic Measuring and Data Acquisition and System Monitoring Program.
1. Mechanical device (1) Compressor: 3/4HP, for R-22, single 220V, Include Control Box (2) Condenser and Fan motor: 3/4HP, Air cooling, single 220V, 60Hz, 16W (3) Receiver: Cylinder type, Include a Service V/V 1) 1/2 Hp, 22kgf/cm2G, Pressure test(33kgf/cm2G) 2) Leak pressure(22kgf/cm2G), Down to 75℃, 90φ, 190mm, 265mm, 140mm (4) Evaporator (High temperature): Cylinder type (Transparent acrylic), Length 500mm, Diameter 300mm, Thickness 10mm, Chamber door (1EA, Diameter 300mm, Thickness 10mm, Size (H8mm, L170mm, W170mm) (5) Evaporator (Low temperature): Cylinder type (Transparent acrylic), Length 500mm, Diameter 300mm, Thickness 10mm, Chamber door (1EA, Diameter 300mm, Thickness 10mm, Size (H8mm, L170mm, W170mm) (6) Liquid Separator: 1HP, one inlet, VERTICAL TYPE (7) Nipple: 1EA at each of high and low pressure
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013 6
(8) Expansion V/V (Manual type) : Install at high or low evaporator (9) Expansion V/V (Thermal sensing type): Install at high or low evaporator (10) Solenoid V/V: ⅜″ Welding type (11) Filter dryer: ⅜″Welding type (12) Check V/V : ⅜″ Welding type (13) E.P.R : 0 ~ 5.5bar, 1/2 ″ Welding type (14) Pressure gages: 1EA each of high and low pressure, oil type (15) Sight glass : Welding type 2. Automatic control part (1) POWER, LAMP, PRESSURE MODULE 1) S.M.P.S (24V 3.1A) 2) N.F.B (15A, Single) 3) Volt Meter (DC 30V Full scale) 4) Am Meter (DC 3A Full scale) 5) Buzzer (DC24V) 6) AC Lamp (220V) 7) Lamp (DC24V) 8) Toggle S.W 9) Fuse & Holder 10) D.P.S 11) Terminal (2) MC, RELAY TERMINAL MODULE 1) Magnet (DC24V), 13A, 5a, 2b 2) Relay (DC24V, 8Pin) 3) Relay base 4) Terminal (3) S.W, TEMP MODULE 1) Electronic Digital Temperature Meter (AC 220V, -40 ~ 100℃) 2) Electronic Digital Temperature controller (AC 220V, -40 ~ 100℃) 3) Push Button (1a) 4) Push Button (1b) 5) Toggle Switch 6) Terminal
(4) MC, RELAY MODULE 1) Magnet (DC24V), 13A, 5a, 2b 2) Relay (DC24V, 8Pin) 3) Relay base 4) Terminal 3. Performance Automatic Measuring Equipment (1) Refrigerator Performance Automatic Measuring Equipment (KTE100DA) (2) Data Acquisition and System Monitoring Program (KTE-100SMP) 1) Function : Monitoring the measured data of temperature and pressure in real time, and enthalpy on a diagram of the refrigeration system in real time, and factors like as refrigeration effect, compressor work, condensing heat in condenser, evaporating latent heat, amount of flash gas at expansion V/V outlet, dry ratio at expansion V/V outlet, humidity at expansion V/V outlet, coefficient of performance in the abstract with temperature and pressure data which are measure in real time, and being saved data all of temperature, pressure and enthalpy on every minute as excel 2) Composition: Main Page, Sector for display of temperature data, graph chart of temperature, display of pressure data, graph chart of pressure, flowing diagram of the refrigeration system, display the P-H chart of the refrigeration system on real time, setting interval for saving data, and Run/Stop operation IV. ACCESSORIES, GUARANTEE AND DELIVERY 1. 2. 3. 4. 5. 6.
Power Cable: 1EA Connection Cable: 2EA Banana jack: Red 20EA, Black 20EA Manual book 1EA Delivery: 3Month Guarantee: For 1 year
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
KTENG CORPORATION | 2013 6
NO.
I.
EQUIPMENT NAME Refrigeration PLC Control Training Kit
MODEL KTE-4000PL
IMAGE
3. Should be available to study on software program about basic refrigeration system, defrosting system, heat pump system, binary refrigeration system, and brine refrigeration system. III. SPECIFICATION 4. Automatic Control Device (1) GLOFA G7M-DR30A 1) Operation process speed: 0.1(0.5) ㎲/Step 2) Maximum control point: 80 point 3) Program capacity: 68Kbyte 4) Function: PID, HSC, Position settlement, Cnet etc. (2) N.F.B (30A, single, 220V) (3) S.M.P.S (Output 24V) (4) AC Lamp: Red (5) Buzzer (DC24V) (6) Lamp: Red, Green, Yellow (7) Toggle Switch (8) Push Button (1a) (9) Select Switch IV. ACCESSORIES, GUARANTEE AND DELIVERY
Appearance and specifications may be changed by the upgrade.
1. 2. 3. 4. 5.
Lead Wire: 1set to 5EA & 1,500mm Wire 1set PLC Serial Cable: 1EA Manual book 1EA Delivery: 3Month Guarantee: For 1 year
II. FEATURE 1. Should possible PLC experimentation & training begin to progress at the refrigeration & air-conditioning industry. 2. Should be cording into a computer for experiment on programming about air conditioning and refrigeration using in industrial field.
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
6
KTENG CORPORATION | 2013
NO.
EQUIPMENT NAME Refrigeration Sequence Control Training Kit
MODEL KTE-4000SQ
I.
IMAGE
Appearance and specifications may be changed by the upgrade.
II. FEATURE 1. Trainee must be able to practice the skill related with control of Temperature, Pressure, Power, and defrost. Also every practice must be connected with a mechanical refrigeration system using PC cable using. 2. To adopt safe DC24V input power experiment and practice must be done. 3. Connect each of the following issues in favor of frozen copyright ed in the system using the original materials that it must be done. (1) Qualification to perform a function 1) Practice for wiring work 2) Lab experiments with the primary circuit to drive the switch configuration
3) Magnetic Switch (MC) with "a" "b" the circuit configuration driving experiments and practices 4) Using a thermal overload relay, circuit configuration driving experiments and practices 5) circuit configuration driving experiments and practices for “c” using a Relay(Ry) 6) circuit configuration driving experiments and practices for AND 7) circuit configuration driving experiments and practices for OR 8) circuit configuration driving experiments and practices for NOT 9) circuit configuration driving experiments and practices for NAND 10) circuit configuration driving experiments and practices for NOR 11) circuit configuration driving experiments and practices for rock up circuit using a MC 12) circuit configuration driving experiments and practices for inter rock 13) circuit configuration driving experiments and practices for low temperature control using a temperature switch 14) circuit configuration driving experiments and practices for high temperature control using a temperature switch 15) circuit configuration driving experiments and practices for low pressure control using a low pressure switch(LPS) 16) circuit configuration driving experiments and practices for high pressure control using a high pressure switch(HPS) 17) circuit configuration driving experiments and practices for cutting out high pressure control (2) Craft skill program for Air conditioning and refrigeration 1) 1 Experimental practice of motor running or reversing using Interlock circuit 2) 2 Experimental practice of motor running or reversing using Interlock circuit 3) Experimental practice motor operation using a Timer (instant running) 4) Experimental practice motor operation using a Timer (instant running) and a flicker relay 5) Experimental practice AUTO or MANUAL operation using a select switch 6) 1 Experimental practice motor ON or OFF operation using a ‘A’ push button
6
KTENG CORPORATION | 2013
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
7) 2 Experimental practice motor ON or OFF operation using a ‘A’ push button 8) 3 Experimental practice motor ON or OFF operation using a ‘A’ push button 9) Experimental practice motor running or reversing operation using a Timer (instant running) (3) Skill competition problem for air conditioning and refrigeration 1) 1Automatic control circuit of temperature for refrigerator 2) 2Automatic control circuit of temperature for refrigerator 3) Hot gas defrosting system using a timer and a solenoid valve 4) Circuit configuration for hot gas defrosting system and manual pump down 5) Circuit configuration when power is Off (4)
Temperature, pressure, and defrost control system 1) Circuit configuration for low temperature control and adjusting of Temperature switch 2) Circuit configuration for low pressure control and adjusting of Pressure switch 3) Circuit configuration for high pressure control and adjusting of refrigerator 4) Experimental practice configuration circuit for low temperature control of refrigerator 5) Configuration pump down circuit and operation in basic refrigeration system 6) Configuration hot gas defrosting circuit and operation (5) Refrigerant parallel expansion refrigeration system 1) Configuration temperature automatic control circuit for "refrigerant parallel expansion refrigeration system" and operation 2) Configuration temperature manual control circuit for "refrigerant parallel expansion refrigeration system" and operation 3) Configuration temperature pump down control circuit for "refrigerant parallel expansion refrigeration system" and operation 4) Configuration compulsory pump down control circuit and operation (6) Evaporation pressure parallel control refrigeration system
1) Configuration manual control circuit for "Evaporation pressure parallel control refrigeration system" and operation 2) Configuration automatic control circuit for "Evaporation pressure parallel control refrigeration system" and operation 3) Configuration pump down control circuit for "Evaporation pressure parallel control refrigeration system" and operation 4) Configuration compulsory pump down control circuit for "Evaporation pressure parallel control refrigeration system" and operation (7) Brine refrigeration system 1) Configuration manual control circuit for "brine refrigeration system" and operation 2) Configuration temperature automatic control circuit for "brine refrigeration system" and operation 3) Configuration pump down control circuit for "brine refrigeration system" and operation 4) Configuration compulsory pump down control circuit for "brine refrigeration system" and operation (8) Heat pump refrigeration system 1) Configuration circuit reversing refrigerant flow direction using manual V/V for "heat pump refrigeration system" and operation 2) Configuration manual control circuit (self-control) for "cooling and heating heat pump refrigeration system" and operation 3) Configuration temperature automatic control circuit for "cooling and heating heat pump refrigeration system" and operation 4) Configuration temperature and pressure automatic control circuit for "cooling and heating heat pump refrigeration system" and operation (9) Binary refrigeration system 1) Configuration manual control circuit of binary refrigeration system and operation 2) Configuration temperature automatic control circuit at No.1 cycle side (high pressure side) of binary refrigeration system, and manual control circuit at No.2 cycle side (low pressure side) of it 3) Configuration temperature automatic control circuit of binary refrigeration system and operation 4) Configuration pump down automatic control circuit at No.1 cycle, and temperature automatic control operation and operation
6
KTENG CORPORATION | 2013
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
5) Configuration compulsory pump down operation and operation (10) Air-conditioning system 1) Configuration circuit for mixture and heating between returned air (RA) and outside air (OA) of air-conditioning system and operation 2) Configuration circuit for mixture and cooling between returned air (RA) and outside air(OA) of air-conditioning system and operation 3) Configuration circuit for mixture, getting wet and heating between returned air(RA) and outside air(OA) of air-conditioning system and operation 4) Configuration circuit for mixture and preheating, cleaning and reheating between RA and OA of the air-conditioning system and operation 5) Configuration circuit for precooling of OA, and mixture of the OA and RA, and then cleaning and reheating operation 6) Configuration circuit for precooling of OA, and mixture of the OA and RA, and then cleaning and re-cooling operation III. SPECIFICATION
(18) (19) (20) (21) (22) (23) (24) (25)
Buzzer (DC24V) Toggle Switch Push Button (1a) Push Button (1a1b) Lamp Push Button (1a1b) Select Switch (3select) DC24V Motor Wire Assembly connector (36pin, 505mm)
IV. ACCESSORIES, GUARANTEE AND DELIVERY 1. 2. 3. 4. 5. 6.
Power Cable: 1EA Connection Cable: 2EA Banana jack: Red 20EA, Black 20EA Manual book 1EA Delivery: 3Month Guarantee: For 1 year
1. Electric device (1) N.F.B (30A, single) (2) Magnet (DC24V) (3) Thermal Overload Relay (4) Relay (DC24V, 8Pin) (5) Relay Base (DC24V, 8Pin) (6) Relay (DC24V, 11Pin) (7) Relay Base (DC24V, 11Pin) (8) IC Timer (DC24V, 60sec, 8Pin) (9) IC Timer Base (DC24V, 8Pin) (10) Flicker (DC24V, 60sec, 8Pin) (11) Flicker Base (DC24V, 8Pin) (12) Timer (DC24V, 24Hour) (13) Terminal Base (20Pin) (14) Terminal Base (15Pin) (15) Terminal Base (10Pin) (16) Terminal Base (3Pin) (17) Lamp (DC24V)
KTENG KTE-2000EP
PT. Graha Elektro Tama Jakarta, t: +62 21 385-6636 e:
[email protected]
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
6
KTENG CORPORATION | 2013