Contractor: Al-Toukhi Co. for Industry & Trading
JIZAN S EXTENSION PROJECT 263MW Contract #40621018/00
Testing & Commissioning Report:
GENERAL INSTRUCTION
Client: S.No. Saudi Description Electricity AdviseCo. all personnel working in or near to Southern a) protected area of possible audible or visual Operation Area alarms. Advice client, of any equipment, which willFM200 be TEST PROCEDURE FOR b) switched off during the test. Check that the system has been installed in c) accordance with the drawings or note any changes to the system against the drawings. Before carrying out any further checks ensure the extinguisher system is isolated electrically and d) mechanically, remove all pneumatic actuators if fitted. Visually inspect the perimeter of the area any e) possible leaks.
Status
Page No. 1/2 Remarks
SYSTEM
Manufacture: Protected Area: ______________________________________________________________________ Drawing Reference No.:______________________________________ Number of cylinders: _______________________________________ Sizes and model of nozzles:___________________________________ Number of nozzles: _________________________________________
AL-TOUKHI Name: Signatur e: Date:
AL-BILAD FFS LTD.
CONSULTANT/SEC-SOA