Sustainable Solutions in Energy and Environment
Disclaimer: Information in this presentation does not form of any offer and can be changed without prior notice. Thermax does not assume any obligation or liability arising from the use of this data in any form apart from its intended use of dissemination of preliminary information about Thermax only.
Sept 2015
Thermax Group
Our Belief : “Profit is not only a set of figures, but of values” Late Rohinton D. Aga 1935 – 1996 Founder, Thermax Sept 2015
Contents
• About Thermax Limited • Our Offering & Experience in Power • Our Experience with the Steel Industry • Our Capability • Key Projects Executed by us
Sept 2015
Sustaining Values & Brand Attributes
• Integrity • Respect
• Transparent • Trusted • Customer focused
• Fairness • Entrepreneurial • Excellence • Innovative • Commitment
• Socially responsible
4 Sept 2015
4
Subsidiaries & t Ventures Subsidiaries •
Thermax Engineering Construction Co Ltd
•
Thermax Instrumentation Ltd
•
Thermax Sustainable Energy Solution Ltd
•
Thermax Onsite Energy Solution Ltd
•
Thermax Inc., USA
•
Thermax Europe Ltd, UK
•
Thermax (Zhejiang) Cooling & Heating Engineering Co Ltd,China
•
Danstoker A/S, Denmark
•
RIFOX- Hans GmbH Spezialarmaturen,
•
PT Thermax International, Indonesia
•
Thermax Senegal Sarl
•
Themrax International Limited, Mauritius
•
Thermax do Brasil Energia e Equipamentos Ltda, Brazil
•
Thermax Hong Kong Ltd, Hong Kong
•
Thermax Netherlands B. V.
•
Thermax Denmarks ApS
•
Ejendomsanpartsselskabet Industrivej Nord 13, Denmark
•
Thermax Sdn. Bhd., Malaysia
•
Boilerworks A/S, Denmark
•
Boilerworks Porperties ApS, Denmark
•
Thermax Engineering Singapore Pte. Ltd
Sept 2015
t Ventures • Thermax Babcock & Wilcox, India • Thermax SPX Energy Technologies Ltd. , India
Our Global Presence
Index Manufacturing Unit
Sept 2015
Our Domestic & Distribution Network
Delhi
Ahmedabad
Kolkata
Vadodara
Mumbai Pune
Our network Headquarters
Hyderabad
Manufacturing facilities Engineering Sales & Service 108 Associates
Bangalore Chennai
7 Sept 2015
7
About Thermax Limited
Global Solution Provider in Energy & Environment Engineering Competence in Power, Heating, Combustion, Cooling & Environmental Products Rated as the best promising entrant in to the big league at the India Business Leader Award 2012 Over 3500 employees (2100 qualified engineers)
Sept 2015
Milestones •1966 : Started as Wanson India in Pune, manufacturing small coil-type packaged boilers (Vaporax), in collaboration with Wanson, Belgium. •1975 : Entered into the water treatment business. 1966•1976 : Acquires Tulsi Fine Chemicals, which later became the Chemical division of the company. 1979 •1979 : Started Enviro Division for Air Pollution Control equipment.
19801989
19902000
20012015
•1980 : ed as Thermax Limited. •1986 : Lunches the Thermax Service Franchise Scheme, a first of its kind in India. •1989 : Forms the t venture – Thermax Babcock & Wilcox Ltd. •1992 : Combined Heating and Power Group (CHAP) is formed which later became the Power division. •1995 : Thermax goes public with an issue (IPO) of 60,88,700 equity shares. •1996 : Single largest contract for captive power, water treatment and absorption cooling from Arvind Mills. •2000 : Acquires boiler company, M E Engineering Ltd, in UK & gets ISO 14001 certification for its manufacturing facility at Chinchwad. •2001 : Board reconstituted with 4 independent directors, 3 non-executive promoter directors and 1full-time director •2001 : Thermax starts subsidiary company, Thermax Inc, in the US. •2004 : Buys out Babcock & Wilcox stake in t venture; opens office in China. Thermax ranked No.3 among the top ten places to work (Business Today/Mercer Survey)for its chemical plant at Paudh •2005 : Featured in the Forbes Asia List of “Asia’s Best under a Billion” companies. •2006 : Incorporated wholly owned subsidy in China (Thermax Zhajiang) to expand its China operations by setting up Manufacturing plant for absorption Chiller. •2007 : Signs agreement with Georgia Pacific, Balcke-Durr & established new center for research, technology and innovation. •2008 : Signs license agreement with Babcok & Wilcox for utility boilers. •2009 : Forms JV with SPX for providing solution for large ESP, ACC RAPH & other heat exchangers & begins manufacturing chiller s in China. •2010 : Forms JV TBWES addressing supercritical market; acquires European company Danstoker & Omnical and technology transfer with Lambion . •2011 : Becomes a billion dollar company & Director ‘Anu Aga’ awarded Pa Shri. •2012 : Acquires Rifox, steam products company . •2015: Acquires stake in First Energy
Sept 2015
Our Business Profile
Boiler & Heater • Packaged Boiler. •Large Capacity power Boilers •Thermal oil/water heater •Energy recovery system
Cooling •Exhaust & multienergy filled chillers
•Steam fired chiller
•Gas based combined cycle
• Hot Water fired chillers
•Waste heat recovery based
•Direct fired chiller
•Renewable energy based (biomass, waste heat, solar) •Power plant management service.
Heating • steam boiler for power generation
• Packaged boilers , thermal oil heater & hot water generators suitable for solid/ oil/gaseous fuel •Engine exhaust waste heat recovery boiler
Sept 2015
Turkey Power Plants •Solid fuel based
Chemical •Ion exchange resins
Enviro •ESP & bag filters
Solar •Heating
•Scrubbers
•Cooling (Combining solar and thermal energy for client application
•Cooling water chemicals
•Air Purification
•Fireside chemical
•Retrofit & revamp
•Polyelectrolyte Water and wastewater •Wastewater & effluent water treatment systems •Water recycling •Waste management
Some of our past and present Technology Partnerships
Babcock & Wilcox, USA • More than 180 years of Combustion Experience
Balcke Dürr, • Brand under SPX Corporation
• TEC Group Company
• SPX Established in 1912
• More than 180 years of Combustion Experience
• Technical tie-up for solid fuel and Waste Heat Recovery
• t Venture Partners for super-critical Boilers
•Technical tie-up for Pollution abatement equipments
• t Venture Partners for Large ESP’s, Air Cooled Condensers and RAPH.
Sept 2015
Taiheiyo, Japan
•Technical tie-up for Cement Waste Heat Recovery
• Commissioned the First Cement Waste Heat Recovery Plant in India under this technology tie-up
Graver Water System LLC , USA •World’s leading water treatment company • Over 50 years of experience
• Technical tie-up for Condensate Polishing Units
• Serving the Supercritical Thermal and Nuclear Power Projects.
Certifications & AssociationsConforms to International Codes : ASME, BS, DIN, API, GOST, CE, JIS ISO 9001:2008, ISO 14001:2004
Associated with Consultants • Black & Veatch • BECHTEL • Toyo Engineering India Limited
• Mott Macdonald • Development Consultants Private Limited • DAELIM • Fichtner • Sargent & Lundy • Tata Consulting Engineers Limited
Sept 2015
Thermax – International Presence Global Footprints •
Presence in 13 + countries Close to 25 Business Associates across the Globe Global Presence with a customer base of over 25,000
Global Footprints
South East Asia
Middle East
North America
Europe
Africa
India
Our international installations consists of the following:
Sept 2015
Chillers
1000+ installations
Air Pollution Control
1000+ installations
Power Boilers
1000+ installations
Process Boilers
1000+ installations
Water Treatment Plants
1000+ installations
POWER BUSINESS
Sept 2015
Our offerings- Power Sector 1.Turnkey/ EPC (Engineer–Procure–Construct) solutions
Procurement Engineering
Turnkey EPC of Power Projects Commissioning
Sept 2015
Construction
Our offerings 2. FEED (Front End Engineering & Design) for power plants in • • •
Cogeneration Plants IPPs Captive Power Plants
3. Operation & Maintenance (O&M) for Power Plants • • • • • • •
IPP Cement Steel Chemical Ferrous / Non Ferrous Paper Sugar
4. Power projects on BOOT (Build–Own–Operate–Transfer) basis for • • •
Sept 2015
Biomass Waste heat recovery Distillery spent wash
Our Experience in Power •
Turnkey solutions for setting up power plants (EPC) Spanning over 100 varied power plant projects and experience of contracting about 3000 MW of power plants on EPC basis. Project Commissioned- 76 Projects Projects Under Execution- 25 Projects Portfolio of Power Generation of about 3000 MW.
Over 22,90,000 hrs of operational experience in Power Generation Industry More than 47000 Gwh generated from power plant projects commissioned •
Operation & Maintenance (O&M) services for power plants Over
35 projects under O&M contract
Sept 2015
International Presence – EPC Power projects
Bataan 2020 Inc National Cement Co
Lamsan Inc
Yemen Co of Sugar Refining
Isabela Biomass Energy Corporation BIOCOL Textured Jersey
Lamsan Ph2
Dangote Cement Ph 1 Dangote Ph 2 Evergreen Energy
Austcane
Overseas resources posted in • Kenya • Saudi Arabia • Indonesia • Philippines
Sept 2015
Our offerings- Boilers & Heaters Boilers offered under technical collaboration with Babcock & Wilcox, USA Heat recovery steam generator
Boilers offered with In-house Technology Waste heat recovery boiler Waste gas fired boiler
Utility boiler upto 800 MW
Traveling grate boiler
Packaged boiler (FM/HCFM/PFM)
Bi-drum solid fuel-fired boiler
Single-drum site-erected “Radiant” boiler
Spentwash boiler
Circulating fluidized bed boiler
Solar steam generator
Atmospheric fluidized bed boiler
Fired heaters (API type)
MSW/RDF fired boiler
19 Sept 2015
Cooling Business
Sept 2015
Our offering - Cooling Business • Direct Fired Chillers • Steam Fired Chillers • Hot Water Fired Chillers • Multi Energy Chillers • Ammonia Absorption Chillers • Heat Pumps • Chiller Heater
•
Established in 1984 in partnership with Sanyo
•
More than 6000 installations across 70 countries
•
1988 – Technical Collaboration 1994 – Independent
Major markets include USA, Europe, India, Middle East, South East Asia
2 State-of-the-art manufacturing facilities in Pune (India) and Zhejiang (China)
Range of Offerings –
Steam Driven Chillers: 50 – 3500 TR
–
Hot Water Driven Chillers: 10 – 3500 TR
–
Fuel (Liquid / Gaseous) Fired Chillers: 50 – 3000 TR
–
Multi-Energy Chillers: 50 – 3500 TR
–
Ammonia Chillers (For Sub-Zero Cooling): 50 – 1000 TR
–
Heat Pump: 500 KW – 30 MW
Sept 2015
Waste Water Solution Business
Sept 2015
Our Offerings – Waste Water Solution
- Raw Water Clarification / Pretreatment - Demineralization - Seawater Desalination - Cooling Water Treatment - Effluent Treatment - Waste Water Recycling Sept 2015
- Water Softening & Filtration - Reverse Osmosis - Membrane based Systems - Condensate Polishing - Sewage Treatment Plant
Our Offerings – Pollution Control Equipment • Bag Filters & Bag Houses
•Flue Gas Desulphurisation (FGD) Systems
• Electrostatic Precipitators •Gas Cleaning Plants for (ESP’s) • Particulate & Gaseous Scrubbers • Mechanical Dust Collectors • Modular Gas Coolers / Heat Exchangers
Metallurgical Applications •Coal & Pet coke Preparation Plants •Coal Injection and Cast House Dedusting Systems for Blast Furnaces / Smelters •Pushing Emission Control Systems for Coke Ovens
•Retrofits & Revamp of Existing Equipments
•Ammonia Flue Gas Conditioning Systems
•Dedusting and Fume Extraction Systems
•Services, Spares and Retrofit & Rebuild •Air Purification Systems with chemical filters for removal of corrosive / toxic / odorous gases
Sept 2015
Our distinctive competence
POWER BOILER & HEATER WATER & WASTE SOLUTIONS
EFFLUENT WATER
AIR POLUTION CONTROL ABSORPTION COOLING
POWER
FUEL
POWER PLANT
CHEMICALS AIR COOLED CONDENSER
Sept 2015
EMISSIONS
OPERATION & MAINTENANCE
Concept of EPC Design
Detailed Engineering
Turnkey Supply
Project Management
Erection and Commissioning
O&M Management
Performance Guarantee
On Site Training
Sept 2015
RISK MITIGATION
SINGLE POINT
WORLD CLASS EQUIPMENTS & SERVICES
Case study – SAIL, RSP •
Part of crude steel expansion project at SAIL – RSP
•
Scope includes design, engineering, manufacture, supply, erection and commissioning of 3 x 100 TPH BF gas fired boilers, 2 x 18 MW STG, 1 x 6.5 MW BPTG and associated balance of plant.
Sept 2015
Case study – Sesa Goa •
30 MW captive power plant on EPC basis for pig iron expansion project
•
Plant designed with waste heat recovery boilers having provision for external firing of coke oven gas.
•
Scope of work included river water intake system of 3 Km and BFG line of over 1 Km.
Sept 2015
Preferred EPC Player 1
Leader in captive EPC power generation market in India In-house Manufacturing of key Project Equipment's viz. Boiler, ESP, ACC & Water Solutions
2
Experienced Professionals from Power majors like Development Consultants, Black & Veatch
3
Contracted more than 100 power projects in 15 years
4
5
Sept 2015
Latest Technology deployed for Engineering and Project Management
Engineering ESTABISHED ENGINEERING STRENGTH
In-house expertise of Basic & Detailed Engineering Demonstrated experience In Sub Critical, Reheat, For Coal and Gas Plants With O&M we Design Friendly Plants • 3D Smart Plant • ETAP • GT & ST Pro • STAAD Pro • AFT •Auto CAD 3D Sept 2015
• Team – 171 Engineers • Power and Energy Experts for Separate Systems
Our IT Enablers State of the art software such as Smart Plant 3D Modeling, GT Pro, Steam Pro etc to simulate data. Software such as CEASAR II & STAAD are used for
piping stress & structural analysis Software such as ETAP for Electrical Load Flow Studies Advanced project management tools such as Primavera, MS Projects Software such as Smart Plant are utilized to
simulate real time conditions
Sept 2015
Project Management PROVEN RECORD OF SUCESSFUL COMPLETION Ability to handle over 18 Projects simultaneously
Use of Project Management Tools viz. Primavera
Over 40 IPMA Certified Professionals
Demonstrated experience of Working With Onshore Contractors Over 100,000 Man-hours of Project Management Experience
Sept 2015
Project Management Team
Project Managers
23
Project Engineers
22
Planning engineers
7
Manhours/annum
112320
Sept 2015
Procurement • 75,000 + sourcing man-hours per annum • Dedicated Team for Vendor Quality & Assessment • Global Sourcing Capability Gas / Steam Turbine & Generators GE, Siemens, Skoda, Fuji, Toshiba, Hitachi, Shin Nippon
Booster Gas Compressors Atlas Copco, Mann-Turbo, Camaroon. Hitachi Electrical Systems (HT & LT) ABB, Areva, Siemens, Schneider Electric DCS & Control Systems ABB, Emerson, Honeywell, Yokogawa Sept 2015
Construction & Supervision Piling Rigs in Action
Sea Water Intake
Mechanical Erection
Well Point Dewatering Sept 2015
Construction Team
Mechanical
82
Civil
43
Electrical
41
Instrumentation
11
Safety
14
Manhours/annum
421500
Commissioning Manhours/Annum
Sept 2015
69100
Health Safety & Environment
Certified for OHSAS:18001 (Occupational Health Safety Assessment Series) and ISO:14001 (Environment Management System) International Standard for continuous improvement in Health, Safety and Environment Sept 2015
Safety Achievements - OMPL Thermax has achieved award for the Best Safety Conscious Contractor for 3rd time(Apr13). The competition was 20 leading companies.
Sept 2015
Safety Achievements – JK Paper Best Safety Conscious Contractor -2013
Sept 2015
Safety Achievements – SAIL, RSP Letter of appreciation for 5.5 million safe man-hours without LTI
Sept 2015
Safety Achievements – Ultratech Cement
Sept 2015
Safety Achievements – Reliance CSP Project
Sept 2015
Quality Management Quality Policy “Our quality policy starts and ends with the customer as a focal point: understanding the customer's requirements, deg optimal solutions to meet those requirements, building systems and processes in place to ensure quality at every stage, and achieving our commitments on delivery and service before and after sales. It is our endeavor to create a culture of total quality where continuous improvement of our products becomes a way of life.
Quality Execution Quality is executed as per Quality System Manual
Dedicated team of 18 quality engineers are managing on day to day basis
Sept 2015
Quality Management
Inspection as approved QAP
Quality Manual
QualityQuality
Vendor & Sub
Site activities as per
Contractor
approved Field QAP’s
Evaluation
Vendor, site Audits
Sept 2015
Awards & Key Achievements Asian Power Awards 2012 Thermax Limited awarded gold prize for 1 x 12.5 MW Bataan 2020 Philippines, in the best biomass cogeneration plant of the year category by Asian Power Awards in Oct 2012
Multiple bonus recipient – •Rs. 6 Crores from DCW for Power plant performance •Rs 1 Crore bonus from Madras Cement Limited for early completion of 2x18 MW coal based power project •Rs 1.5 Crore bonus from JK Lakshmi Cement Limited for on time completion of 2x18 MW coal based power project •Rs. 1 Crores from Shree Cement Limited for 2x18 MW project •Rs. 27.22 Lacs for Efficiently Operating the Power Plant of ACC
Repeated orders from customers – • Long Gulf (Yemen) • Madras Cement (India) • JK Cement (India) • DCW Limited (India) • Aditya Birla (India) • Shree Metallic (India) Sept 2015
Coal Based Projects
Meenakshi Energy Private Limited, 300 MW, Andhra Pradesh, India • Tolling project executed on EPC basis in the coastal area of Andhra Pradesh • Consultant: Evonik Energy Services (India) Pvt Ltd • Configuration : 2x150 MW coal fired Independent Power Plant • 2x 495 TPH Thermax CFBC boiler (143 kg/cm2, 540 ± 5°C) • 2nos. Single reheat condensing turbine of Nanjing make. • 400 KV Power evacuation system, sea water intake system & 220 m twin flue chimney Sept 2015
Coal Based Projects
Indian Metal & Ferro Alloys Limited, 120 MW, Orissa, India • Captive power project to meet the power requirement of 2.7 lac tonnes per annum Ferro Alloy Plant • Consultant: DL • Configuration: 2x60 MW • 2x240 TPH Thermax Make CFBC boiler ( 101 kg/cm2, 540 ± 5°C) with 2 nos. pure condensing non reheating steam turbine of Hangzhou make. • Boiler designed to work on washery rejects as well as ROM Coal • Project execution on EPC basis
Sept 2015
Gas Based Projects
Arvind Mills, 2x27.5 MW, Gujarat, India • Combine cycle power plant • Consultant : Black & Veatch • Gas Turbine: GE (PGT-10) • Fuel : Natural Gas/ Naptha • 2 No. of Thermax HRSG & 1x6.5 Mw steam turbine; 2-2-1 combination per unit • First ever Tri-generation plant with inlet air cooling system (IAC) in India to provide ISO condition for Gas Turbine throughout the year including peak summer @ 40 Deg. C. • Plant executed on EPC basis and operational since 1996 Sept 2015
Gas Based Projects
ONGC Mangalore Petrochemical Refinery Ltd., 72 MW, Karnataka, India • Combine cycle power plant • Consultant : Toyo Engineering • Gas Turbine: Hitachi (H-25) • Fuel : Natural Gas / HSD/ LSHS • 2x100 TPH Thermax HRSG; Steam Turbine: Shin Nippon 1x28 MW; 2-2-1 configuration • 2x140 TPH Thermax Utility Boiler • HSRG designed for heavy oil firing • Project execution on EPC basis Sept 2015
Gas Based Projects
North East Electric Power Corporation, 46 MW, Tripura, India • Open cycle to close cycle conversion • 4 existing Gas Turbine - GE Frame-5 Machine • 2x23 MW bottoming cycle • 4x45 TPH Thermax HRSG (64 Kg/cm2, 480 Deg C); • Steam Turbine: Siemen 2x25 MW; 4-4-2 configuration • Project execution on EPC basis
Sept 2015
Biomass Based Projects
Kalpataru Power Transmission Limited, Rajasthan, India • 7.8 MW IPP Operation Since 2003 • First biomass & first project from India to be ed with UNFCCC for Clean Development Mechanism (CDM) with CERs in excess of 40,000 Tons of carbon equivalent in the first year itself. • First plant in India to run on highly alkaline Mustard stalk • 1X35TPH Thermax make travergrate Boilers (67 Kg/cm2, 485 Deg C); with 1 no. 7.8 extraction cum condensing Steam Turbine. • A proprietary travergrate fired combustion system incorporated for combusting highly alkaline and corrosive locally available biomass fuels Sept 2015
Biomass Based Projects
Bataan 2020, Philippines • 12.5 MW Cogeneration plant for a leading paper manufacturer in Philippines – Operation since 2003 • 100% Rice husk fired Thermax AFBC boilers of 78 TPH (66kg/m2, 490± 5°C) • 1 no. Shin Nippon Turbine make with control breed extraction • Operation & Maintenance also executing by Thermax • Project executed on EPC basis
Sept 2015
Industrial Based Projects –Steel
Steel Authority of India, 42.5 MW, Rourkela, Orissa, India • Part of crude steel expansion project at SAIL • Configuration : 2x18 MW + 1X6.5 MW • 3X100 TPH Thermax Blast Furnace Gas Fired Boilers (62 Kg/cm2, 485 Deg C); • Steam Turbine make: Shin Nippon • Thermax awarded certificate for three million accident free man hours during execution of this project • Project execution on EPC basis Sept 2015
Waste heat recovery based projects –Sponge Iron
Sree Metaliks (P) Ltd., Orissa, India • 8 MW captive Power Plant operational since 2004 & 20 MW Power Plant operational since 2007 • Configuration • 8 MW Power Plant based on waste heat from 4 x 100 TPD Sponge Iron kilns 4 x 9.6 TPH / 45 Ata / 420 Deg C WHRB along with 1 x 8 MW condensing steam turbine along with auxiliaries • 1 x 20 MW Power Plant based on waste heat from 4 x 100 TPD Sponge Iron kilns; ed by one AFBC boiler.1 x 38 TPH / 67 Ata / 490 Deg C WHRB & 1 x 41 TPH / 67 Ata / 490 Deg C AFBC Boiler along with 1 x 20 MW condensing steam turbine along with auxiliaries • First P in India to set up sponge iron Industry on an EPC basis.
Sept 2015
Waste heat recovery based projects- Sponge Iron
Tata Sponge Iron Ltd., Orissa, India • 18.5 MW Power Plant to meet the Power requirement of a sponge iron unit & also export power to grid • Configuration • 2x78 TPH Waste Heat Recovery Thermax Boiler (46 kg/cm2, 485 Deg C) and • 1 x 18.5 MW condensing steam turbine generator along with their auxiliaries. • First sponge iron enterprise in the country to earn benefits from carbon credits
Sept 2015
Industrial based projects - Cement
Madras Cement Limited, India • 72 MW Captive Power Plant for their existing cement plants at Alathiyur and Jayantipuram, • 36 MW at Alathiyur operational since 2005 • 36 MW at Jayantipuram operational since 2008 • Thermax awarded a second repeat order for executing a 40 MW Power Plant at Ariyalur • Thermax won Bullet bonus of Rs. 1 Crore for timely completion of project at Alathiyur • The overall operations maintenance (O&M) of both the plants has been awarded to Thermax • The Atmospheric Fluidized Bed Steam Generators are capable of firing Pet-coke, Coal & Lignite as fuel combinations Sept 2015
Industrial based projects - Cement
J K Cement Limited, Nimbahera India • 22 MW Captive Power Plant for cement plants & 15 MW from cement waste heat kiln • First project of its kind in India to be ed with UNFCCC for CDM benefits • Configuration : • 22 MW P : 89 TPH AFBC Boiler (89kg/cm2, 515 ± • 15 MW (WHR): 5 Nos. of Waste heat recovery boilers to generate 72 tph steam (at 18 kg/cm, 325± 5°C) Sept 2015
Manufacturing & Assembly Facilities
Pune, India
Paudh, India
Shirwad, India
• World Class facilities for Hot rolling (Max 200 mm thk), Cold Rolling (Max 130 mm thk) & Coil Strip welding • Dedicated manufacturing plants for Air Cooled Condensers, HRSG & Coil bending
Savli, India
Jiaxing, China Sept 2015
Danstoker, Denmark
Mundra, India
Solapur, India
Jhagadia, India
• State-of-the-art facility for Supercritical boilers in advance stages
Advantage Thermax IPMA (QPMP) Certified Project Managers to ensure timely completion of Projects Capability to handle more than 18 projects concurrently Guaranteed Power Plant Availability & Performance O&M Experience helps us Design Maintenance Friendly Power Plants
Operation
Engineering
& Maintenance
Management
Series of Bullet Bonuses for Early Completion of Subsidiary construction companyProjects to ensure timely completion of Project
Portfolio of More than Project 60 Power Projects Management across the Globe
Projects designed to meet international standards like ISO, ASME, DIN, IBR, TEMA, ASTM, AWS, BS, HEI, etc
Construction
Supply Chain
Management
Management
Management
Quality Policy with the Customer at its focal point
World Class Vendor Management System
Manufacturing Plant accredited with ISO 9001:2000, ISO 14001:2004, OHSAS 18001:2007, ASME S & U Stamps and MLSE, China Certificates
Sept 2015
International sourcing Capability Excellent Relation with Logistic Service Providers
Quality
Mechanical erection in excess of 120,000 MT and civil erection in excess of 300,000 m3 in last 2 years
Experience of working with all major Power Project Consultants in India
Thermax advantage Recipient of many bullet bonuses
Over 100 Projects on EPC
Wrap Around Guarantees
Ability To attract and mobilize resources
Fixed Cost & Schedule 35 - 40% Equipments manufactured In house
Sept 2015
Alliance with reputed vendors
Key considerations for choosing EPC contractor •
Is the EPC Company willing to take single point responsibility for executing the project?
•
Does the EPC Company have a successful track record of executing similar type of challenging projects and handling similar fuels?
•
Does the EPC Company have the financial strength to wade through the entire life cycle of project execution?
•
Is the contractor aware of the local legal issues that must be adhered to, to ensure smooth execution of the project?
•
Is the contractor a manufacturer of the key equipments that would be used in the power project?
•
Does the EPC Company offer after sales service? Sept 2015
Thank You For further details: Vivek Taneja Head of Business Development Ph: +91 20 66414814 (D) ; 66414000 (B) Email: