JOB SAFETY ANALYSIS Construction Right of Way WORK ACTIVITY: ___________________________________ Each piece of equipment and crew are associated with known specific hazards that cause accidents to reoccur on one project after another. P123456 Mhd. Abdul Rahman LOCATION ;____________________ ARAB -D SITE SUPERVISOR:___________________ PERMIT #:____________ Probability factors. 5
4
3
2
Evaluation Points 40-20High Risk
1
8 6 4 2 1 No 1
Severity Factors 8: Fatality, Permanent Disability
Probability Factors 5 : Extremely High
Abbreviation E.P :Evaluation Points
1 9 –12 Medium Risk
6: Serious Injury (LD>30 days)
4 : Highly Probable
S : Severity Factor
11-5 Low Risk
4: Major Injury (30>LD>4 days)
3 : Probable
P : Probability Factor
2: Minor Injury (4>LD>1 day)
2 : Rare
T : Total Points
1: Negligible
1 : Very Rare
4-1 Negligible
Activity ( Job Steps ) Arrival of personnel and equipments on site
Potential Hazard Unfamiliar with local situation and with site regulation (station) Incompetent operators and equipment not in good condition. Heat stress
Who/ What Might Be Harmed Personnel & Client’s Property
Personnel & Equipment
Risk E.P. SxP=T
LD : Lost Workdays
Control/ Recovery Measures All personnel to be fully briefed on tasks and responsibilities together with the use of PPE & Site induction before start of job. Must posses H2S training cards. Operators of equipments shall have valid license and third party certified. All required equipment & vehicle must be QTIC inspected and copy of Isthimara shall be kept in the equipment. Before operation vehicle and
Target E.P. Responsible/ Action SxP=T By 2x1=2 Site supervisor, And Site Safety Officer. BCEC PMV, Client 2x1=2
No
Activity ( Job Steps )
Potential Hazard
Who/ What Might Be Harmed
Risk E.P. SxP=T
Control/ Recovery Measures
Target E.P. SxP=T
equipment must have an approved entry from the client. Vehicle & equipment insp. must be done & recorded. Keep fire extinguisher.
Personnel
2
3
Clearing, grubbing, backfilling and compaction
Equipment working under overhead line
Heat stress shelters to be provided for workers. Drinking water supply always available. Standby vehicle on site for emergency purpose. Banksman to be assigned in every equipment in operation. Rotating lights and reverse alarm always operational.
2x1=2
Collision of equipment or being run over.
Personne & Client’s Property
Breakdown of equipment and oil/ fuel spill.
Equipment & Client Property
Regular checking of equipment with checklist at first working hour. Avoid spills and remove contaminated soil
Personnel Injury and dust
Personnel
Ensure complete PPE to be worn
2x1=2
with authorized live overhead line
Personnel Equipment and clients property
Maximum height of working equipment is 3.5 meters.
3x2=6
Equipment might hit the line post.
No dumping under or near OH line
Page 2 of 3
3x2=6
Responsible/ Action By
Site supervisor, and Site Safety Officer
Site supervisor, and Site Safety Officer
2x1=2
Site supervisor, and Site Safety Officer
No
Activity ( Job Steps )
Potential Hazard
Who/ What Might Be Harmed
Risk E.P. SxP=T
Target E.P. SxP=T
Control/ Recovery Measures Overhead line clearance certificate shall be approved with PTW by Authorized person.
Responsible/ Action By
Site supervisor, and Site Safety Officer
Operators and drivers shall aware of overhead line. Banksman assigned that equipment will work with the maximum awareness the line and posts.
PREPARED BY (HSE) Name
REVIEWED BY (QP)
----------------------------------------
Name
----------------------------------------
Signature ---------------------------------------
Signature ---------------------------------------
Date
Date
---------------------------------------
Page 3 of 3
---------------------------------------